/akn/my/act/pua/2025/179

KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2025
Sections
7

Quick answer

About this p.u. (a)

KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 is Malaysia P.U. (A), cited as P.U. (A) 179 2025, currently marked in force and first recorded in 2025.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh perenggan 64(2)(j) dan (l) Akta (Perancangan) Wilayah Persekutuan 1982 [Akta 267], Datuk Bandar, dengan kelulusan Menteri, membuat kaedah-kaedah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 1

Open as pageSuggest a correction

(1)

Kaedah-kaedah ini bolehlah dinamakan Kaedah-Kaedah (Perancangan)

Wilayah

Persekutuan

(Permohonan untuk

Kebenaran

Perancangan)

(Wilayah Persekutuan Kuala Lumpur) 2025.

Suggest a correction

(2)

Kaedah-Kaedah ini mula berkuat kuasa pada 16 Jun 2025.

Permohonan untuk kebenaran perancangan

Suggest a correction

Seksyen 2

Open as pageSuggest a correction

(1)

Suatu permohonan untuk kebenaran perancangan di bawah seksyen 21

Akta hendaklah dibuat oleh pemohon kepada Datuk Bandar dalam Borang A1, A2, A3, A4,

A5, A6, A7, A8, A9 dan A10 Jadual Pertama berserta dengan fi yang ditetapkan dalam Jadual Kedua.

Suggest a correction

(2)

Pada bila-bila masa selepas menerima permohonan di bawah subkaedah (1) dan sebelum permohonan itu ditentukan, Datuk Bandar boleh, secara bertulis, menghendaki pemohon memberikan apa-apa maklumat tambahan yang perlu untuk membolehkan Datuk Bandar memutuskan permohonan itu.

Perundingan

Suggest a correction

Seksyen 3

Open as pageSuggest a correction

Sebelum mempertimbangkan suatu permohonan untuk kebenaran perancangan yang dibuat di bawah kaedah 2, Datuk Bandar boleh, jika difikirkannya perlu, berunding dengan mana-mana pihak berkuasa yang berkaitan, jabatan, pertubuhan atau mana-mana orang yang berkepentingan mengenai permohonan itu.

P.U. (A) 179 3

Seksyen 4

Perintah pembangunan

Open as pageSuggest a correction

Datuk Bandar boleh—

(a)

memberikan kebenaran perancangan dan mengeluarkan suatu perintah pembangunan dalam Borang B Jadual Pertama kepada pemohon; atau

Suggest a correction

(b)

enggan memberikan kebenaran perancangan dan mengeluarkan suatu notis penolakan kebenaran perancangan dalam Borang C

Suggest a correction

Jadual

Suggest a correction

Jadual Pertama kepada pemohon.

Permohonan melanjutkan perintah pembangunan 5.

(1)

Suatu permohonan untuk melanjutkan perintah pembangunan di bawah subseksyen 24(2) Akta hendaklah dibuat oleh pemohon kepada Datuk Bandar dalam Borang D Jadual Pertama sebelum tamat tempoh perintah pembangunan berserta dengan fi yang ditetapkan dalam Jadual Kedua.

(2)

Datuk Bandar boleh memberikan atau enggan memberikan permohonan untuk melanjutkan perintah pembangunan dengan mengeluarkan masing-masing

Borang E1 atau Borang E2 Jadual Pertama kepada pemohon.

Pembatalan dan pengubahsuaian perintah pembangunan 6.

(1)

Jika didapati oleh Datuk Bandar bahawa apa-apa perintah pembangunan yang dikeluarkan berhubung dengan pembangunan itu patut dibatalkan atau diubah suai menurut subseksyen 25(1) Akta, Datuk Bandar hendaklah mengeluarkan

Borang F Jadual Pertama kepada orang yang diberikan perintah pembangunan itu.

(2)

Orang yang kepadanya perintah pembangunan berhubung dengan pembangunan itu dikeluarkan yang terkilan dengan pembatalan atau pengubahsuaian perintah pembangunan itu boleh menuntut pampasan daripada Datuk Bandar dalam

Borang G Jadual Pertama dalam masa yang dinyatakan dalam Borang F Jadual Pertama.

P.U. (A) 179 4

(3)

Apabila Borang G di bawah subkaedah (2) diterima dan selepas

Datuk Bandar memberi orang yang terkilan itu peluang yang munasabah untuk didengar,

Datuk Bandar hendaklah menawarkan suatu pampasan kepada orang yang terkilan itu dalam Borang H Jadual Pertama sebagaimana yang difikirkan memadai oleh

Datuk Bandar.

Bayaran fi tidak boleh dibayar balik 7.

Semua fi yang telah dibayar di bawah Kaedah-Kaedah ini tidak boleh dibayar balik.

Pembatalan 8.

Kaedah2 Ranchangan (Pembangunan), 1970 [P.U. (A) 7/1971] dibatalkan.

Kecualian dan peralihan 9.

(1)

Apa-apa permohonan yang dibuat di bawah Kaedah2 Ranchangan

(Pembangunan), 1970 [P.U. (A) 7/1971], yang disebut sebagai “Kaedah-Kaedah yang dibatalkan”, bagi suatu kebenaran perancangan, perintah pembangunan atau pelanjutan perintah pembangunan atau pengubahsuaian perintah pembangunan yang belum selesai sebelum tarikh permulaan kuat kuasa Kaedah-Kaedah ini hendaklah, selepas tarikh permulaan kuat kuasa Kaedah-Kaedah ini, diuruskan di bawah Kaedah-Kaedah yang dibatalkan itu seolah-olah Kaedah-Kaedah ini tidak dibuat.

(2)

Apa-apa perintah pembangunan atau pelanjutan perintah pembangunan atau pengubahsuaian perintah pembangunan yang dikeluarkan di bawah

Kaedah-Kaedah yang dibatalkan itu hendaklah, selepas tarikh permulaan kuat kuasa

Kaedah-Kaedah ini, terus berkuat kuasa dan mempunyai kesan sehingga perintah pembangunan atau pelanjutan perintah pembangunan atau pengubahsuaian perintah pembangunan itu tamat tempoh atau dibatalkan.

P.U. (A) 179 5

(3)

Apa-apa prosiding, sama ada sivil atau jenayah, atau tindakan penguatkuasaan yang dimulakan di bawah Kaedah-Kaedah yang dibatalkan yang masih belum selesai pada tarikh permulaan kuat kuasa Kaedah-Kaedah ini hendaklah, pada tarikh permulaan kuat kuasa Kaedah-Kaedah ini, diteruskan dan diselesaikan di bawah Kaedah-Kaedah yang dibatalkan itu seolah-olah Kaedah-Kaedah ini tidak dibuat.

P.U. (A) 179 6

Jadual

Suggest a correction

JADUAL PERTAMA

BORANG A1

[Subkaedah 2(1)]

CANTUMAN DAN PECAH SEMPADAN TANAH (PELAN SUSUN ATUR)

Kepada:

Datuk Bandar Kuala Lumpur

CANTUMAN DAN PECAH SEMPADAN TANAH (PELAN SUSUN ATUR)

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan

Guna Tanah

Bil./Unit

Luas Lantai

Peratus

Kediaman

▪ Sesebuah

▪ Berkembar

▪ Teres

▪ Pangsapuri/Kondominium/

Apartmen

▪ Rumah kos rendah

▪ Rumah mampu milik

Perdagangan

▪ Rumah kedai

▪ Pejabat

▪ Stesen minyak

Perindustrian

▪ Teres

▪ Sesebuah

▪ Berkembar

▪ Bertingkat

Pelajaran

▪ Pusat pengajian tinggi

▪ Sekolah menengah

P.U. (A) 179 7

Guna Tanah

Bil./Unit

Luas Lantai

Peratus

▪ Sekolah rendah

▪ Tadika

Kemudahan awam

▪ Rumah ibadat

▪ Balai polis

▪ Balai bomba

Infrastruktur

▪ Tangki air

▪ Pencawang elektrik

▪ Kolam oksidasi

▪ Sungai/Rezab parit

▪ Lain-lain

Kawasan hijau/Zon pemisah

Kawasan lapang/Rekreasi

Perkuburan

Rizab jalan

Lain-lain (sila nyatakan)

JUMLAH

4.

Senarai nama dan alamat *pemunya tanah berdaftar yang bersempadan:

i.

No. Lot

:

…………………………………..

ii.

No. Lot

:

………………………………..

Nama

:

…………………………………..

Nama

:

………………………………..

Alamat :

…………………………………..

Alamat

:

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

iii.

No. Lot

:

…………………………………..

iv.

No. Lot

:

………………………………..

Nama

:

…………………………………..

Nama

:

………………………………..

Alamat :

…………………………………..

Alamat

:

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

v.

No. Lot

:

…………………………………..

vi.

No. Lot

:

………………………………..

Nama

:

…………………………………..

Nama

:

………………………………..

Alamat :

…………………………………..

Alamat

:

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

vii.

No. Lot

:

…………………………………..

viii.

No. Lot

:

………………………………..

Nama

:

…………………………………..

Nama

:

………………………………..

Alamat :

…………………………………..

Alamat

:

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

…………………………………..

………………………………..

*Nota:

i.

Sediakan lampiran sekiranya ruang ini tidak mencukupi.

ii.

Sila sertakan salinan carian rasmi yang dikeluarkan sama ada oleh Pengarah Tanah Dan Galian,

Wilayah Persekutuan Kuala Lumpur atau Pengarah Jabatan Penilaian Dan Pengurusan Harta, DBKL.

5.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

P.U. (A) 179 8

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

……………………………………………

:

……………………………………………..

:

……………………………………………

Alamat

:

……………………………………………..

Alamat

:

……………………………………………

……………………………………………..

……………………………………………

……………………………………………..

……………………………………………

No. Telefon

:

……………………………………………..

No. Telefon

:

……………………………………………

No. Faks

:

……………………………………………..

No. Faks

:

……………………………………………

E-mel

:

……………………………………………..

E-mel

:

……………………………………………

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

…………………………………................

Tarikh

:

……………………………………………..

Tarikh

:

……………………………………………

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 9

BORANG A2

[Subkaedah 2(1)]

PEMBANGUNAN PERDAGANGAN/PERDAGANGAN BERCAMPUR

Kepada:

Datuk Bandar Kuala Lumpur

PEMBANGUNAN PERDAGANGAN/PERDAGANGAN BERCAMPUR

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii. Pecahan luas lantai mengikut komponen pembangunan

Jenis Kegunaan

Luas Lantai (kp)

Pejabat

Ruang perniagaan (runcit)

Hotel

Kediaman

Pangsapuri servis

Ruang penjaja (mengikut spesifikasi DBKL)

Tempat letak kereta

Lain-lain (sila nyatakan)

Jumlah

P.U. (A) 179 10

iii.

