/akn/my-01/state_gazette/unknown/jgn008y2005/no-814

Bahawa permohonan-permohonan telah diperbuat kepada Pengarah

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
State Subsidiary Legislation
Status
In force

Quick answer

About this state subsidiary legislation

Bahawa permohonan-permohonan telah diperbuat kepada Pengarah is Malaysia State Subsidiary Legislation, cited as State Subsidiary Legislation No. 814, currently marked in force.

Opening note

Preamble

Suggest a correction
  1. Whereas applications were made to the Director under the provisions of sub-section (i) of section 6 of the Malay Reservations Enactment 1936, by the proprietors of the holdings described in the Schedule hereto to have their holdings made Malay Reservations; And whereas notice of the said applications as required by sub-section (ii) was duly given; And whereas the period of two months prescribed by sub-section (iii) has since lapsed; Now, therefore, in exercise of the powers conferred by sub-section (iii), the Director of Lands and Mines, hereby declares the holdings described in the Schedule hereto to be Malay Re-servations. BUTIR-BUTIR KENYATAAN TANAH DESCRIPTION OF HOLDINGS Daerah/District—Batu Pahat. Mukim—Tg. Semberong. Bil. Surat Bil. Lot Luas Tuan Punya Berdaftar Punya Title No. Lot No. Area Registered Owners H.S.(M) P.T.D. Hektar 8729 21269 1.142 Hasnah binti Ikhsan 8906 21628 1.052 Zainorin bin Mijan 8907 21629 1.0183 Zaliah bte Mijan Bertarikh 24 Mac 2005 Dated 24 March 2005 [PTG(KEM) 34/2003-BP(SK. 46); PTDBP(KM)VII/4/2003] NASRI BIN MD. ALI Timbalan Pengarah Negeri Pejabat Tanah dan Galian Johor
Bahawa permohonan-permohonan telah diperbuat kepada Pengarah (No. 814)