1 DALAM MAHKAMAH RAYUAN MALAYSIA (BIDANGKUASA RAYUAN) RAYUAN SIVIL NO. : W-01(A)-412-10/2016 CEMERLANG LAND SDN BHD … PERAYU
/akn/my/judgment/court-of-appeal/2017/a56941d4-1d1a-41e0-bf56-9e527ff73e6e
Court of Appeal of Malaysia1 Aug 2017W-01(A)-412-10/2016
The written judgment as the court issued it, with the coram, case number, and source links. Every paragraph has its own anchor.
Citations and treatment detected automatically from later judgments and the authorities this decision relies on.
Later cases and laws citing this decision
Not yet cited by a later decision.
Earlier cases and laws this decision relies on
“cable, are also different. The relevant legislations in this appeal are the Housing Developers (Control And Licensing) Act 1966 and the Housing Development (Control and Licensing) Regulations, 1989. The Act provides for the control and licensing of the business of housing development, the protection of the interest of”
Auto-detected from judgment text; not a substitute for a citator check.
Content
1 DALAM MAHKAMAH RAYUAN MALAYSIA (BIDANGKUASA RAYUAN) RAYUAN SIVIL NO. : W-01(A)-412-10/2016 CEMERLANG LAND SDN BHD … PERAYU
1
ALI BIN SAAT [NO. K.P: 600928-08-6075]
2
TRIBUNAL TUNTUTAN PEMBELI RUMAH … RESPONDEN-DI DENGAR BERSAMA [RAYUAN SIVIL NO.: W-01(A)-415-10/2016] CEMERLANG LAND SDN BHD …
1
ABDUL RAHIM BIN KHAIRULDIN [NO. K.P: 521104-01-5519]
2
NORAZMAN BIN ABDUL RAHIM [NO. K.P: 880410-01-5829] … RESPONDEN- 2 [RAYUAN SIVIL NO: W-01(A)-417-10/2016] CEMERLANG LAND SDN BHD … PERAYU
1
SITI AMAH BT JA’AFAR [NO. K.P: 550817-01-5298]
2
TRIBUNAL TUNTUTAN PEMBELI RUMAH … RESPONDEN-Dalam Mahkamah Tinggi Malaya di Kuala Lumpur (Bahagian Rayuan dan Kuasa-Kuasa Khas) Permohonan Untuk Semakan Kehakiman No: 25-66-04/2015 Antara Cemerlang Land Sdn Bhd … Pemohon Dan
1
Ali Bin Saat [No. K.P: 600928-08-6075]
2
Tribunal Tuntutan Pembeli Rumah … Responden-Responden Dalam Mahkamah Tinggi Malaya Di Kuala Lumpur (Bahagian Rayuan dan Kuasa-Kuasa Khas) Permohonan Untuk Semakan Kehakiman No: 25-66-04/2015 3 Antara Cemerlang Land Sdn Bhd … Pemohon Dan
1
Abdul Rahim Bin Khairuldin [No. K.P: 521104-01-5519]
2
Norazman Bin Abdul Rahim [No. K.P: 880410-01-5829] … Responden-Responden Dalam Mahkamah Tinggi Malaya Di Kuala Lumpur (Bahagian Rayuan dan Kuasa-Kuasa Khas) Permohonan Untuk Semakan Kehakiman No: R2-25-67-04/2015 Antara Cemerlang Land Sdn Bhd … Pemohon Dan
1
Siti Amah Bt Ja’afar [No. K.P: 550817-01-5298]
2
Tribunal Tuntutan Pembeli Rumah … Responden-Responden Judicial Review — Decisions of the President of Tribunal for House-Buyers’ Claims — Damages for late delivery of vacant possession — Revived housing project under PR1MA Scheme — A new sale and purchase agreement was drawn up and executed between Appellant and Respondent — By the Deed of Revocation the Respondent had agreed to revoke and rescind the 1st Agreement — Benefit enjoyed by Respondent — Respondent was given vacant possession of the unit which he bought under the 2nd Agreement with the same purchase price and deposit paid under the 1st Agreement was 4 refunded — Deed of Revocation and 2nd Agreement were not in accordance to the prescribed forms — Whether tribunal acts within the proper scope of its statutory function — Whether decision of tribunal may be reviewed on the grounds of illegality, irrationality and proportionality — Whether courts are permitted to scrutinize such decisions not only for process but also for substance — Order of the High Court was set aside — Appeal is allowed — Housing Development (Control and Licensing) Act 1966 [Act 118], section 8A, section 16 N (2); Housing Development (Control and Licensing) Regulations, 1989 [P.U.