/akn/my/act/pua/2020/277

PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2020
Sections
2

Quick answer

About this p.u. (a)

PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 is Malaysia P.U. (A), cited as P.U. (A) 277 2020, currently marked in force and first recorded in 2020.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh subseksyen 34(5) Akta Lembaga Pembangunan Industri Pembinaan Malaysia 1994 [Akta 520], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 1

Open as pageSuggest a correction

(1)

Perintah ini bolehlah dinamakan Perintah Lembaga Pembangunan

Industri Pembinaan Malaysia (Kadar Levi) 2020.

Suggest a correction

(2)

Perintah ini disifatkan telah berkuat kuasa mulai 1 Januari 2020 dan hendaklah terus berkuat kuasa bagi tempoh hingga 31 Disember 2021.

Kadar levi

Suggest a correction

Seksyen 2

Open as pageSuggest a correction

Kadar levi yang dikenakan terhadap kontraktor dikurangkan daripada suku peratus daripada jumlah kontrak kepada 0.125 peratus.

Dibuat 22 September 2020

[KKR.PUU.110-1/5/2 Jld.10; PN(PU2)546/V]

DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF

Menteri Kanan Kerja Raya

P.U. (A) 277 3

LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA ACT 1994

LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

(RATE OF LEVY) ORDER 2020

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by subsection 34(5) of the Lembaga Pembangunan Industri Pembinaan Malaysia Act 1994 [Act 520], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Lembaga Pembangunan Industri

Pembinaan Malaysia (Rate of Levy) Order 2020.

Suggest a correction

(2)

This Order is deemed to have come into operation from 1 January 2020

and shall continue to be in operation for the period until 31 December 2021.

Rate of levy 2.

The rate of levy imposed on a contractor is reduced from a quarter per centum of the contract sum to 0.125 per centum.

Made 22 September 2020

[KKR.PUU.110-1/5/2 Jld.10; PN(PU2)546/V]

DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF

Senior Minister of Works

Suggest a correction

Common questions

What is PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020?
PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 is Malaysia P.U. (A), cited as P.U. (A) 277 2020, currently marked in force and first recorded in 2020.
Is PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 still in force?
Yes — PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 is currently in force.
When did PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 take effect?
PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 was first recorded in 2020.
How many sections does PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 have?
PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 contains 2 sections.
Where can I read the official version of PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020?
The official text of PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 is published at lom.agc.gov.my.
PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2020 (No. 277)