Pecahan kegunaan lantai dan keluasan mengikut lantai iv.

Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

v.

Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium vii.

Butir-butir komponen kediaman/pangsapuri servis/SoHo (jika berkenaan)

Jenis

Luas Lantai/Unit

Bil. Unit

Peratus

Harga Jualan/Unit

Jumlah viii.

Butir-butir komponen hotel (jika berkenaan)

i.

Bilangan bilik ii.

Saiz bilik iii.

Pengkadaran (bintang)

Tingkat

Kegunaan

Luas Lantai (kp)

Jumlah

(kp)

Pejabat

Hotel

Kediaman

Pangsapuri servis

Lain-lain

(sila nyatakan)

Tempat

Letak

Kereta

Ruang

Penjaja

(mengikut spesifikasi

DBKL)

P.U. (A) 179 11

ix.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

Jumlah x.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta bagi orang kurang upaya c.

Jumlah tempat letak kereta bagi pemandu wanita berseorangan d.

Jumlah tempat letak motosikal

4.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

………………………………………

:

……………………………………………..

:

………………………………………

Alamat

:

……………………………………………..

Alamat

:

………………………………………

……………………………………………..

………………………………………

……………………………………………..

………………………………………

No. Telefon

:

……………………………………………..

No. Telefon

:

………………………………………

No. Faks

:

……………………………………………..

No. Faks

:

………………………………………

E-mel

:

……………………………………………..

E-mel

:

………………………………………

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

…………………………………........

Tarikh

:

……………………………………………..

Tarikh

:

………………………………………

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 12

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

P.U. (A) 179 13

BORANG A3

[Subkaedah 2(1)]

PERMOHONAN UNTUK KEBENARAN PERANCANGAN PEMBANGUNAN KEDIAMAN

Kepada:

Datuk Bandar Kuala Lumpur

PERMOHONAN UNTUK KEBENARAN PERANCANGAN PEMBANGUNAN KEDIAMAN

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Kepadatan penduduk ii.

Jenis kediaman

Jenis Kediaman

Bilangan Unit

Banglo

Berkembar

Teres

Rumah pangsa/Kondominium/Apartmen

Rumah pangsa kos rendah/Rumah pangsa mampu milik

Jumlah iii.

Pecahan kegunaan lantai dan keluasan mengikut tingkat

Tingkat

Kegunaan

Luas Lantai (kp)

Jumlah

P.U. (A) 179 14

iv.

Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

v.

Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium vii.

Butir-butir komponen kediaman

Jenis

Luas Lantai/Unit

Bil. Unit

Peratus

Harga Jualan/Unit

Jumlah viii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

e.

Jumlah ix.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Lain-lain (sila nyatakan)

4.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

P.U. (A) 179 15

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

………………………………………

:

……………………………………………..

:

………………………………………

Alamat

:

……………………………………………..

Alamat

:

………………………………………

……………………………………………..

………………………………………

……………………………………………..

………………………………………

No. Telefon

:

……………………………………………..

No. Telefon

:

………………………………………

No. Faks

:

……………………………………………..

No. Faks

:

………………………………………

E-mel

:

……………………………………………..

E-mel

:

………………………………………

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

………………………………............

Tarikh

:

……………………………………………..

Tarikh

:

………………………………………

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 16

BORANG A4

[Subkaedah 2(1)]

PEMBANGUNAN PERINDUSTRIAN

Kepada:

Datuk Bandar Kuala Lumpur

PEMBANGUNAN PERINDUSTRIAN

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii.

Jenis Industri

Jenis Industri

Bilangan Unit

Sesebuah

Berkembar

Teres

Bertingkat

Jumlah iii. Pecahan kegunaan lantai dan keluasan mengikut tingkat

Tingkat

Kegunaan

Luas Lantai (kp)

Jumlah

P.U. (A) 179 17

iv.

Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

v.

Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium (jika berkenaan)

vii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

e.

Jumlah viii. Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Jumlah tempat letak lori f.

Lain-lain (sila nyatakan)

5.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

P.U. (A) 179 18

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

……………………………………

:

……………………………………………..

:

……………………………………

Alamat

:

……………………………………………..

Alamat

:

……………………………………

……………………………………………..

……………………………………

……………………………………………..

……………………………………

No. Telefon

:

……………………………………………..

No. Telefon

:

……………………………………

No. Faks

:

……………………………………………..

No. Faks

:

……………………………………

E-mel

:

……………………………………………..

E-mel

:

……………………………………

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

………………………………........

Tarikh

:

……………………………………………..

Tarikh

:

……………………………………

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 19

BORANG A5

[Subkaedah 2(1)]

PEMBANGUNAN KEMUDAHAN PELAJARAN

Kepada:

Datuk Bandar Kuala Lumpur

PEMBANGUNAN KEMUDAHAN PELAJARAN

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii.

Jenis kemudahan pelajaran (/)

iii.

Pecahan kegunaan lantai dan keluasan mengikut tingkat

Tingkat

Kegunaan

Luas Lantai (kp)

Jumlah a.

Creche b.

Tadika c.

Taska d.

Sekolah Rendah e.

Sekolah Menengah f.

Maktab g.

Sekolah Vokasional h.

Sekolah Perdagangan i.

Institusi Pengajian Tinggi j.

Lain-lain

P.U. (A) 179 20

vi.

Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

v.

Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai vii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

e.

Jumlah viii.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Lain-lain (sila nyatakan)

ix.

Bilangan pengajar/kakitangan x.

Bilangan murid-murid/pelajar xi.

Waktu operasi

Waktu buka

Waktu tutup

4.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

P.U. (A) 179 21

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

……………………………………………...

:

……………………………………………..

:

……………………………………………...

Alamat

:

……………………………………………..

Alamat

:

……………………………………………...

……………………………………………..

……………………………………………

……………………………………………..

……………………………………………

No. Telefon

:

……………………………………………..

No. Telefon

:

……………………………………………

No. Faks

:

……………………………………………..

No. Faks

:

……………………………………………

E-mel

:

……………………………………………..

E-mel

:

……………………………………………

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

……………………………….....................

Tarikh

:

……………………………………………..

Tarikh

:

……………………………………………..

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 22

BORANG A6

[Subkaedah 2(1)]

PEMBANGUNAN INSTITUSI AWAM DAN KEMUDAHAN MASYARAKAT

Kepada:

Datuk Bandar Kuala Lumpur

PEMBANGUNAN INSTITUSI AWAM DAN KEMUDAHAN MASYARAKAT

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii.

Jenis kemudahan/institusi iii.

Pecahan kegunaan lantai dan keluasan mengikut tingkat

Tingkat

Kegunaan

Luas Lantai (kp)

Jumlah iv.

Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

P.U. (A) 179 23

v.

Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium (jika berkenaan)

vii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

e.

viii.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Lain-lain (sila nyatakan)

5.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………. Nama

: ……………………………………………

:

……………………………………………. No. K/P

: ……………………………………………..

Alamat

:

……………………………………………. Alamat

: ……………………………………………..

…………………………………………….

……………………………………………

……………………………………………

……………………………………………

No. Telefon

:

……………………………………………

No. Telefon

:

……………………………………………

No. Faks

:

……………………………………………

No. Faks

:

……………………………………………

E-mel

:

……………………………………………

E-mel

:

……………………………………………

P.U. (A) 179 24

Cap jari/

Tandatangan

:

…………………………………...............

Cap jari/

Tandatangan

:

………………………………...................

Tarikh

:

……………………………………………

Tarikh

:

……………………………………………

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 25

BORANG A7

[Subkaedah 2(1)]

PERMOHONAN UNTUK KEBENARAN PERANCANGAN PEMBANGUNAN

STESEN MINYAK/PUSAT SERVIS KENDERAAN/BENGKEL

Kepada:

Datuk Bandar Kuala Lumpur

PERMOHONAN UNTUK KEBENARAN PERANCANGAN PEMBANGUNAN

STESEN MINYAK/PUSAT SERVIS KENDERAAN/BENGKEL

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii.

Jenis stesen minyak/pusat servis/bengkel iii.

Perkhidmatan (selain daripada jualan bahan api) yang dicadangkan (jika berkenaan):

a.

………………………………………………………………………………………………………………

b.

……………………………………………………………………………………………………………....

c.

……………………………………………………………………………………………………………….

iv.

Pecahan kegunaan lantai dan keluasan mengikut tingkat

Tingkat

Kegunaan

Luas Lantai (kp)

Jumlah

P.U. (A) 179 26

v.

Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Pump island

Stesen kanopi

Lain-lain (sila nyatakan)

vi.

Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vii.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium (jika berkenaan)

viii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

e.

ix.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Jumlah tempat letak lori f.

Lain-lain (sila nyatakan)

5.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

P.U. (A) 179 27

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

…………………………………….

:

……………………………………………..

:

…………………………………….

Alamat

:

……………………………………………..

Alamat

:

…………………………………….

……………………………………………..

…………………………………….

……………………………………………..

…………………………………….

No. Telefon

:

……………………………………………..

No. Telefon

:

…………………………………….

No. Faks

:

……………………………………………..

No. Faks

:

…………………………………….

E-mel

:

……………………………………………..

E-mel

:

…………………………………….

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

……………………………............

Tarikh

:

……………………………………………..

Tarikh

:

…………………………………….

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 28

BORANG A8

[Subkaedah 2(1)]

Kepada:

Datuk Bandar Kuala Lumpur

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii.

Jenis pembangunan iii. Pecahan kegunaan lantai dan keluasan mengikut tingkat

Tingkat

Kegunaan

Luas Lantai (kp)

Jumlah iv. Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

P.U. (A) 179 29

v. Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium (jika berkenaan)

vii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

e.

viii.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Jumlah tempat letak lori f.

Lain-lain (sila nyatakan)

5.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

…………………………………………

:

……………………………………………..

:

…………………………………………

Alamat

:

……………………………………………..

Alamat

:

…………………………………………

……………………………………………..

…………………………………………

……………………………………………..

…………………………………………

No. Telefon

:

……………………………………………..

No. Telefon

:

…………………………………………

No. Faks

:

……………………………………………..

No. Faks

:

…………………………………………

E-mel

:

……………………………………………..

E-mel

:

…………………………………………

P.U. (A) 179 30

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

……………………………..................

Tarikh

:

……………………………………………..

Tarikh

:

…………………………………………

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 31

BORANG A9

[Subkaedah 2(1)]

PENUKARAN KELAS KEGUNAAN TANAH DAN BANGUNAN

Kepada:

Datuk Bandar Kuala Lumpur

PENUKARAN KELAS KEGUNAAN TANAH DAN BANGUNAN

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah i.

No. Hakmilik Tanah ii.

No. Lot iii.

No. Seksyen/Mukim iv.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii.

