Malaysia legislation
Section 4
Section 4
A person shall be eligible to apply for a feed-in approval allowing the person to participate in the feed-in tariff system if—
(a)
the person proposes to generate renewable energy from a renewable energy installation having an installed capacity of not more than thirty megawatts or such higher installed capacity as may be approved by the Minister; and
(b)
the person meets such other criteria as may be prescribed by the Authority from time to time.
Application for feed-in approval