(A) 58/89], Regulation 11, Schedule G & H CORAM: TENGKU MAIMUN BINTI TUAN MAT, JCA VERNON ONG LAM KIAT, JCA HASNAH BINTI DATO’ MOHAMMED HASHIM, JCA JUDGMENT INTRODUCTION [1] There were three appeals before us arising from three applications for judicial review in the High Court emanating from one judgment of the learned Judicial Commissioning. They involved different Respondents but the same Applicant (Appellant) and were all heard together. The three appeals were against the decision of the learned Judicial Commissioner dismissing the Appellant's application for judicial review. The Appellant had applied for an order of certiorari to quash the decision of the President of the Tribunal 5 Tuntutan Pembeli Rumah (“the Tribunal”) made on 26.1.2015 (‘the Award’). The Tribunal had on the said date awarded the Respondents damages for late delivery of vacant possession by the Appellant. The Appellant, dissatisfied with the decision of the learned Judicial Commissioner appealed to this Court. [2] We heard the appeal on 27.3.2017. After due deliberation and having carefully considered the submissions of both parties we found that there are merits in the appeals and allowed all the appeals with costs. We propose to give reasons for our decisions with respect to all the appeals in one common judgment. Since the facts are common for all the three appeals, for purposes of this judgment, we will only be referring to the facts in Appeal No. W-01(A)- 412-10/2016, which parties had agreed to refer in their submissions. MATERIAL FACTS [3] The background facts are important to understand the context in which these appeals were brought. The Appellant, is a company incorporated in Malaysia and is a housing developer previously known as Genting Unggul Sdn. Bhd. The Respondent entered into a Sale and Purchase Agreement dated 25.6.2002 ("the 1st Agreement") with the Appellant to purchase one apartment unit described as No. AC-03-02 at Amber Court, Desa Larkin, 6 Johor (‘Amber Court Project’). The purchase price of the said unit was RM25,000.00. Clause 22 of the 1st Agreement stipulates that the handing over of vacant possession of the unit shall be within thirty-six (36) months from the date of the aforesaid agreement. [4] The Amber Court Project consists of five blocks of 700 units of low cost flats i.e Blocks A-E. Under the 1st Agreement the Respondent‘s unit was located on the 3rd floor Block C. Unfortunately, the Amber Court Project could not be completed within the period stipulated in the said agreement. On 31.12.2005 the Jabatan Perumahan Negara declared and classified the Amber Court Project as an abandoned project. [5] However, steps were undertaken by the authorities to revive the abandoned project. Subsequently a new development order was issued to revive the project and to build “…179 Unit Rumah Teres 2 ½ Tingkat di atas Lot 20203, Jalan Merak dan 3 Blok Rumah Pangsa 5 Tingkat (248 Unit Rumah Kos Rendah 650 kaki persegi di atas Lot PTB 20184, Jalan Rajawali, Mukim Larkin, Johor.’ In 2014 the Jabatan Perumahan Negara after having classified the housing project as ‘Projek Perumahan Bermasaalah di Negeri Johor’ took steps to revive the housing project 7 under the PR1MA Scheme. The Appellant was appointed as the developer of the said project by the relevant authorities. [6] The original purchasers of the abandoned project (including the Respondent) were offered by the Appellant to participate in the said revived project. Sometime in 2010 the Respondent was offered by the Appellant to purchase one unit of the low cost flat known as Project Larkin Court 1 i.e Unit A-2-1 Blok A Tingkat 2 Rumah Pangsa No.1. By a letter of acceptance the Respondent accepted the offer and agreed to revoke the 1st Agreement. [7] A Deed of Revocation dated 9.7.2013 was executed between the parties whereby it was mutually agreed to revoke and rescind the 1st Agreement and to treat the said agreement as null and void, “1. In consideration of the premises herein the parties hereto mutually agree to revoke and rescind the sale and Purchase Agreement as null and void.” [8] A new sale and purchase agreement dated 9.7.2013 was drawn up and executed between the Appellant and the Respondent (“the 2nd Agreement’). The purchase price of the new unit remained at RM25,000.00 8 and the completion date as stipulated in the said agreement is within 3 months from the date of the said 2nd Agreement. [9] The said revived project was completed and vacant possession of the unit was duly handed over to all the purchasers including the Respondent within the time stipulated in the aforesaid 2nd Agreement. [10] Sometime in 2014 the Respondent filed a claim against the Appellant with the Tribunal for late delivery of the unit he purchased under the 1st Agreement. The Tribunal awarded to the Respondent compensation for late delivery of vacant possession. Dissatisfied with the