Jenis pembangunan iii. Pecahan kegunaan dan luas lantai bangunan mengikut tingkat

Tingkat

Kegunaan Sedia Ada

Kegunaan Cadangan

Luas Lantai (kp)

Jumlah iv. Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

P.U. (A) 179 32

v. Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium (jika berkenaan)

vii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

viii.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Lain-lain (sila nyatakan)

4.

Senarai nama dan alamat *pemunya tanah berdaftar yang bersempadan:

i.

No. Lot

:

…………………………………..

ii.

No. Lot

:

……………….………………..

Nama

:

…………………………………..

Nama

:

…………….…………………..

Alamat :

…………………………………..

Alamat

:

………….……………………..

…………………………………..

…………….…………………..

…………………………………..

…………….…………………..

…………………………………..

………………………………..

iii.

No. Lot

:

…………………………………..

iv.

No. Lot

:

…………….…………………..

Nama

:

…………………………………..

Nama

:

…………….…………………..

Alamat :

…………………………………..

Alamat

:

………….……………………..

…………………………………..

……….………………………..

…………………………………..

…………….…………………..

…………………………………..

…………….…………………..

v.

No. Lot

:

…………………………………..

vi.

No. Lot

:

…………….…………………..

Nama

:

…………………………………..

Nama

:

…………….…………………..

Alamat :

…………………………………..

Alamat

:

…………….…………………..

…………………………………..

…………….…………………..

…………………………………..

……………….………………..

…………………………………..

……………….………………..

P.U. (A) 179 33

vii.

No. Lot

:

…………………………………..

viii.

No. Lot

:

………………………..……….

Nama

:

…………………………………..

Nama

:

……………...…………………

Alamat

:

…………………………………..

Alamat

:

………………………………...

…………………………………..

………………………………...

…………………………………..

………………………………...

…………………………………..

………………………………...

*Nota:

i.

Sediakan lampiran sekiranya ruang ini tidak mencukupi.

ii.

Sila sertakan salinan carian rasmi yang dikeluarkan sama ada oleh Pengarah Tanah Dan Galian,

Wilayah Persekutuan Kuala Lumpur atau Pengarah Jabatan Penilaian Dan Pengurusan Harta, DBKL.

5.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

…………………………………………

Nama

:

………………………………………………

:

…………………………………………

:

………………………………………………

Alamat

:

…………………………………………

Alamat

:

………………………………………………

…………………………………………

………………………………………………

…………………………………………

………………………………………………

No. Telefon

:

…………………………………………

No. Telefon

:

………………………………………………

No. Faks

:

…………………………………………

No. Faks

:

………………………………………………

E-mail

:

…………………………………………

E-mail

:

………………………………………………

Cap jari/

Tandatangan

:

…………………………………...........

Cap jari/

Tandatangan

:

…………………………………..................

Tarikh

:

…………………………………………

Tarikh

:

………………………………………………

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 34

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

P.U. (A) 179 35

BORANG A10

[Subkaedah 2(1)]

PENUKARAN KEGUNAAN TANAH DAN BANGUNAN UNTUK TEMPOH TERHAD

Kepada:

Datuk Bandar Kuala Lumpur

PENUKARAN KEGUNAAN TANAH DAN BANGUNAN UNTUK TEMPOH TERHAD

1.

*Saya/Kami ……………………………………………........................ No. K/P ………………………………. beralamat di ……………………………………………………….......................................... ingin mengemukakan permohonan berkenaan dengan cadangan pembangunan ………………………....................................................................................................................

di atas No. Lot ……….....…, Jalan ................................., Seksyen/Taman ……........……………., Mukim ………..…..…………,

Wilayah Persekutuan Kuala Lumpur.

2.

Butir-Butir Mengenai Hakmilik Tanah a.

No. Hakmilik Tanah b.

No. Lot c.

No. Seksyen/Mukim d.

Luas Tapak

- Ekar

- Kaki persegi

- Meter persegi

3.

Butir-Butir Cadangan Pembangunan i.

Nisbah plot ii.

Jenis pembangunan iii. Pecahan kegunaan dan luas lantai bangunan mengikut tingkat

Tingkat

Kegunaan Sedia Ada

Kegunaan Cadangan

Luas Lantai (kp)

Jumlah iv.

Ukuran anjakan bangunan

Struktur

Hadapan

Sisi Kanan

Sisi Kiri

Belakang

Bangunan utama

Bumbung

Lain-lain (sila nyatakan)

P.U. (A) 179 36

v.

Kawasan plint

Komponen

Luas Lantai (kp)

Peratus

Bangunan

Kawasan lapang berpusat

Jalan dalaman

Lain-lain (sila nyatakan)

Jumlah vi.

Ketinggian bangunan

Kriteria Ketinggian

Ukuran (meter)

Ketinggian mengikut jumlah tingkat

Ketinggian fizikal bangunan

Ketinggian tipikal lantai

Tingkat aras tanah

Ruang ketinggian berganda

Ketinggian podium (jika berkenaan)

vii.

Kemudahan yang disediakan

Bil.

Jenis Kemudahan

Lokasi (tingkat)

Luas Lantai (kp)

a.

b.

c.

d.

viii.

Tempat letak kenderaan yang disediakan a.

Jumlah tempat letak kereta b.

Jumlah tempat letak kereta orang kurang upaya c.

Jumlah tempat letak kereta pelawat d.

Jumlah tempat letak motosikal e.

Lain-lain (sila nyatakan)

4.

Senarai nama dan alamat *pemunya tanah berdaftar yang bersempadan:

i.

No. Lot

:

…………………………………..

ii.

No. Lot

:

………………………………

Nama

:

…………………………………..

Nama

:

………………………………

Alamat :

…………………………………..

Alamat

:

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

iii.

No. Lot

:

…………………………………..

iv.

No. Lot

:

………………………………

Nama

:

…………………………………..

Nama

:

………………………………

Alamat :

…………………………………..

Alamat

:

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

……………………………….

v.

No. Lot

:

…………………………………..

vi.

No. Lot

:

………………………………

Nama

:

…………………………………..

Nama

:

………………………………

Alamat :

…………………………………..

Alamat

:

……………………………....

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

P.U. (A) 179 37

vii.

No. Lot

:

…………………………………..

viii.

No. Lot

:

………………………………

Nama

:

…………………………………..

Nama

:

………………………………

Alamat :

…………………………………..

Alamat

:

……………………………...

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

*Nota:

i.

Sediakan lampiran sekiranya ruang ini tidak mencukupi.

ii.

Sila sertakan salinan carian rasmi yang dikeluarkan sama ada oleh Pengarah Tanah Dan Galian,

Wilayah Persekutuan Kuala Lumpur atau Pengarah Jabatan Penilaian Dan Pengurusan Harta, DBKL.

5.

Bersama-sama ini *saya/kami sertakan dokumen dan pelan sebagaimana dalam Senarai Semak

Dokumen dan Pelan untuk Permohonan Kebenaran Perancangan.

Dengan ini *saya/kami memperakui bahawa semua pelan dan maklumat yang dikemukakan adalah lengkap dan benar.

Pemohon/Ejen

*Pemunya tanah yang berdaftar

[Persetujuan pemunya di bawah subseksyen 21(2) Akta 267]

Nama

:

……………………………………………..

Nama

:

……………………………………………

:

……………………………………………..

:

……………………………………………

Alamat

:

……………………………………………..

Alamat

:

……………………………………………

……………………………………………..

……………………………………………

……………………………………………..

……………………………………………

No. Telefon

:

……………………………………………..

No. Telefon

:

……………………………………………

No. Faks

:

……………………………………………..

No. Faks

:

……………………………………………

E-mel

:

……………………………………………..

E-mel

:

……………………………………………

Cap jari/

Tandatangan

:

…………………………………..................

Cap jari/

Tandatangan

:

………………………………….................

Tarikh

:

……………………………………………..

Tarikh

:

……………………………………………..

Peringatan i.

Borang permohonan yang tidak diisi dengan lengkap dan betul tidak akan didaftarkan.

ii.

Bagi tanah yang dimiliki oleh syarikat/pertubuhan/perbadanan, pemunya hendaklah mengemukakan persetujuan bertulis mengesahkan bahawa mereka mempunyai kuasa untuk menandatangani pelan dan borang bagi pihak syarikat/pertubuhan/perbadanan berkenaan.

iii.

Sekiranya pemunya tanah melebihi daripada satu orang, sila sertakan persetujuan bertulis itu menggunakan format yang sama.

P.U. (A) 179 38

Untuk Kegunaan Pejabat Sahaja

No. Permohonan Kebenaran Perancangan

Tarikh Terima Permohonan

No. Fail

Kepadatan Kediaman dan Zon Guna Tanah dalam

Pelan Pembangunan Lengkap No. 1039/1040/1041

Pelan Susun Atur yang diwartakan Bil. ......./

Zon dan kepadatan yang dinyatakan dalam Kaedah-Kaedah (Perancangan)

(Zon dan Kepadatan) Wilayah Persekutuan 1985 [P.U. (A) 501/1985]/

Perintah Pembangunan Penukaran Zon Guna Tanah

Zon Guna Tanah dan Intensiti (Nisbah Plot atau Kepadatan Penduduk) dalam

Pelan Tempatan Kuala Lumpur yang diwartakan

P.U. (A) 179 39

BORANG B

[Perenggan 4(a)]

PERINTAH PEMBANGUNAN

Kepada:

…………………………………................

………………………………................…

…………………………………................

ADALAH DIBERITAHU bahawa permohonan pembangunan .............................................................

……………………………………………………………………………….....................… atas No. Lot .......................................

Jalan …………………......................... Seksyen/Taman …………....................………. Mukim …………............………..

Wilayah Persekutuan Kuala Lumpur telah:

*1.

diberi kebenaran perancangan tanpa syarat:

*2.

diberi kebenaran perancangan tertakluk syarat-syarat yang berikut:

…………………………………………………………………………………………………………………………...…...…...…………

…………………………………………………………………………………………………………………………………..……………

……………………………………………………………………………………………………………………………………..…………

………………………………………………………………………………………………………….....................................................

......................………………………………………....................................………………………………………................................

………………………………………………………..

Datuk Bandar Kuala Lumpur

Nota: Seseorang yang terkilan dengan apa-apa syarat yang dikenakan oleh Datuk Bandar dalam memberikan kebenaran perancangan berkenaan dengan permohonannya, boleh membuat rayuan kepada Lembaga Rayuan dalam tempoh satu bulan dari tarikh keputusan itu disampaikan kepadanya mengikut subseksyen 23(1) Akta (Perancangan)

(Wilayah Persekutuan) 1982 [Akta 267] dan hendaklah mengikut tatacara yang ditetapkan dalam Kaedah-Kaedah (Perancangan) (Lembaga Rayuan) Wilayah Persekutuan 1997

[P.U. (A) 376/1997].

