Seksyen 1
(1)
Perintah ini bolehlah dinamakan Perintah Pengangkutan Jalan
(Larangan Penggunaan Jalan) (Jalan Persekutuan) 2016.
/akn/my/act/pua/2016/176
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 is Malaysia P.U. (A), cited as P.U. (A) 176 2016, currently marked in force and first recorded in 2016.
Opening note
Perintah ini bolehlah dinamakan Perintah Pengangkutan Jalan
(Larangan Penggunaan Jalan) (Jalan Persekutuan) 2016.
Pemanduan kenderaan di atas bahagian jalan yang dinyatakan dalam ruang (1)
Jadual Pertama sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua, melainkan di atas jalan yang dinyatakan dalam ruang (2) Jadual Pertama, bagi tempoh yang dinyatakan dalam ruang (3) Jadual Pertama dilarang.
P.U. (A) 176 3
JADUAL PERTAMA
(3)
Tempoh larangan
18 Jun 2016 hingga 15 September 2016
16 September 2016
hingga 31 Disember 2016
(1)
Jalan yang baginya larangan terpakai
1.
Jambatan darat kilometer 3.1
hingga kilometer 2.8 arah timur
(Batu Maung ke Batu
Kawan)
yang menghubungkan
Jambatan Sultan Abdul
Halim Mu’adzam Shah dengan
Lebuh
Raya
Juru-Jalan
Duta-Bukit
Raja, Lebuh Raya Utara
Selatan
Hubungan
Tengah dan Lebuh Raya
Kuala
Lumpur-Johor
Bahru sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
2.
Jambatan darat kilometer 2.8
hingga kilometer 3.1 arah barat
(Batu Kawan ke Batu
Maung)
yang menghubungkan Lebuh
Raya
Juru-Jalan
Duta-Bukit Raja, Lebuh Raya
Utara Selatan Hubungan
Tengah dan Lebuh Raya
Kuala
Lumpur-Johor
Bahru dengan Jambatan
Sultan
Abdul
Halim
Mu’adzam
Shah sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
(2)
Jalan arah
Kenderaan dari Lebuh Raya
Juru-Jalan Duta-Bukit Raja,
Lebuh Raya Utara Selatan
Hubungan
Tengah dan
Lebuh Raya Kuala Lumpur-Johor Bahru menuju ke arah
Jambatan
Sultan
Abdul
Halim
Mu’adzam
Shah hendaklah menggunakan jalan lencongan sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
Kenderaan dari Jambatan
Sultan
Abdul
Halim
Mu’adzam Shah menuju ke arah Lebuh Raya Juru-Jalan
Duta-Bukit
Raja,
Lebuh
Raya
Utara
Selatan
Hubungan
Tengah dan
Lebuh Raya Kuala Lumpur-Johor
Bahru hendaklah menggunakan jalan lencongan sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua
P.U. (A) 176 4
JADUAL KEDUA
KAWASAN KERJA
PENUTUPAN DUA LORONG KM 3.1 HINGGA KM 2.8 ARAH TIMUR
PERINGKAT 1: 18 JUN 2016 HINGGA 15 SEPTEMBER 2016
c)
PENUTUPAN DUA LORONG KM 3.1 HINGGA KM 2.8 ARAH BARAT
PERINGKAT 2: 16 SEPTEMBER 2016 HINGGA 31 DISEMBER 2016
KAWASAN KERJA
PETUNJUK:
JALAN YANG BAGINYA PERINTAH LARANGAN TERPAKAI
LALUAN LENCONGAN TIDAK MENGIKUT SKALA
P.U. (A) 176 5
Dibuat 17 Jun 2016
[KKR.PUU.110-1/6/15 Jld. 2; PN(PU2)460/LXXXVI]
DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF
Menteri Kerja Raya
P.U. (A) 176 6
ROAD TRANSPORT ACT 1987
ROAD TRANSPORT (PROHIBITION OF USE OF ROAD)
(FEDERAL ROADS) ORDER 2016
WHEAREAS by P.U. (B) 269/2016 published on 2 June 2016, notice was given of the intention to make an order under section 70 of the Road Transport Act 1987 [Act 333]:
AND WHEREAS no objection was received by the Minister of Works against the making of such order:
NOW THEREFORE, in exercise of the powers conferred by section 70 of the Act, the Minister of Works, after taking consideration the matters referred to in subsection 70(2) of the Act, makes the following order:
Citation and commencement 1.
(1)
This order may be cited as the
Road
Transport
(Prohibition of Use of Road) (Federal Roads) Order 2016.
(2)
This Order comes into operation on 18 June 2016.
Prohibition 2.
The driving of vehicles on the part of the road as specified in column (1) of the
First Schedule as shown on the map in the Second Schedule, otherwise than on the routes specified in column (2) of the First Schedule, for the period specified in column (3) of the First Schedule is prohibited.
P.U. (A) 176 7
FIRST SCHEDULE
(1)
Road to which prohibition applies
1.
Land bridge kilometre 3.1 to kilometre 2.8
east bound
(Batu
Maung to Batu Kawan)
which connects the
Jambatan Sultan Abdul
Halim Mu’adzam Shah with Juru-Jalan Duta-Bukit Raja Expressway,
North
South
Expressway
Central
Link and
Kuala
Lumpur-Johore Bahru
Expressway as shown on the map in the
Second Schedule
2.
Land bridge kilometre 2.8 to kilometre 3.1
west bound
(Batu
Kawan to Batu Maung)
which connects the
Juru-Jalan
Duta-Bukit
Raja Expressway, North
South
Expressway
Central Link and Kuala
Lumpur-Johore Bahru
Expressway with
Jambatan Sultan Abdul
Halim Mu’adzam Shah as shown on the map in the Second Schedule
(2)
Routes
Vehicles from the
Juru-Jalan
Duta-Bukit
Raja Expressway, North
South
Expressway
Central Link and Kuala
Lumpur-Johore
Bahru
Expressway to Jambatan
Sultan
Abdul
Halim
Mu’adzam Shah shall use the diverted route as shown on the map in the
Second Schedule
Vehicles from the
Jambatan Sultan Abdul
Halim Mu’adzam Shah to
Juru-Jalan
Duta-Bukit
Raja Expressway, North
South
Expressway
Central Link and Kuala
Lumpur-Johore
Bahru
Expressway shall use the diverted route as shown on the map in the Second
(3)
Prohibition period
18 June 2016 to 15
September 2016
16 September 2016
to 31
December 2016
P.U. (A) 176 8
SECOND SCHEDULE
WORKING AREA
DUAL CARRIAGEWAY CLOSURE KM 3.1 TO KM 2.8 EAST BOUND
STAGE 1: 18 JUNE 2016 TO 15 SEPTEMBER 2016
LEGEND:
ROAD TO WHICH PROHIBITION ORDER IS APPLICABLE
DIVERSION NOT AS PER SCALE b)
DUAL CARRIAGEWAY CLOSURE KM 3.1 TO KM 2.8 WEST BOUND
STAGE 2: 16 SEPTEMBER 2016 TO 31 DECEMBER 2016
WORKING AREA
P.U. (A) 176 9
Made 17 June 2016
[KKR.PUU.110-1/6/15 Jld. 2;PN(PU2)460/LXXXVI]
DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF
Minister of Works