decision of the Tribunal the Appellant filed the judicial review in the High Court. The Tribunal [11] The decision of the President can be found at pages 295-335 of the Appeal Records. He concluded that the 2nd Agreement together with the Deed of Revocation were executed without the approval of the Jabatan Perumahan Negara and that the 2nd Agreement executed by the parties was not in accordance to the agreement as prescribed in Schedule H of the Housing Development (Control and Licensing) Regulations, 1989 (‘HDR’). Regulation 11 of HDR provides as follows: 9 “Every contract of sale for the sale and purchase of a housing accommodation together with the subdivisional portion of land appurtenant thereto shall be in the form prescribed in Schedule G and where the contract of sale is for the sale and purchase of a housing accommodation in a subdivided building in the form of a parcel of a building or land intended for subdivision into parcels, as the case may be, it shall be in the form prescribed in Schedule H.” [12] The President of the Tribunal opined that the 1st Agreement can only be terminated in accordance to section 8A of the Housing Development (Control and Licensing) Act 1966 (“the Act”) and concluded that the revocation of the 1st Agreement as well as the execution of the 2nd Agreement were null and void as they were not in accordance with the requirement of the law. The Appellant was therefore still bound by the terms and conditions of the 1st Agreement. Furthermore, the Appellant failed to obtain the approval of the Jabatan Perumahan Negara as required under Regulation 11(3) HDR. He explained in his written findings as follows: “52. Selaras dengan dapatan Tribunal keatas Isu-Isu (i), (ii) dan (iii) diatas, Tribunal mendapati bahawa penghujahan-penghujahan yang 10 dikemukakan oleh Responden seperti dinyatakan dalam perenggan 26
i
(i), (ii) dan (vi) di atas adalah tidak berasas dan adalah ditolak atas alasan bahawa –
i
(i) Responden tidak boleh menamatkan sesuatu perjanjian jual beli rumah melainkan selaras dengan peruntukan 8A Akta 118 dan Peraturan dibawahnya;
Subparagraph
(ii) Pembatalan Perjanjian Pertama dan pemeteraian Surat Indemniti, Surat Kuasa dan Perjanjian Kedua tanpa kelulusan atau kebenaran khas oleh JPN di bawah Peraturan 11(3) adalah tidak sah kerana ia merupakan suatu perbuatan berkontrak keluar daripada peruntukan khusus Akta 118 dan Peraturan dibawahnya. Responden adalah masih terikat dengan syarat-syarat Perjanjian Pertama untuk menyerahkan milikan kosong rumah dan kemudahan kemasyarakatan yang dibeli oleh Pemohon di bawah Perjanjian Pertama dalam tempoh 36 bulan dari tarikh Perjanjian Pertama ditandatangani; 11
Subparagraph
(iii) Sekiranya Responden, sebagai kontraktor penyelamat, hendak mengecualikan dirinya daripada membayar gantirugi yang ditentukan atas kelewatan menyerahkan milikan kosong rumah dan kemudahan kemasyarakatan di bawah projek yang terbengkalai kepada Pemohon dan pembeli-pembeli lain, Responden hendaklah memohon dan mendapatkan kebenaran khas sedemikian daripada JPN di bawah Peraturan 11 (3) Peraturan Pembangunan Perumahan (Kawalan dan Pelesenan)1989…” [13] The President concluded that the Respondent’s claim for compensation for late delivery was not time barred. The Appellant failed to hand over vacant possession to the Respondent under the 1st Agreement and there was therefore a delay of 3111 days calculated from 25.6.2005 until 31.12.2013. The High Court [14] The learned Judicial Commissioner dismissed the judicial review application as he found that the President of the Tribunal did not commit any serious errors of law in arriving at his Award. The Respondent had no other remedy as a result of the breach of the 1st Agreement by the Appellant. He was of the considered view that if an order for certiorari was 12 granted the Appellant would not be responsible for the breach of the agreement for the failure of not handing over vacant possession as stipulated in the 1stAgreement. In his grounds of judgment the learned Judicial Commissioner said this when refusing judicial review: “[20] Pada pendapat mahkamah ini:
a