Datuk Bandar Kuala Lumpur

No. Rujukan ………………….......

Tarikh: ...........................................

P.U. (A) 179 40

BORANG C

[Perenggan 4(b)]

NOTIS PENOLAKAN PERMOHONAN KEBENARAN PERANCANGAN

Kepada:

…………………………………

…………………………………

…………………………………

ADALAH DIBERITAHU bahawa permohonan pembangunan .............................................................

……………………………………………………………………………….....................… atas No. Lot .......................................

Jalan …………………......................... Seksyen/Taman …………....................………. Mukim …………............………..

Wilayah Persekutuan Kuala Lumpur tidak diberi kebenaran perancangan atas sebab-sebab yang berikut:

(a)

……………………………………………………………………........................................................................................

(b)

……………………………………………………………………........................................................................................

………………………………………………………..

Datuk Bandar Kuala Lumpur

Nota: Seseorang yang terkilan dengan keputusan Datuk Bandar yang menolak permohonannya untuk kebenaran perancangan, boleh membuat rayuan kepada

Lembaga

Rayuan dalam tempoh satu bulan dari tarikh keputusan itu disampaikan kepadanya mengikut subseksyen 23(1) Akta (Perancangan) (Wilayah Persekutuan) 1982 [Akta 267] dan hendaklah mengikut tatacara yang ditetapkan dalam Kaedah-Kaedah (Perancangan)

(Lembaga Rayuan) Wilayah Persekutuan 1997 [P.U. (A) 376/1997].

Datuk Bandar Kuala Lumpur

No. Rujukan ………….………......

Tarikh: ...........................................

P.U. (A) 179 41

BORANG D

[Subkaedah 5(1)]

PERMOHONAN BAGI PELANJUTAN TEMPOH SAH PERINTAH PEMBANGUNAN

Kepada:

Datuk Bandar Kuala Lumpur

*Saya/Kami …………………………….............…..………. No. K/P …….................………………………. beralamat di

………………………………………..................……….……… memohon pelanjutan bagi perintah pembangunan

No. Rujukan ………………….... bertarikh …….....………. berkenaan dengan pemajuan yang dicadangkan

…………………...........................…………….............. di atas No. Lot …………………… Jalan ...........................................

Seksyen/Taman …………....……...……. Mukim ….....………………… Wilayah Persekutuan Kuala Lumpur.

2.

*Saya/Kami adalah pemunya tanah tersebut.

3.

*Saya/Kami memohon pelanjutan tempoh sah perintah pembangunan atas sebab-sebab yang berikut:

……………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………

4.

Tempoh pelanjutan yang dimohon ialah:

……………………………………………………………………………………………………………………………………

5.

*Saya/Kami lampirkan resit No. ………………………………………………………. bagi jumlah wang

RM (…………………………….. ringgit) yang dikeluaran kepada saya pada ……………………………..

berkenaan dengan fi untuk mengisi permohonan asal *saya/kami untuk perintah pembangunan.

6.

*Saya/kami dengan ini bersetuju dengan semua syarat yang dikenakan oleh

Datuk Bandar.

Tarikh: …………………………

………….………………………………..

Tandatangan Pemohon

*Potong mana yang tidak berkenaan

P.U. (A) 179 42

BORANG E1

[Subkaedah 5(2)]

PELANJUTAN TEMPOH SAH PERINTAH PEMBANGUNAN

Kepada:

…………………………………

…………………………………

…………………………………

ADALAH DIBERITAHU bahawa permohonan pelanjutan tempoh sah perintah pembangunan No. Rujukan .......................................................................... atas No. Lot ............................................

Jalan ……………..........…….............. Seksyen/Taman ................................................ Mukim .......................................

Wilayah Persekutuan Kuala Lumpur telah *diberikan *tanpa syarat/*tertakluk syarat-syarat berikut ........................................................................................ sehingga ....................................... /*tidak diberikan kerana alasan yang berikut ...............................................................................................................................................

…………………………………………………..

Datuk Bandar Kuala Lumpur

*Potong mana yang tidak berkenaan

Datuk Bandar Kuala Lumpur

No. Rujukan ……………...……...

Tarikh: ..........................................

Datuk Bandar Kuala Lumpur

No. Rujukan ………….………......

Tarikh: ...........................................

P.U. (A) 179 43

BORANG E2

[Subkaedah 5(2)]

PELANJUTAN TEMPOH SAH PERINTAH PEMBANGUNAN

BAGI PENUKARAN SEMENTARA GUNA BANGUNAN/TANAH

Kepada:

…………………………………

…………………………………

…………………………………

ADALAH DIBERITAHU bahawa permohonan pelanjutan tempoh sah perintah pembangunan No. Rujukan ...................................................... atas No. Lot ...........................................................

Jalan …………………....................... Seksyen/Taman ............................................ Mukim ............................................

Wilayah Persekutuan Kuala Lumpur telah *diberikan *tanpa syarat/tertakluk syarat-syarat berikut .......................................................................................................................................................................................

sehingga ...................................................................................... /*tidak diberikan kerana alasan yang berikut:

........................................................................................................................................................................................................

………………………………………………………..

Datuk Bandar Kuala Lumpur

*Potong mana yang tidak berkenaan

Datuk Bandar Kuala Lumpur

No. Rujukan …………...………....

Tarikh: ...........................................

P.U. (A) 179 44

BORANG F

[Subkaedah 6(1)]

PERINTAH PEMBATALAN/PENGUBAHSUAIAN PERINTAH PEMBANGUNAN

Kepada:

……………………………………

……………………………………

……………………………………

BAHAWASANYA Datuk Bandar dengan ini memerintahkan adalah perlu perintah pembangunan No. Rujukan ............................... berkaitan dengan cadangan pembangunan bagi No. Lot ............................. Jalan ........................................................ Seksyen/Taman …………....…….......…….

Mukim …..........………………… Wilayah Persekutuan Kuala Lumpur *dibatalkan/diubah suai berkuat kuasa dari tarikh notis ini. Mengikut *pembatalan/pengubahsuaian tersebut, pihak tuan adalah dikehendaki untuk melaksanakan tindakan yang berikut:

…………………………………………………………………………………………………………………..……………………………

……………………………………………………………………………………………………………………..…………………………

………………………………………………………………………………………………………………………..………………………

…………………………………………………………………………………………………………………………..……………………

dalam tempoh tiga puluh hari dari tarikh notis.

2.

Tuan boleh membuat tuntutan pampasan terhadap *pembatalan/pengubahsuaian perintah pembangunan dengan mengemukakan tuntutan tuan dalam Borang G yang dilampirkan bersama-sama ini dalam tempoh tiga puluh hari dari tarikh notis ini.

3.

Tuntutan untuk pampasan hendaklah merujuk kepada kos sebenar dan munasabah yang ditanggung oleh pihak tuan untuk menjalankan kerja-kerja perobohan semula dari

*pembatalan/pengubahsuaian perintah pembangunan yang diluluskan.

………………………………………………………..

Datuk Bandar Kuala Lumpur

*Potong mana yang tidak berkenaan

Datuk Bandar Kuala Lumpur

No. Rujukan ………….………......

Tarikh: ...........................................

P.U. (A) 179 45

BORANG G

[Subkaedah 6(2)]

PERMOHONAN PAMPASAN PEMBATALAN/PENGUBAHSUAIAN

PERINTAH PEMBANGUNAN

Kepada :

Datuk Bandar Kuala Lumpur

*Saya/Kami ……………………………………………………………. No. K/P.......................................... beralamat di

.....................................………………………………………......................................... dengan ini memohon pampasan terhadap *pembatalan/pengubahsuaian perintah pembangunan No. Rujukan ……………………………

bertarikh …………..........………. untuk cadangan pembangunan ………………………………………………………

di atas No. Lot …………………… Jalan .................................................. Seksyen/Taman ………………......……..

Mukim …………....….……… Wilayah Persekutuan Kuala Lumpur.

2.

*Saya/Kami adalah *pemohon/pemunya tanah tersebut.

3.

*Saya/Kami kemukakan bersama-sama ini 2 salinan yang diakui sah untuk setiap dokumen yang berikut:

(a)

Perintah Pembangunan;

(b)

Perintah Pembatalan/Pengubahsuaian Perintah Pembangunan;

(c)

peta dan pelan yang berkaitan yang dikemukakan kepada Datuk Bandar;

(d)

tarikh mula kerja mengenai cadangan pembangunan itu;

(salinan Borang B iaitu Notis Memulakan/Menyambung Semula Kerja Bangunan di bawah

Undang-Undang

Kecil

Bangunan

(Wilayah

Persekutuan

Kuala Lumpur) 1985 [P.U. (A) 537/1985] dan salinan Borang B iaitu

Notis Memulakan Kerja Tanah di bawah Undang-Undang Kecil Kerjatanah

(Wilayah Persekutuan Kuala Lumpur) 1988 [P.U. (A) 396/1988] hendaklah dikemukakan sebagai bukti)

P.U. (A) 179 46

(e)

kerja-kerja perobohan telah dijalankan susulan daripada Notis Borang F bertarikh ............................ No. Rujukan .................................;

(f)

jumlah yang dituntut sebagai pampasan hendaklah merujuk kepada kos sebenar dan munasabah yang ditanggung oleh *saya/kami dalam menjalankan perobohan itu.

4.

Butir-butir mengenai tuntutan (gunakan kertas berasingan jika perlu)

.…………………………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………

5.

*Saya/kami dengan ini bersetuju dengan semua syarat yang dikenakan oleh

Datuk Bandar.

Tarikh: ………………………… …………………………………….

Tandatangan Pemohon

*Potong mana yang tidak berkenaan

P.U. (A) 179 47

BORANG H

[Subkaedah 6(3)]

TAWARAN PAMPASAN UNTUK PEMBATALAN/

PENGUBAHSUAIAN PERINTAH PEMBANGUNAN

Kepada:

…………………………………............…

…………………………………............…

……………………………….............……

Datuk Bandar setelah menimbangkan permohonan tuan untuk tuntutan pampasan berkenaan dengan *pembatalan/pengubahsuaian perintah pembangunan yang dibuat dalam

Borang G dan dalam pendengaran tuntutan pihak tuan berikutnya yang telah diadakan pada …………………........……, keputusan telah dibuat bahawa amaun pampasan yang ditawarkan adalah sebanyak RM ………………………….......................................................……

2.

Tuan adalah dengan ini dikehendaki memaklumkan Datuk Bandar dalam tempoh empat belas (14) hari dari tarikh Borang ini mengenai penerimaan pihak tuan akan amaun pampasan yang telah ditawarkan, atau sama ada tuan menerimanya dengan bantahan, atau sama ada tuan tidak menerima amaun pampasan yang ditawarkan. Sekiranya pihak tuan tidak mengemukakan apa-apa maklum balas dalam tempoh yang ditetapkan, amaun pampasan yang ditawarkan oleh Datuk Bandar akan dibayar kepada pihak tuan sebagai bayaran muktamad.

