In paragraph 15 of the Defence, the Defendant pleaded that the utility map does not show the Plaintiff’s cables at the said Location. The Defendant referred to the “Report for Trial Hole Work @ Lorong Enggang Timur & Jalan Enggang” dated 17.7.2020 (at pp 17 - 39 and 42, B2) and the “Utility Detection And Mapping” prepared by I Map Enterprise in July 2020 (at p 40, B2) and submitted that the Defendant had performed the trial holes and utility mapping at the said Location and no cables belonging to the Plaintiff were shown at the excavation site. This was confirmed by DW1 and DW2 in their Witness Statements. In addition, despite the evidence by PW2 and PW5 on the existence of as-built drawings for the underground cables, the Plaintiff failed to furnish any as-built drawings for the said Location to the Defendant which could have mitigated or avoided the said Damage. The Defendant invited the Court to invoke an adverse inference under s 114(g) of the Evidence Act 1950 [Act 56] (‘EA 1950’), namely that, had the as-built drawings been produced, they would be unfavourable to the Plaintiff’s case. However, as submitted by the Plaintiff, the presence of its cable is indicated as “TM Cable” in the Site Plan (see pp 22 - 27, B2) and “TELEKOM DUCT” in green colour (p 40, B2). As regards the as-built drawings, this was not an appropriate case for an adverse inference to be drawn against the Plaintiff because the need for such drawings was only raised during the trial. In the letter sent by Jurutera SNS Sdn Bhd, the consultant for the Project, to TMB dated 20.8.2019, the enquiry merely pertained to the existence of any special guidelines which have to be observed. The relevant excerpt from the said letter is re-produced below: “… Untuk pengetahuan pihak tuan, kami dalam proses memohon permit kerja daripada pihak Dewan Bandaraya Kuala Lumpur (DBKL). Di dalam senarai semak permohonan tersebut, salah satu dokumen yang diperlukan oleh pihak DBKL ialah surat sokongan daripada agensi teknikal yang berkaitan, salah satunya ialah pihak TM. Ini berikutan terdapat laluan kabel yang akan merentasi kabel utiliti milik TM di beberapa laluan tertentu bermula dari PMU Ampang. Jalan Enggang, Jalan Enggang Timur 1, Jalan Jelatek, Jalan Ampang, Lorong Ampang 2, Jalan Taman U Thant, Jalan U Thant, Jalan Ampang Hilir, Jalan Langgak Golf, Jalan Tun Razak dan berakhir di PMU-Prince Court. Sekiranya terdapat sebarang garis panduan khas yang perlu dipatuhi semasa kerja-kerja merentang kabel dijalankan, kami berharap pihak TM dapat memaklumkan kepada kami agar kerja-kerja di tapak bina dapat berjalan dengan lebih lancar. Pihak kontraktor akan mematuhi segala garis panduan yang ditetapkan oleh pihak TM dengan sewajarnya. Bersama-sama ini disertakan pelan cadangan laluan kabel yang berkaitan untuk rujukan pihak tuan. …”. Earlier, on 2.3.2019, TMB had written to the consultant regarding the application for a letter of support from the “agensi teknikal luar” and TMB indicated the following: “…