(a) mengikut autoriti kes Law Pang Ching & Ors v. Tawau Municipal Council, oleh kerana pihak pemohon sebagai pemaju projek perumahan telah melanggar terma kontrak-kontrak yang diikat pada tahun 2002, mahkamah ini tidak akan melaksanakan budi bicaranya bagi membantu pemohon, sekalipun jika terdapat kekhilafan undang-undang pada keputusan Presiden yang terpelajar; dan
b
(b) mengaplikasikan formula yang digubal oleh Lord Woolf MR dalam kes exparte Douglas-Williams (supra), suatu perintah certiorari tidak menjadi wajar atau perlu demi kepentingan keadilan, kerana dalam kes ini, responden-responden tiada remedi lain terhadap perlanggaran kontrak oleh pihak pemohon berkenaan dengan persetujuan tahun 2002, seperti yang pihak pemohon sendiri akui. Jika 13 perintah certiorari diberikan kepada pemohon, ini akan bermakna bahawa pemohon tidak perlu menanggung akibat perlanggaran kontraknya sendiri.” The Appeal [15] Before us, learned counsel for the Appellant submitted that the Award made by the President of the Tribunal was wrong and could not be sustained in law and that the learned Judicial Commissioner had erred in upholding the said Award. It was submitted that in the light of the facts and the circumstances of the case put forth before the Tribunal, the decision arrived at was tainted with illegality and irrationality. The President had taken into account irrelevant considerations, failed to take into account relevant considerations and material facts and had acted against the weight and totality of the evidence. [16] The Federal Court case of R. Rama Chandran v. Industrial Court of Malaysia & Anor [1997] 1 CLJ 147; [1997] 1 MLJ 145 and the case of Ranjit Kaur a/p S Gopal Singh v. Hotel Excelsior (M) Sdn Bhd [2010] 8 CLJ 629; [2010] 6 MLJ 1 held that the decision of the inferior tribunal may be reviewed on the grounds of illegality, irrationality and possibly 14 proportionality and the courts are permitted to scrutinize such decisions not only for process but also for substance. [17] It is trite law that courts should not reverse an award of a tribunal unless there is proven a clear jurisdictional error. A jurisdictional error can arise when a tribunal does not act within the proper scope of its statutory function such as whether it has acted without sufficient evidence or on no evidence, or has misconstrued the law on an issue on which its decision is founded. (Re: Syarikat Kenderaan Melayu Kelantan Bhd v. Transport Workers' Union [1995] 2 CLJ 748; [1995] 2 MLJ 317). [18] As Gopal Sri Ram, JCA (as he then was) said in Datuk Bandar Kuala Lumpur v. Zain Azahari Zainal Abidin [1997] 2 CLJ 248 at page 269 : "... where the exercise of a decision is challenged on grounds of vires that is illegality, or unreasonableness, the Court is not confined merely to the decision-making process, but may examine the merits of the decision itself." [19] We are further guided by what was stated in the Federal Court case of Wong Yuen Hock v. Syarikat Hong Leong Assurance Sdn Bhd and Another Appeal [1995] 3 CLJ 344 at page 348: 15 "In exercising judicial review, the High Court was obliged not to interfere with the findings of the Industrial Court unless they were found to be unreasonable, in the sense that no reasonable man or body of men could reasonably come to the conclusion that it did, or that the decisions of the Industrial Court looked at objectively, are so devoid of any plausible justification that no reasonable person or body of persons could have reached them (see Lord Denning's judgment in Griffiths (Inspector of Taxes) v. J.P Harrison (Watford) Ltd [1962] 1 AER 909 at 916, and judgment of Lord Diplock in Bromley London Borough Council v. Greater London Council and Anor [1983] 1 AC 768 at 821)." [20] It is trite law that certiorari will lie to quash a decision made by a public authority in excess or abuse of jurisdiction or contrary to the rules of natural justice or where there is an error of law on the face of the decision of the public authority. For a decision to be quashed on judicial review, there must first be a decision by a decision maker, and the said decision affected the aggrieved party by either altering the rights or obligations or depriving him of the benefits which he has been permitted to enjoy. [21] The court must review the decision in order to determine the basis of a material mistake of fact on the part of the person who made the decision or 