Seksyen 1
(1)
Perintah ini bolehlah dinamakan Perintah Pengangkutan Jalan
(Larangan Penggunaan Jalan) (Jalan Persekutuan) 2012.
(2)
Perintah ini disifatkan telah mula berkuat kuasa pada 16 Disember 2011.
Larangan
/akn/my/act/pua/2012/14
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2012 is Malaysia P.U. (A), cited as P.U. (A) 14 2012, currently marked in force and first recorded in 2012.
Opening note
Perintah ini bolehlah dinamakan Perintah Pengangkutan Jalan
(Larangan Penggunaan Jalan) (Jalan Persekutuan) 2012.
Perintah ini disifatkan telah mula berkuat kuasa pada 16 Disember 2011.
Larangan
Pemanduan kenderaan di atas sebahagian jalan yang dinyatakan dalam ruang (1)
Jadual Pertama sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua, melainkan di atas jalan yang dinyatakan dalam ruang (2) Jadual Pertama, bagi tempoh yang dinyatakan dalam ruang (3) Jadual Pertama dilarang.
P.U. (A) 14 3
JADUAL PERTAMA
(1)
Jalan yang baginya larangan terpakai
(2)
Jalan arah yang dinyatakan
(3)
Tempoh larangan
1.
2.
Seluruh jalan masuk ke Kompleks
Bunga Raya dari persimpangannya dengan
Lebuh
Raya
KLIA di koordinat X 14940.406, Y 6243.082
hingga persimpangannya dengan
Jalan
Pekeliling di koordinat
15420.000,
Y
6451.000
sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
Seluruh jalan keluar dari Kompleks
Bunga
Raya di koordinat
X 15420.000, Y 6451.000 hingga persimpangannya dengan
Lebuh
Raya
KLIA di koordinat
15190.700,
Y
6304.000
sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
Kenderaan ke Kompleks
Bunga Raya melalui Lebuh
Raya KLIA hendaklah menggunakan jalan alternatif melalui
Aras
Ketibaan
Bangunan
Terminal Utama KLIA dan
Jambatan
No.
5
sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
Kenderaan yang keluar dari Kompleks Bunga Raya hendaklah menggunakan
Jalan
Pekeliling dan
Jambatan
No.
5
untuk masuk ke Lebuh Raya KLIA sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
16 Disember 2011
hingga 30 September 2012
16 Disember 2011
hingga 30 September 2012
P.U. (A) 14 4
JADUAL KEDUA
P.U. (A) 14 5
Dibuat 3 Januari 2012
[KKR.PUU.110-1/6/1 jld.3; PN(PU2)460/LXIV]
DATUK SERI SHAZIMAN BIN ABU MANSOR
Menteri Kerja Raya
P.U. (A) 14 6
ROAD TRANSPORT ACT 1987
ROAD TRANSPORT (PROHIBITION OF USE OF ROAD)
(FEDERAL ROADS) ORDER 2012
WHEREAS by P.U. (B) 591/2011 published on 1 December 2011, notice was given of the intention to make an order under subsections 70(1) and (2) of the Road Transport Act 1987 [Act 333]:
AND WHEREAS no objection was received by the Minister of Works against the making of such order:
NOW THEREFORE, in exercise of the powers conferred by subsections 70(1)
and (2) of the Act, the Minister of Works, after taking into consideration the matters referred to in subsection 70(2) of the Act, makes the following order:
Citation and commencement 1.
(1)
This order may be cited as the Road Transport (Prohibition of Use of
Road) (Federal Roads) Order 2012.
(2)
This Order is deemed to have come into operation on 16 December 2011.
Prohibition 2.
The driving of vehicles on the part of the road as specified in column (1) of the
First Schedule as shown on the map in the Second Schedule, otherwise than on the routes specified in column (2) of the First Schedule, for the period specified in column
of the First Schedule is prohibited.
P.U. (A) 14 7
FIRST SCHEDULE
(1)
Road to which prohibition applies
(2)
Routes specified
(3)
Prohibition period
1.
The entire access road to Bunga
Raya Complex from its junction with
KLIA
Highway at coordinates
14940.406,
Y 6243.082 to its junction with
Pekeliling Road at coordinates
X 15420.000, Y 6451.000 as shown on the map in the Second
2.
The entire exit road from Bunga
Raya Complex at coordinates
X 15420.000, Y 6451.000 to its junction with KLIA Highway at coordinates
15190.700,
Y 6304.000 as shown on the map in the Second Schedule
Vehicles to
Bunga
Raya
Complex via KLIA Highway shall use the alternative route via the Arrival Level of the KLIA Main Terminal
Building and Bridge No. 5 as shown on the map in the
Second Schedule
Vehicles exiting from Bunga
Raya Complex shall use
Pekeliling Road and Bridge
No. 5 to access the KLIA
Highway as shown on the map in the Second Schedule
16 December 2011
to 30 September 2012
16 December 2011
to 30 September 2012
P.U. (A) 14 8
SECOND SCHEDULE
P.U. (A) 14 9
Made 3 January 2012
[KKR.PUU.110-1/6/1 jld.3; PN(PU2)460/LXIV]
DATUK SERI SHAZIMAN BIN ABU MANSOR
Minister of Works