Malaysia legislation

Section 9

of Efficient Management Electrical Energy Regulations 2024

Section 9

(a)

that the total net electrical energy generation or total electrical energy consumption for the reported period in Form A of the Second Schedule is below 3,000,000kWh;

(b)

that the private installation licensee or consumer has fully complied with the requirements of these Regulations; and

(c)

any other reason which the Commission deems fit to show efficient management of electrical energy at the installation for the reported period as in Form A of the Second Schedule.

(2)

The Commission shall, after reviewing the obligations of the private installation licensee or consumer under subregulation (1), by written notice notify the private

9

installation licensee or consumer that he or it is no longer required to further submit the information and report as specified in regulation 6.

(3)

The private installation licensee or consumer who is served with the written notice under subregulation (2) shall cease to submit the information and report as specified in regulation 6 with effect from the date of the notice.

Withdrawal

Section 9 — Efficient Management Electrical Energy Regulations 2024