Walau bagaimanapun, sekiranya tuan tidak menerima amaun pampasan yang ditawarkan itu, tuan adalah dikehendaki memaklumkan Datuk Bandar mengenai penolakan tuan itu dalam tempoh empat belas (14) hari selepas menerima Borang ini dan pihak tuan diminta mengemukakan rayuan kepada Lembaga Rayuan dalam tempoh dua (2) bulan dari tarikh

Notis ini bagi mentaksir amaun pampasan yang hendak dibayar.

……………...……………………………..

Datuk Bandar Kuala Lumpur

*Potong mana yang tidak berkenaan

Datuk Bandar Kuala Lumpur

Rujukan No. ………….………......

Tarikh: ...........................................

P.U. (A) 179 48

Jadual

Suggest a correction

JADUAL KEDUA

[Subkaedah 2(1) dan 5(1)]

FI

(1)

Jenis Permohonan

(2)

Fi 1.

(a)

Kediaman

(i)

RM50.00 bagi satu unit

(ii)

(iii)

RM25.00 bagi satu unit sebagaimana yang ditentukan oleh kerajaan dari semasa ke semasa sebagai rumah kos rendah

Kemudahan penduduk dalam pembangunan rumah pangsa/

kondominium, mengikut kadar yang dikenakan bagi pembangunan 1(b)

(b)

Perdagangan, perusahaan, pelajaran, hotel, bengkel, kemudahan masyarakat atau apa-apa pembangunan lain

RM40.00 bagi setiap 1,000 kaki persegi

(c)

Stesen minyak dan servis

RM5,000.00 bagi satu stesen

(d)

Pembangunan bercampur

RM40.00 bagi setiap 1,000 kaki persegi

(e)

Tambahan dan perubahan kepada pembangunan (b) di atas

RM40.00 bagi setiap 1,000 kaki persegi

(f)

Ubahsuai/perubahan fasad bangunan setiap tingkat

RM100.00 bagi setiap tingkat 2.

Tempat letak kereta terbuka

RM10.00 setiap ruang petak 3.

Menukar kegunaan tanah

RM5,000.00 setiap permohonan 4.

Menukar sementara kegunaan tanah/

bangunan

RM500.00 bagi setiap permohonan 5.

Pemecahan sempadan dan/atau penyatuan tanah (pelan susun atur)

RM500.00 bagi satu ekar atau sebahagian daripadanya

P.U. (A) 179 49

(1)

Jenis Permohonan

(2)

Fi 6.

Pindaan kepada pemecahan sempadan dan/atau penyatuan tanah (pelan susun atur)

RM500.00 bagi satu ekar atau sebahagian daripadanya

7.

Permohonan menara/struktur telekomunikasi

RM6,200.00 bagi satu struktur 8.

Pelanjutan perintah pembangunan

Mengikut kadar pemfailan asal 9.

Pelanjutan perintah pembangunan menukar sementara kegunaan tanah/bangunan

Mengikut kadar pemfailan asal

10.

Pindaan perintah pembangunan

Mengikut kadar yang dikenakan di bawah subbutiran 1(a) bagi kediaman

Mengikut kadar yang dikenakan di bawah subbutiran 1(b) bagi lain-lain pembangunan

(i)

di atas tanah

a)

saiz besar

(60 kaki x 40 kaki atau 40 kaki x 30 kaki)

RM500.00 bagi setiap struktur

b)

saiz sederhana

(10 kaki x 40 kaki atau 15 kaki x 20 kaki atau 30 kaki x 20 kaki)

RM300.00 bagi setiap struktur

c)

saiz kecil

(10 kaki x 5 kaki)

RM200.00 bagi setiap struktur

(ii)

pada parapet jejambat

RM300.00 bagi setiap struktur

(iii)

pada tetiang jejambat

RM300.00 bagi setiap struktur

(iv)

pada struktur jejantas

RM300.00 bagi setiap struktur

(v)

pada tetiang jejantas

RM300.00 bagi setiap struktur

(vi)

pilon

RM300.00 bagi setiap struktur

P.U. (A) 179 50

(1)

Jenis Permohonan

(2)

Fi

(vii)

pada dinding terowong

RM300.00 bagi setiap struktur

(viii)

pada tembok

RM300.00 bagi setiap struktur

(ix)

gantri (hanya dibenarkan di laluan lebuhraya dan di luar kawasan pusat bandar raya)

RM500.00 bagi setiap struktur

Dibuat 19 Mei 2025

[DBKL/JUP/BPPP/GN/1486(JLD. 8); PN(PU2)396/JLD.9]

DATO' SERI TPr (DR.) MAIMUNAH BINTI MOHD SHARIF

Datuk Bandar Kuala Lumpur

Diluluskan 10 Jun 2025

[KWP(S): 24/PUU/698/1/1/78 JLD 4; PN(PU2)396/JLD.9]

DATUK SERI DR. ZALIHA BINTI MUSTAFA

Menteri di Jabatan Perdana Menteri

(Wilayah Persekutuan)

P.U. (A) 179 51

FEDERAL TERRITORY (PLANNING) ACT 1982

FEDERAL TERRITORY (PLANNING) (APPLICATION FOR PLANNING PERMISSION)

(FEDERAL TERRITORY OF KUALA LUMPUR) RULES 2025

IN exercise of the powers conferred by paragraphs 64(2)(j) and (l) of the

Federal

Territory

(Planning)

Act 1982

[Act 267], the

Commissioner, with the approval of the Minister, makes the following rules:

Citation and commencement 1.

(1)

These rules may be cited as the Federal Territory (Planning)

(Application for Planning Permission) (Federal Territory Of Kuala Lumpur)

Rules 2025.

(2)

These Rules come into operation on 16 June 2025.

Application for planning permission 2.

(1)

An application for a planning permission under section 21 of the Act shall be made by an applicant to the Commissioner in Form A1, A2, A3, A4, A5,

A6, A7, A8, A9 and A10 of the First Schedule together with the fee as prescribed in the Second Schedule.

(2)

At any time after receiving an application under subrule (1) and before the application is determined, the Commissioner may, in writing, require the applicant to give any further information as may be necessary to enable the Commissioner to decide on the application.

Consultation 3.

Before considering an application for a planning permission made under rule 2, the Commissioner may, if he thinks necessary, consult any relevant authority, department, society or any interested person upon the application.

P.U. (A) 179 52

Development order 4.

After considering the application made under rule 2, the Commissioner may—

(a)

grant planning permission and issue a development order in Form B of the First Schedule to the applicant; or

(b)

refuse to grant planning permission and issue a notice of refusal of the planning permission in Form C of the First Schedule to the applicant.

Application to extend development order 5.

(1)

An application to extend a development order under subsection 24(2) of the Act shall be made by the applicant to the Commissioner in Form D of the

First Schedule before the expiry of the period of development order together with the payment of fee as prescribed in the Second Schedule.

(2)

The Commissioner may grant or refuse to grant the application to extend a development order by issuing Form E1 or Form E2 respectively of the First Schedule to the applicant.

Revocation and modification of development order 6.

(1)

If it appears to the Commissioner that any development order issued in relation to such development should be revoked or modified in pursuant to subsection 25(1) of the Act, the Commissioner shall issue Form F of the First Schedule to the person to whom the development order is granted.

(2)

The person to whom the development order in relation to such development is issued who is aggrieved by the revocation or modification of the development order may claim compensation from the Commissioner in Form G of the First Schedule within the time specified in Form F of the First Schedule.

P.U. (A) 179 53

(3)

Upon receipt of Form G under subrule (2) and after the Commissioner give the aggrieved person a reasonable opportunity to be heard, the Commissioner shall offer a compensation to the aggrieved person in Form H of the First Schedule as the Commissioner thinks adequate.

Fees paid shall not be refunded 7.

All fees paid under these Rules shall not be refunded.

Revocation 8.

The Planning (Development) Rules, 1970 [P.U. (A) 7/1971] is revoked.

Saving and transitional provision 9.

(1)

Any application made under the Planning (Development) Rules, 1970

[P.U. (A) 7/1971], which are referred to as “the revoked Rules”, for a planning permission, development order or extension of development order or modification of development order which are pending before the date of the coming into operation of these Rules shall, after the date of the coming into operation of these Rules, be dealt with under the revoked Rules as if these Rules have not been made.

(2)

Any development order or extension of development order or modification of development order issued under the revoked Rules shall, after the date of the coming into operation of these Rules, continue to be in force and have effect until the development order or extension of development order or modification of development order expires or revoked.

(3)

Any proceedings, whether civil or criminal, or any enforcement action commenced under the revoked Rules which are pending on the date of the coming into operation of these Rules shall, on the date of the coming into operation of these Rules, be continued and concluded under the revoked Rules as if these Rules have not been made.

P.U. (A) 179 54

FIRST SCHEDULE

FORM A1

[Subrule 2(1)]

SUBDIVISION AND AMALGAMATION OF LAND (LAYOUT PLAN)

The Commissioner of the City of Kuala Lumpur

SUBDIVISION AND AMALGAMATION OF LAND (LAYOUT PLAN)

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square feet

- Square metre

3.

Details of Proposed Development

Use of Land

No./Unit

Floor Area

Percentage

Residential

▪ Detached

▪ Semi-detached

▪ Terrace

▪ Flat/Condominium/Apartment

▪ Low cost house

▪ Affordable house

Commercial

▪ Shop house

▪ Office

▪ Petrol station

Industrial

▪ Terrace

▪ Detached

▪ Semi-detached

▪ Multi-storey

Educational

▪ Higher education center

P.U. (A) 179 55

Use of Land

No./Unit

Floor Area

Percentage

▪ Secondary school

▪ Primary school

▪ Kindergarten

Public facilities

▪ House of worship

▪ Police station

▪ Fire station

Infrastructure

▪ Water tank

▪ Electrical substation

▪ Oxidation pool

▪ River/Drainage reserve

▪ Others

Green area/Separating zone

Open space/Recreation

Cemetery

Road reserve

Others (please specify)

TOTAL

4.

List of name and address of *registered proprietor/s of adjoining *property/properties:

i.

Lot No.

:

…………………………………..

ii.

Lot No.

:

………………………………

Name

:

…………………………………..

Name

:

………………………………

Address :

…………………………………..

Address

:

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

iii.

Lot No.

:

…………………………………..

iv.

Lot No.

:

………………………………

Name

:

…………………………………..

Name

:

………………………………

Address :

…………………………………..

Address

:

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

v.

Lot No.

:

…………………………………..

vi.

Lot No.

:

………………………………

Name

:

…………………………………..

