/akn/my/act/pua/2026/121

PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2026
Sections
2

Quick answer

About this p.u. (a)

PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 is Malaysia P.U. (A), cited as P.U. (A) 121 2026, currently marked in force and first recorded in 2026.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh subseksyen 34(5) Akta Lembaga Pembangunan Industri Pembinaan Malaysia 1994 [Akta 520], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 1

Open as pageSuggest a correction

(1)

Perintah ini bolehlah dinamakan Perintah Lembaga Pembangunan

Industri Pembinaan Malaysia (Kadar Levi) 2026.

Suggest a correction

(2)

Perintah ini disifatkan telah berkuat kuasa mulai 1 Januari 2026 dan hendaklah terus berkuat kuasa bagi tempoh hingga 31 Disember 2026.

Kadar levi

Suggest a correction

Seksyen 2

Open as pageSuggest a correction

Kadar levi yang dikenakan terhadap kontraktor diubah daripada suku peratus daripada jumlah kontrak kepada 0.125 peratus daripada jumlah kontrak.

Dibuat 4 Mac 2026

[KKR.PUU.110-1/5/2 Jld.10; PN(PU2)546/JLD.6]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

P.U. (A) 121 3

LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA ACT 1994

LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA

(RATE OF LEVY) ORDER 2026

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by subsection 34(5) of the Lembaga Pembangunan Industri Pembinaan Malaysia Act 1994 [Act 520], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Lembaga Pembangunan Industri

Pembinaan Malaysia (Rate of Levy) Order 2026.

Suggest a correction

(2)

This Order is deemed to have come into operation from 1 January 2026 and shall continue to be in operation for the period until 31 December 2026.

Rate of levy 2.

The rate of levy imposed on a contractor is varied from a quarter per centum of the contract sum to 0.125 per centum of the contract sum.

Made 4 March 2026

[KKR.PUU.110-1/5/2 Jld.10; PN(PU2)546/JLD.6]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

Suggest a correction

Common questions

What is PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026?
PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 is Malaysia P.U. (A), cited as P.U. (A) 121 2026, currently marked in force and first recorded in 2026.
Is PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 still in force?
Yes — PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 is currently in force.
When did PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 take effect?
PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 was first recorded in 2026.
How many sections does PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 have?
PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 contains 2 sections.
Where can I read the official version of PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026?
The official text of PERINTAH LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (KADAR LEVI) 2026 is published at lom.agc.gov.my.