16 where the decision was arrived at arbitrarily, capriciously or mala fide or as a result of unwarranted adherence to a fixed principle or in order to further an ulterior or improper process, or where the functionary misconceived the nature of the discretion conferred upon him and took into consideration irrelevant issues or ignored relevant ones. [22] In the instant appeal the functions, powers and jurisdiction of the Tribunal are spelt out in the Act. Section 16 N (2) of the Act provides for the limitation to the jurisdiction of the Tribunal as follows: “(2) The jurisdiction of the Tribunal shall be limited to a claim that is based on a cause of action arising from the sale and purchase agreement entered into between the homebuyer and the licensed housing developer which is brought by a homebuyer not later than twelve months from-
a
(a) the date of issuance of the certificate of completion and compliance for the housing accommodation or the common facilities of the housing accommodation intended for subdivision, whichever is later; 17
b
(b) the expiry date of the defects liability period as set out in the sale and purchase agreement; or
c
(c) the date of termination of the sale and purchase agreement by either party and such termination occurred before the date of issuance of the certificate of completion and compliance for the housing accommodation or the common facilities of the housing accommodation intended for subdivision, whichever is later.” [23] Section16N (2) of the Act requires the Respondent as a house buyer to file the complaint 12 months from the date of termination of the sale and purchase agreement which would be the 1st Agreement. The essential facts to be considered is that under the 1st Agreement dated 25.6.2002 it was clearly provided by clause 22 of the said agreement, as follows: “22(1) Vacant possession of the said Parcel to which the water and electricity supply are ready for connection shall be handed over to the Purchaser within thirty-six (36) calendar months from the date of this Agreement; and
Subsection
(2) If the Vendor fails to hand over vacant possession of the said Parcel, to which water and electricity supply are ready for connection to the said Parcel in time, the Vendor shall pay immediately to the 18 Purchaser liquidated damages to be calculated from day to day at the rate of ten per centum (10%) per annum of the purchase price.” [24] It was common ground that the unit was not completed and available for delivery as provided under agreement. The purchaser's right of action for damages for breach of contract, following the general rule, accrued on the date of the breach, which in this case was the day after the time limited under clause 22, that is to say, on 24.6.2005 when the Appellant failed to deliver vacant possession as stipulated under the 1st Agreement. [25] The Respondent, however did not file any complaint to the Tribunal within the time as provided under the Act. The complaint for late delivery under the 1st Agreement was only filed after the execution of the 2nd Agreement and the handing over of the property to him. [26] By the Deed of Revocation the Respondent had agreed to revoke and rescind the 1st Agreement and to treat the said agreement as null and void subject to and upon the terms and conditions as agreed. It was also agreed that the progressive amount (i.e the deposit of RM2,500) paid by the Respondent to the developer shall be refunded. 19 [27] Counsel for the Appellant argued that in the present appeal the cause of action arose in the year 2005 which was the earliest instance when the Respondent has a complete cause of action where all the material facts to be proved has happened. It is further submitted that the cause of action under the 1st Agreement due to the failure to deliver vacant possession arose in year 2005. However, the parties had mutually revoked the 1st Agreement and executed the 2nd Agreement whereby the unit purchased by the Respondent was duly handed over. [28] The President of the Tribunal was also fully aware and conscious of the fact that the Respondent had by the Deed of Revocation revoked the 1st Agreement which was the basis of his complaint to the Tribunal the jurisdiction of the Tribunal that is, to hear and determine