Name

:

………………………………

Address :

…………………………………..

Address

:

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

vii.

Lot No.

:

…………………………………..

viii.

Lot No.

:

………………………………

Name

:

…………………………………..

Name

:

………………………………

Address :

…………………………………..

Address

:

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

…………………………………..

………………………………

*Note:

i.

Please enclose attachment if this space is insufficient.

ii.

Please enclose a copy of official search issued by Federal Territories Director of Lands and Mines or

Director of Property Management and Valuation Department, DBKL.

P.U. (A) 179 56 5.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

………………………………………….

:

……………………………………………..

:

………………………………………….

Address

:

……………………………………………..

Address

:

………………………………………….

……………………………………………..

………………………………………….

……………………………………………..

………………………………………….

Tel No.

:

……………………………………………..

Tel No.

:

………………………………………….

Fax No.

:

……………………………………………..

Fax No.

:

………………………………………….

E-mail

:

……………………………………………..

E-mail

:

………………………………………….

Thumbprint/

Signature

:

………………………………….................

Thumbprint/

Signature

:

…………………………………............

Date

:

……………………………………………..

Date

:

………………………………………….

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 57

FORM A2

[Subrule 2(1)]

COMMERCIAL DEVELOPMENT/MIX DEVELOPMENT

The Commissioner of the City of Kuala Lumpur

COMMERCIAL DEVELOPMENT/MIX DEVELOPMENT

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Breakdown of floor area according to development components

Type of Use

Floor Area (sq. ft.)

Office

Shop space (retail)

Hotel

Residential

Serviced apartment

Hawker space (according to DBKL specifications)

Car park

Others (please specify)

Total

P.U. (A) 179 58

iii.

Breakdown of floor use and area by floor iv.

Building setback dimensions

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height vii.

Details of components of residential/serviced apartment/SoHo (if relevant)

Type

Floor Area/Unit

No. of Unit

Percentage

Selling price/Unit

Total viii.

Details of components of hotel (if relevant)

i.

Number of rooms ii.

Size of rooms iii.

Rating (star)

Level

Uses

Floor Area (sq. ft.)

Total

(sq. ft.)

Office

Hotel

Residential

Serviced apartment

Others

(please specify)

Car Park

Hawker Space

(according to DBKL specification)

P.U. (A) 179 59

ix.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

Total x.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for single women drivers d.

Total number of parking space for motorcyles

4.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

*I/ We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

………………………………..…………

:

……………………………………………..

:

…………………………..………………

Address

:

……………………………………………..

Address

:

………………………………..…………

……………………………………………..

………………………………..…………

……………………………………………..

……………………………………..……

Tel No.

:

……………………………………………..

Tel No.

:

…………………………………..………

Fax No.

:

……………………………………………..

Fax No.

:

………………………………….……….

E-mail

:

……………………………………………..

E-mail

:

…………………………………….….…

Thumbprint/

Signature

:

…………………………………................

Thumbprint/

Signature

:

…………………………………….........

Date

:

……………………………………………..

Date

:

…………………………………………..

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 60

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

P.U. (A) 179 61

FORM A3

[Subrule 2(1)]

APPLICATION FOR PLANNING PERMISSION RESIDENTIAL DEVELOPMENT

The Commissioner of the City of Kuala Lumpur

APPLICATION FOR PLANNING PERMISSION RESIDENTIAL DEVELOPMENT

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Density of population ii.

Type of residential

Type of Residential

Number of Units

Bungalow

Semi-detached

Terrace

Flats/Condominiums/Apartments

Low cost house/Affordable house

Total iii.

Breakdown of floor use and area by floor

Level

Uses

Floor Area (sq. ft.)

Total

P.U. (A) 179 62

iv.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height vii.

Details of components of residential

Type

Floor Area/Unit

No. of Unit

Percentage

Selling Price/Unit

Total viii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

d.

e.

Total ix.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcyle e.

Others (please specify)

4.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

P.U. (A) 179 63

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

…………………………………………..

:

……………………………………………..

:

…………………………………………..

Address

:

……………………………………………..

Address

:

…………………………………………..

……………………………………………..

…………………………………………..

……………………………………………..

…………………………………………..

Tel No.

:

……………………………………………..

Tel No.

:

…………………………………………..

Fax No.

:

……………………………………………..

Fax No.

:

…………………………………………..

E-mail

:

……………………………………………..

E-mail

:

…………………………………………..

Thumbprint/

Signature

:

………………………………….................

Thumbprint/

Signature

:

………………………………….............

Date

:

……………………………………………..

Date

:

…………………………………………

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 64

FORM A4

[Subrule 2(1)]

APPLICATION FOR PLANNING PERMISSION INDUSTRIAL DEVELOPMENT

The Commissioner of the City of Kuala Lumpur

APPLICATION FOR PLANNING PERMISSION INDUSTRIAL DEVELOPMENT

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Type of industry

Type of Industry

Number of Units

Detached

Semi-detached

Terrace

Multi-storey

Total iii.

Breakdown of floor use and area by floor

Level

Uses

Floor Area (sq. ft.)

Total

P.U. (A) 179 65

iv.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height (if relevant)

vii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

d.

e.

Total viii.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcyles e.

Total number of parking space for lorries f.

Others (please specify)

5.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

P.U. (A) 179 66

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under section 21(2) Act 267]

Name

:

……………………………………………..

Name

:

……………………………………………

:

……………………………………………..

:

……………………………………….…...

Address

:

……………………………………………..

Address

:

……………………………………………

……………………………………………..

……………………………………………

……………………………………………..

……………………………………………

Tel No.

:

……………………………………………..

Tel No.

:

……………………………………………

Fax No.

:

……………………………………………..

Fax No.

:

……………………………………………

E-mail

:

……………………………………………..

E-mail

:

……………………………………………

Thumbprint/

Signature

:

…………………………………..................

Thumbprint/

Signature

:

………………………………................

Date

:

……………………………………………..

Date

:

…………………………………………

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 67

FORM A5

[Subrule 2(1)]

EDUCATIONAL FACILITIES DEVELOPMENT

The Commissioner of the City of Kuala Lumpur

EDUCATIONAL FACILITIES DEVELOPMENT

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Type of educational facilites (/)

iii.

Breakdown of floor use and area by floor

Level

Uses

Floor Area (sq. ft.)

Total a.

Creche b.

Kindergarten c.

Nursery d.

Primary School e.

Secondary School f.

College g.

Vocational School h.

Commercial School i.

Institusi of Higher Education j.

Others

P.U. (A) 179 68

iv.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height vii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

d.

e.

Total viii.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcyles e.

Others (please specify)

ix.

Number of instructors/staff x.

Number of pupils/students xi.

Time of operation

Opening time

Closing time

4.

Herewith *I/We enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

P.U. (A) 179 69

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

…………………….……………………

:

……………………………………………..

:

…………………………….……………

Address

:

……………………………………………..

Address

:

………………………………………….

……………………………………………..

………………….………………………

……………………………………………..

………………………….………………

Tel No.

:

……………………………………………..

Tel No.

:

………………………….………………

Fax No.

:

……………………………………………..

Fax No.

:

…………………………………………

E-mail

:

……………………………………………..

E-mail

:

…………………………………………

Thumbprint/

Signature

:

…………………………………..................

Thumbprint/

Signature

:

…………………….…………...............

Date

:

……………………………………………..

Date

:

…………………….……………………

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 70

FORM A6

[Subrule 2(1)]

INSTITUTIONAL AND PUBLIC FACILITIES DEVELOPMENT

The Commissioner of the City of Kuala Lumpur

INSTITUTIONAL AND PUBLIC FACILITIES DEVELOPMENT

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Type of facility/institutional iii.

Breakdown of floor use and area by floor

Level

Uses

Floor Area (sq. ft.)

Total iv.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

P.U. (A) 179 71

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height (if relevant)

vii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

d.

e.

viii.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcycles e.

Others (please specify)

5.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

………………………………………….…

:

……………………………………………..

:

…………………………………………….

Address

:

……………………………………………..

Address

:

…………………………………………….

……………………………………………..

……………………………………….……

……………………………………………..

……………………………………….……

Tel No.

:

……………………………………………..

Tel No.

:

…………………………………….………

Fax No.

:

……………………………………………..

Fax No.

:

…………………………………….………

E-mail

:

……………………………………………..

E-mail

:

…………………………………….………

P.U. (A) 179 72

Thumbprint/

Signature

:

…………………………………..................

Thumbprint/

Signature

:

…………………………………................

Date

:

……………………………………………..

Date

:

………………………………….…………

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan no. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 73

FORM A7

[Subrule 2(1)]

PETROL STATION/VEHICLE SERVICE CENTER/WORKSHOP DEVELOPMENT

The Commissioner of the City of Kuala Lumpur

PETROL STATIONS/VEHICLE SERVICE CENTER/WORKSHOP DEVELOPMENT

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Type of petrol stations/vehicle service center/workshop iii.

Proposed services (other than selling of fuel) (if relevant):

a.

………………………………………………………………………………………………………………

b.

……………………………………………………………………………………………………………....

c.

……………………………………………………………………………………………………………….

iv.

Breakdown of floor use and area by floor

Level

Uses

Floor Area (sq. ft.)

Total

P.U. (A) 179 74

v.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Pump island

Canopy station

Others (please specify)

vi.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vii.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height (if relevant)

viii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft)

a.

b.

c.

d.

e.

ix.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcycles e.

Total number of parking space for lorries f.

Others (please specify)

5.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

P.U. (A) 179 75

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

……………………………………...….

:

……………………………………………..

:

…………………………………………

Address

:

……………………………………………..

Address

:

…………………………………………

……………………………………………..

…………………………………………

……………………………………………..

…………………………………………

Tel No.

:

……………………………………………..

Tel No.

:

…………………………………………

Fax No.

:

……………………………………………..

Fax No.

:

…………………………………………

E-mail

:

……………………………………………..

E-mail

:

…………………………………………

Thumbprint/

Signature

:

…………………………………..................

Thumbprint/

Signature

:

…………………………………............

Date

:

……………………………………………..

Date

:

………………………………………….

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 76

FORM A8

[Subrule 2(1)]

The Commissioner of the City of Kuala Lumpur

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Type of development iii.

Breakdown of floor use and area by floor

Level

Uses

Floor Area (sq. ft.)

Total iv.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

P.U. (A) 179 77

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height (if relevant)

vii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

d.

e.

viii.

Provision of parking lot a.

Total number of parking space b.

Total numberof parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcycles e.

Total number of parking space for lorries f.

Others (please specify)

5.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

……………………………………………

:

……………………………………………..

:

……………………………………………

Address

:

……………………………………………..

Address

:

……………………………………………

……………………………………………..

……………………………………………

……………………………………………..

……………………………………………

Tel No.

:

……………………………………………..

Tel No.

:

……………………………………………

Fax No.

:

……………………………………………..

Fax No.

:

……………………………………………

E-mail

:

……………………………………………..

E-mail

:

……………………………………………

P.U. (A) 179 78

Thumbprint/

Signature

:

…………………………………..................

Thumbprint/

Signature

:

………………………………….................

Date

:

……………………………………………..

Date

:

…………………………………………..…

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 79

FORM A9

[Subrule 2(1)]

CHANGE CLASSES OF USE OF LAND AND BUILDING

The Commissioner of the City of Kuala Lumpur

CHANGE CLASSES OF USE OF LAND AND BUILDING

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Type of development iii.

Breakdown of uses and building floor area by floor

Level

Existing Uses

Suggested Uses

Floor Area (sq. ft.)

Total iv.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

P.U. (A) 179 80

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height (if relevant)

vii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

d.

viii.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcycles e.

Others (please specify)

4.

List of name and address of *registered proprietor/s of adjoining property/properties:

i.

Lot No.

:

…………………………………..

ii.

Lot No.

:

……………………………...

Name

:

…………………………………..

Name

:

……………………………...

Address :

…………………………………..

Address

:

……………………………...

…………………………………..

…………………………...…

…………………………………..

………………………….…..

…………………………………..

……………………………...

iii.

Lot No.

:

…………………………………..

iv.

Lot No.

:

……………………………...

Name

:

…………………………………..

Name

:

……………………………...

Address :

…………………………………..

Address

:

……………………………...

…………………………………..

……………………………...

…………………………………..

……………………………...

…………………………………..

……………………………...

v.

Lot No.

:

…………………………………..

vi.

Lot No.

:

……………………………...

Name

:

…………………………………..

Name

:

……………………………...

Address :

…………………………………..

Address

:

……………………………...

…………………………………..

……………………………...

…………………………………..

……………………………...

…………………………………..

……………………………...

P.U. (A) 179 81

vii.

Lot No.

:

…………………………………..

viii.

Lot No.

:

………………………...……

Name

:

…………………………………..

Name

:

………………………...……

Address :

…………………………………..

Address

:

………………………….…..

…………………………………..

…………………………...…

…………………………………..

………………………...……

…………………………………..

………………………..…….

*Note :

i.

Please enclose attachment if this space is insufficient.

ii.

Please enclose a copy of official search issued by Federal Territories Director of Lands and Mines or

Director of Property Management and Valuation Department, DBKL.

5.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

*I/We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

…………………………………………

:

……………………………………………..

:

…………………………………………

Address

:

……………………………………………..

Address

:

…………………………………………

……………………………………………..

…………………………………………

……………………………………………..

…………………………………………

Tel No.

:

……………………………………………..

Tel No.

:

…………………………………………

Fax No.

:

……………………………………………..

Fax No.

:

…………………………………………

E-mail

:

……………………………………………..

E-mail

:

…………………………………………

Thumbprint/

Signature

:

…………………………………..................

Thumbprint/

Signature

:

……………………………..……….......

Date

:

……………………………………….……..

Date

:

………………………………..…………

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 82

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

P.U. (A) 179 83

FORM A10

[Subrule 2(1)]

CHANGE CLASSES OF USE OF LAND AND BUILDING FOR LIMITED PERIOD

To :

The Commissioner of the City of Kuala Lumpur

CHANGE CLASSES OF USE OF LAND AND BUILDING FOR LIMITED PERIOD

1.

*I/We ……………………………………………............................... I/C No. …………............……………………. of address

……………………………………………………….................................... do hereby apply for a proposal in respect of the development …………………….............………….................................................................................................................... on

Lot No. ….....………............., Jalan ........................................., Section/Taman …….....………………., Mukim ……………………,

Federal Territory of Kuala Lumpur.

2.

Particulars of Title i.

Title No.

ii.

Lot No.

iii.

Section/Mukim No.

iv.

Area of Land

- Acres

- Square foot

- Square metre

3.

Details of Proposed Development i.

Plot ratio ii.

Type of development iii.

Breakdown of use and floor area of the building by floor

Level

Existing Uses

Suggested Uses

Floor Area (sq. ft.)

Total iv.

Building setback measurement

Structure

Front

Right Side

Left Side

Rear

Main building

Roof

Others (please specify)

P.U. (A) 179 84

v.

Plinth area

Component

Floor Area (sq. ft.)

Percentage

Building

Centralized open space

Internal road

Others (please specify)

Total vi.

Height of the building

Height Criteria

Dimension (metre)

Height according to the number of floors

Physical height of the building

Typical floor height

Ground level

Double volume height

Podium height (if relevant)

vii.

Facilities provided

Type of Facility

Location (level)

Floor Area (sq. ft.)

a.

b.

c.

d.

viii.

Provision of parking lot a.

Total number of parking space b.

Total number of parking space for persons with disabilities c.

Total number of parking space for visitors d.

Total number of parking space for motorcycles e.

Others (please specify)

4.

List of name and address of *registered proprietor/s of adjoining property/properties:

i.

Lot No.

:

…………………………………..

ii.

Lot No.

:

………………………...……

Name

:

…………………………………..

Name

:

…………………………...…

Address :

…………………………………..

Address

:

…………………………...…

…………………………………..

………………………………

…………………………………..

…………………………..….

…………………………………..

………………………………

iii.

Lot No.

:

…………………………………..

iv.

Lot No.

:

………………………………

Name

:

…………………………………..

Name

:

………………………………

Address :

…………………………………..

Address

:

………………………………

…………………………………..

………………………………

…………………………………..

…………………………..….

…………………………………..

………………………………

v.

Lot No.

:

…………………………………..

vi.

Lot No.

:

……………………….….….

Name

:

…………………………………..

Name

:

…………………………..….

Address :

…………………………………..

Address

:

………………………………

…………………………………..

……………………….……..

…………………………………..

………………………….…..

…………………………………..

………………………….…..

P.U. (A) 179 85

vii.

Lot No.

:

…………………………………..

viii.

Lot No.

:

………………………….…..

Name

:

…………………………………..

Name

:

………………………….…..

Address :

…………………………………..

Address

:

……………………….……..

…………………………………..

………………………………

…………………………………..

………………………….…..

…………………………………..

……………………………...

*Note:

i.

Please enclose attachment if this space is insufficient.

ii.

Please enclose a copy of official search issued by Federal Territories Director of Lands and Mines or

Director of Property Management and Valuation Department, DBKL.

5.

Herewith *I/we enclose the documents and plans as per the Checklist of Documents and Plans for Application of Planning Permission.

*I/ We hereby certify that all plans and information given are complete and correct.

Applicant/Agent

*Registered proprietor of the land

[Consent of the owner under subsection 21(2) Act 267]

Name

:

……………………………………………..

Name

:

……………………………………….…

:

……………………………………………..

:

………………………………………….

Address

:

……………………………………………..

Address

:

…………………………………….……

……………………………………………..

…………………………………….……

……………………………………………..

…………………………………….……

Tel No.

:

……………………………………………..

Tel No.

:

………………………………….………

Fax No.

:

……………………………………………..

Fax No.

:

…………………………………….……

E-mail

:

……………………………………………..

E-mail

:

……………………………….…………

Thumbprint/

Signature

:

…………………………………..................

Thumbprint/

Signature

:

………………………………….….......

Date

:

……………………………………………..

Date

:

……………………………………….…

Reminder i.

Application form that is not fully and correctly filled in will not be registered.

ii.

For land owned by company/organization/corporation, the owner is required to submit written consent affirming that the land owner has the power to sign the plan and form on behalf of the company/organization/corporation.

iii.

If owner of the land is more than one person, please enclose the written consent using the same format.

P.U. (A) 179 86

For Office Use Only

Planning Permission Application No.

Date Application Received

File No.

Residential Density and Land Use Zoning in

Comprehensive Development Plan No. 1039/1040/1041

Gazetted Layout Plan No. ......./

Zoning and density as specified in the Federal Territory (Planning)

(Zoning and Density) Rules 1985 [P.U. (A) 501/1985]/

Development Order for Change of Use of Land

Land Use Zoning and Intensity (Plot Ratio or Population Density) in the gazetted Kuala Lumpur Local Plan

P.U. (A) 179 87

FORM B

[Paragraph 4(a)]

DEVELOPMENT ORDER

………………………………………….…

…………………………………..……...…

………………………………………....….

TAKE NOTE that the application for the development of .....................................................................

……………...............................................................................................................… on Lot No. …………....................……..

Jalan ................................................... Section/Taman ……………......................……… Mukim …….................……….

of the Federal Territory of Kuala Lumpur has been:

*1.

granted planning permission without any conditions:

*2.

granted planning permission subject to the following conditions:

……….……………………….………………………..................…………………………………………………………………………

…..………………………………………………………..................………………………………………………………………………

…………………..………………………………………………………………………………..............................................................

........................................................................................................................................................................................................

........................................................................................................................................................................................................

…………..………………............………..................................

Commissioner of the City of Kuala Lumpur

Note: Any applicant aggrieved by any condition imposed by the Commissioner in granting the planning permission in respect of his application, may appeal to the Appeal Board within one month from the date of communication of such decision to him in accordance with subsection 23(1) of the Federal Territory (Planning) Act 1982 [Act 267] and shall follow the procedure prescribed in the Federal Territory (Planning) (Appeal Board) Rules 1997

[P.U. (A) 367/1997].

Commissioner of the City of Kuala Lumpur

Reference. No. .……………………………………….

Date: ……………………………………………………….

P.U. (A) 179 88

FORM C

[Paragraph 4(b)]

NOTICE OF REFUSAL TO GRANT PLANNING PERMISSION

…………………………………………….

………………………………………….…

…………………………………………….

TAKE NOTE that the application for the development of ..............................................................

....................................................................................................................................... on Lot No. …….................…………..

Jalan ............................................................. Section/Taman …………................………… Mukim ……….........……….

of the Federal Territory of Kuala Lumpur has been refused for the following reasons:

(a)

…………………………………………………………………….......................................................................................

(b)

…………………………………………………………………….......................................................................................

...........………...…………….....……………………..............

Commissioner of the City of Kuala Lumpur

Note: Any applicant aggrieved by the decision of the Commissioner in refusing his application for planning permission, may appeal to the Appeal Board within one month from the date of communication of such decision to him in accordance with subsection 23(1) of the

Federal Territory (Planning) Act 1982 [Act 267] and shall follow the procedure prescribed in the Federal Territory (Planning) (Appeal Board) Rules 1997 [P.U. (A) 367/1997].

Commissioner of the City of Kuala Lumpur

Reference No. …………………….………………….

Date: …………………………………………………….