a homebuyer's claim arising out of a sale and purchase agreement entered into by the parties. He was also aware that the unit as described under the 2nd Agreement was handed over to the Respondent within the time stipulated. [29] This court is guided by the principles enunciated in the case of Aw Yong Wai Choo & Ors v Arief Trading Sdn Bhd & Anor [1991] 3 CLJ 2834; [1991] 2 CLJ (Rep) 294. The facts of the case are almost similar to the facts in the appeal before us. The plaintiffs in that case were purchasers 20 of houses developed by the first defendant under sale and purchase agreements entered into between the plaintiffs and the first defendant. The first defendant, however was unable to complete the project and the second defendant took over and completed the project. The court held that the second defendant decided to take over the project and built the houses according to more expensive specifications. The plaintiffs had all gained and enjoyed the benefit of such specifications. The court held that the plaintiffs were not entitled to claim liquidated damages for late delivery of the houses against the second defendant. His Lordship Peh Swee Chin J referred to the principles in the case of Shaw v. Applegate [1977] 1 WLR 970 in which Justice Buckley LJ held as follows:- “... the real test, I think, must be whether upon the facts of the particular case, the situation has become such, that it would be dishonest or unconscionable for the plaintiffs or the person having the right sought to be enforced, to continue to seek to enforce it.” [30] Relying on this principle, His Lordship held as follows:- ‘The extraordinary situation described above was such that it would be unconscionable for the plaintiffs to insist on strictly enforcing the obligation providing for the payment of the said liquidated damages for 21 late delivery of houses, and it was for this Court to decide how an equity should be satisfied.” [31] We find that that the learned Judicial Commissioner had misdirected himself when he said in his written judgement: “ Jika sekalipun terdapat apa-apa kekhilafan dari segi undang-undang yang telah dilakukan oleh Presiden Tribunal terpelajar, ianya tidak akan sama sekali menjejaskan keputusan untuk menolak permohonan certiorari yang dipinta. Oleh yang demikian, tidak perlu lagi mahkamah ini mempertimbangkan hujahan-hujahan peguam pemohon yang mendakwa bahawa Presiden Tribunal telah terkhilaf dari segi undang-undang.” [32] In his grounds of judgment the learned Judicial Commissioner said: “(b) mengaplikasikan formula yang digubal oleh Lord Woolf MR dalam kes ex parte Douglas-Williams (supra), suatu perintah certiorari tidak menjadi wajar atau perlu demi kepentingan keadilan, kerana dalam kes ini, responden-responden tiada remedi lain terhadap perlanggaran kontrak oleh pihak pemohon berkenaan dengan persetujuan tahun 2002, seperti yang pihak pemohon sendiri akui. Jika perintah certiorari 22 diberikan kepada pemohon, ini akan bermakna bahawa pemohon tidak perlu menanggung akibat pelanggaran kontraknya sendiri.” [33] With respect, we do not agree with the reasoning of the learned Judicial Commissioner that when it comes to exercising its discretion the test for the court to apply when deciding whether it should give relief is that it should be necessary or desirable to do so in the interest of justice. The facts of the case of Regina v HM Coroner for Inner London South District, ex parte Douglas-Williams CA [1999] 1 All ER 344 relied on by the learned Judicial Commissioner can be distinguished. In ex parte Douglas-Williams the deceased died in custody. The jury returned a verdict of accidental death and it was suggested that the coroner’s direction as to unlawful killing had been confusing, and that he was wrong not to leave open the possibility of a verdict of neglect. Lord Woolf MR in his judgment explained as follows: “The conclusion I have come to is that, so far as the evidence called before the jury is concerned, a coroner should adopt the Galbraith approach in deciding whether to leave a verdict. The strength of the evidence is not the only consideration and in relation to wider issues, the coroner has a broader discretion. If it appears there are circumstances which, in a particular situation, where