P.U. (A) 179 89

FORM D

[Subrule 5(1)]

APPLICATION FOR EXTENSION OF VALIDITY PERIOD OF DEVELOPMENT ORDER

Commissioner of the City of Kuala Lumpur

*I/We ………………………………......................……………. I/C No. ……….................………………………. of address

.....................……………………………………………………… hereby apply for an extension validity period of the development order Reference No. ………….....……….. dated …......................…………. for the proposed development ……………………………….. on Lot No. ……....................………….. Jalan ...............................................

Section/Taman ……………...……… Mukim …..........……………. of the Federal Territory of Kuala Lumpur.

2.

*I/We are the owner of the said land.

3.

*I/We apply for an extension of validity period of the development order for the following reasons:

……………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………

4.

The extension period applied for is:

……………………………………………………………………………………………………………………...…………….

5.

*I/We attach receipt No. …………………. for the sum of RM (………..……………………. ringgit)

issued to me on …………………………….. in respect of the fee for filing of my/our original application for development order.

6.

*I/We hereby agree to all the conditions imposed by the Commissioner.

Date: …………………………

………….………………………………..

Signature of Applicant

*Delete whichever is not applicable

P.U. (A) 179 90

FORM E1

[Subrule 5(2)]

EXTENSION OF VALIDITY PERIOD OF DEVELOPMENT ORDER

………………………………................…

………………………………................…

……………................……………………

TAKE NOTE that the application for an extension of validity period of the development order Reference No. ………………………................................................… on Lot No. ……..................…………..

Jalan ...................................................... Section/Taman ……………...........……… Mukim …………...................…….

of the Federal Territory of Kuala Lumpur has been *granted *without any conditions/*subject to the following conditions ……………………………………………………. until ............................................................

/*refused due to following reasons ...............................................................................................................................

.............................................................................................

Commissioner of the City of Kuala Lumpur

*Delete whichever is not applicable

Commissioner of the City of Kuala Lumpur

Reference No. .……………………………………….

Date: …………………………………….……………….

P.U. (A) 179 91

FORM E2

[Subrule 5(2)]

EXTENSION OF VALIDITY PERIOD OF DEVELOPMENT ORDER

FOR TEMPORARY CHANGE OF USE OF BUILDING/LAND

To :

………………………………................…

…………………………................………

……………………………................……

TAKE NOTE that the application for an extension of validity period of the development Reference No. ……………….............................… on Lot No. …......................................……………..

Jalan ................................................... Section/Taman ………......……….......…… Mukim …...................…………….

of the Federal Territory of Kuala Lumpur has been *granted *without any conditions/subject to the following conditions ……………………………………………………………………………………………..………….

until ........................................................................................................................ /*refused due to following reason .........................................................................................................................................................................................

....…………....………….....…………………….....................

Commissioner of the City of Kuala Lumpur

*Delete whichever is not applicable

Commissioner of the City of Kuala Lumpur

Reference No. .…………………………….………….

Date: …………………………………….………………..

P.U. (A) 179 92

FORM F

[Subrule 6(1)]

ORDER OF REVOCATION/MODIFICATION OF DEVELOPMENT ORDER

…………………………………............…

…………………………………............…

…………………………………............…

WHEREAS the Commissioner is hereby orders that it is necessary that the development order Reference No. ………………………………………… in connection with the proposed development for the Lot No. ………………............ Jalan .......................................... Section/Taman …...................…………………

Mukim ……….........…….. of the Federal Territory of Kuala Lumpur to be *revoked/modified with effect from the date of this notice. In accordance with the *revocation/modification, you are required to perform the following actions:

………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………

within thirty days from the date of notice.

2.

You may claim compensation for the *revocation/modification of the development order by submitting your claim in the Form G attached hereto within thirty days from the date of this notice.

3.

Claim for compensation must refer to the actual and reasonable cost incurred by you for the demolition work carried out due to the *revocation/modification of the approved development order.

………………...…..…………….......………….....................

Commissioner of the City of Kuala Lumpur

*Delete whichever is not applicable

Commissioner of the City of Kuala Lumpur

Reference No. .…………………………………….….

Date: ……………………………………..……………….

P.U. (A) 179 93

FORM G

[Subrule 6(2)]

APPLICATION FOR COMPENSATION OF REVOCATION/

MODIFICATION OF DEVELOPMENT ORDER

Commissioner of the City of Kuala Lumpur

*I/We ………………………………………...................……. I/C No. ……………....................…………………. of address

.....................………………………….......................……………………………

do hereby apply for the compensation for the *revocation/modification of the development order Reference No.

…………………............................................. dated …………............…...................... for the proposed development

……………………………….............................. on Lot No. ……................………….. Jalan ..................................................

Section/Taman …………………… Mukim …………...………… of the Federal Territory of Kuala Lumpur.

2.

*I/We are the *applicant/owner of the said land.

3.

*I/We submit herewith 2 copies which are duly certified for each of the following documents:

(a)

the Development Order;

(b)

the Order of Revocation/Modification of Development Order;

(c)

the relevant maps and plans submitted to the Commissioner of City of

Kuala Lumpur;

(d)

the date of commencement of work on the proposed development;

(a copy of Form B which is a Notice of Commencement/Resumption of Building

Operations under Building By-Laws (Federal Territory of Kuala Lumpur) 1985

[P.U. (A) 537/1985] and a copy of Form B which is a Notice of Commencement of

Earthworks under Earthworks (Federal Territory of Kuala Lumpur) 1988

[P.U. (A) 396/1998] shall be submitted as evidence)

P.U. (A) 179 94

(e)

demolition works were carried out based on Form F dated …………….…………..

Reference No. .……………………;

(f)

the total amount claimed must refer to the actual and reasonable cost incurred by *me/us in carrying out the demolition.

4.

Particulars of claim (use separate sheet if necessary)

.…………………………………………………………………………………………………………………………………...

……………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………

5.

*I/We hereby agree to all the conditions imposed by the Commissioner.

Date: ................................ ...….............…………………………

Signature of Applicant

*Delete whichever is not applicable

P.U. (A) 179 95

FORM H

[Subrule 6(3)]

OFFER OF COMPENSATION FOR REVOCATION/

MODIFICATION OF DEVELOPMENT ORDER

………………………………...........……

………………………………...........……

…………………………………..............

The Commissioner after considering your application for compensation claim in respect of *revocation/modification of development order made in Form G and in the subsequent hearing of your claim held on …….…………….., it was decided that the amount of compensation offered is RM …………………………………………….

2.

You are required to inform the Commissioner within fourteen (14) days from the date of this Form regarding your acceptance of the compensation amount offered, or whether you accept it with objection, or whether you do not accept the amount offered. If you do not respond within the specified period, the amount of compensation offered by the Commissioner will be paid to you as a final payment. However, if you do not accept the offer for amount of compensation, you are required to inform the Commissioner of your refusal within fourteen days (14) of receipt of this Form and you are required to submit the appeal to the Appeal Board within two (2) months from the date of this Notice for assessment of the amount of compensation to be paid.

………...………..…………………………...........................

Commissioner of the City of Kuala Lumpur

*Delete whichever is not applicable.

Commissioner of the City of Kuala Lumpur

Reference No. .……………………………….……….

Date: ………………………………….………………….

P.U. (A) 179 96

SECOND SCHEDULE

[Subrules 2(1) and 5(1)]

FEES

(1)

Type of Application

(2)

Fee 1.

(a)

Residential

(i)

RM50.00 per unit

(ii)

RM25.00 per unit as determined by the government from time to time as low cost house

(iii)

Residents'

facilities in the development of apartments/

condominiums, according to the rates imposed for development 1(b)

(b)

Commercial, industrial, educational, hotel, workshop, public facilities or any other development

RM40.00 per 1,000 square feet

(c)

Petrol and service station

RM5,000.00 per station

(d)

Mixed development

RM40.00 per 1,000 square feet

(e)

Addition and alteration to development (b) above

RM40.00 per 1,000 square feet

(f)

Alteration/modification of building facade for each floor

RM100.00 per floor 2.

Open parking lot

RM10.00 per parking space 3.

Change of use of land

RM5,000.00 per application 4.

Temporary change of use of land/building

RM500.00 per application 5.

Subdivision and/or amalgamation of land (layout plan)

RM500.00 per acre or part thereof

6.

Amendment of subdivision and amalgamation of land (layout plan)

RM500.00 per acre or part thereof

P.U. (A) 179 97

(1)

Type of Application

(2)

Fee 7.

Application for telecommunication tower/structure

RM6,200.00 per structure

8.

Extension of development order

In accordance with the original filing rate 9.

Extension of development order for temporary change of use of land/building

In accordance with the original filing rate 10.

Amendment of development order

In accordance with rates charged in subitem 1(a) for residential

11.

Application for advertisement display structure:

In accordance with rates charged in subitem 1(b) for other developments

(i)

on the ground

a)

large size

(60 feet x 40 feet or 40 feet x 30 feet)

RM500.00 per structure

b)

medium size

(of 10 feet x 40 feet or

15 feet x 20 feet or

30 feet x 20 feet )

RM300.00 per structure

c)

small size

(10 feet x 5 feet)

RM200.00 per structure

(ii)

on the parapet flyover

RM300.00 per structure

(iii)

on the flyover pillars

RM300.00 per structure

(iv)

on the bridge structure

RM300.00 per structure

(v)

at the bridge pillars

RM300.00 per structure

(vi)

pylon

RM300.00 per structure

(vii)

on the tunnel wall

RM300.00 per structure

(viii)

on the wall

RM300.00 per structure

P.U. (A) 179 98

(1)

Type of Application

(2)

Fee

(ix)

gantry

(only permitted on the highways and outside of the city center area)

RM500.00 per structure

Made 19 May 2025

[DBKL/JUP/BPPP/GN/1486(JLD. 8); PN(PU2)396/JLD.9]

DATO' SERI TPr (DR.) MAIMUNAH BINTI MOHD SHARIF

Commissioner of the City of Kuala Lumpur

Approved 10 June 2025

[KWP(S): 24/PUU/698/1/1/78 JLD 4; PN(PU2)396/JLD.9]

DATUK SERI DR. ZALIHA BINTI MUSTAFA

Minister in the Prime Minister’s Department

(Federal Territories)

Common questions

What is KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025?
KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 is Malaysia P.U. (A), cited as P.U. (A) 179 2025, currently marked in force and first recorded in 2025.
Is KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 still in force?
Yes — KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 is currently in force.
When did KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 take effect?
KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 was first recorded in 2025.
How many sections does KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 have?
KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 contains 4 sections.
Where can I read the official version of KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025?
The official text of KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 is published at lom.agc.gov.my.
KAEDAH-KAEDAH (PERANCANGAN) WILAYAH PERSEKUTUAN (PERMOHONAN UNTUK KEBENARAN PERANCANGAN) (WILAYAH PERSEKUTUAN KUALA LUMPUR) 2025 (No. 179)