in the judgment 23 of the coroner, acting reasonably and fairly, it is not in the interest of justice that a particular verdict should be left to the jury, he need not leave that verdict. He, for example, need not leave all possible verdicts just because there is technically evidence to support them. It is sufficient if he leaves those verdicts which realistically reflect the thrust of the evidence as a whole. To leave all possible verdicts could in some situations merely confuse and overburden the jury and if that is the coroner’s conclusion he cannot be criticised if he does not leave a particular verdict.” [34] The facts in the instant appeal are far from similar. The laws applicable, are also different. The relevant legislations in this appeal are the Housing Developers (Control And Licensing) Act 1966 and the Housing Development (Control and Licensing) Regulations, 1989. The Act provides for the control and licensing of the business of housing development, the protection of the interest of purchasers and for matters connected therewith. It confers the Tribunal, amongst others, the jurisdiction to hear claims for late delivery. There is also the issue of the 2nd Agreement entered into between the Appellant and the Respondent revoking the 1st Agreement. 24 [35] In our view the learned Judicial Commissioner had committed a grave error when he applied the principle formulated by Lord Woolf MR in the case of ex parte Douglas-Williams (supra) and brushed aside the facts and the law applicable before him. He decided not to consider the submission of the applicant whether there was an error on the part of the Tribunal and not to determine as well as to identify the error, if at all committed by the Tribunal. [36] As a judge, in exercising judicial review powers, the Judicial Commissioner must examine the decision of the Tribunal not only in relation to the process, but also for substance in order to ascertain if such decision was tainted with illegality, irrationality or procedural impropriety within the principles amongst others outlined in the case of Council of Civil Service Unions & Ors v. Minister for the Civil Service [1984] 3 All ER 935; Rama Chandran v. Industrial Court of Malaysia & Anor [supra] and Ranjit Kaur a/p S Gopal Singh v. Hotel Excelsior (M) Sdn Bhd [supra]. [37] It is an undisputed fact that the Respondent had executed the Deed of Revocation revoking the 1st Agreement and then executed the 2nd Agreement. The Judicial Commissioner had ignored the issue of jurisdiction of the Tribunal. Under the Act the Tribunal can only consider the complaint if it was made within the time stipulated and that the Tribunal can only award compensation for late delivery. The Respondent had benefitted from the transaction as he was not only given vacant possession of the unit which he 25 bought under the 2nd Agreement with the same purchase price but the deposit paid under the 1st Agreement was refunded to him. [38] We agree with the submissions of the Appellant's learned counsel that the decision of the President of the Tribunal ought to be set aside on the grounds that the decision is irrational and unreasonable. The Tribunal had also acted in excess of its jurisdiction as the complaint was made after the 2nd Agreement and the Deed of Revocation were executed. In the light of the facts and the factual matrix of the circumstances, we are satisfied that the decision of the President of the Tribunal when looked at objectively, is devoid of any plausible justification that no reasonable person or body of persons could have come to. On this ground alone the appeal ought to be allowed. [39] Thus, for the reasons given, we were of the unanimous view that the appeal must be allowed. The Order of the High Court was set aside. We made no order as to cost. The deposit was refunded. sgn (HASNAH BINTI DATO’ MOHAMMED HASHIM) Judge Court of Appeal, Malaysia Putrajaya Date: 1 August 2017 26 Counsels: For Appellant: Tetuan Mei Fun & Rajashree No. 17-2, Jalan Radin Bagus 6, Sri Petaling 57000 Kuala Lumpur. (Attention : Encik Rajashnee Suppiah) For Respondent, Tetuan Mohd Najid & Partners No. 6.01, Jalan Padi Emas 5/2, Bandar Baru Uda, 81200 Johor Bahru, Johor Darul Takzim. (Attention : Encik Mohd Fairuz bin Abdullah)