Malaysia legislation

Section 9

of Electricity Supply Regulations 2024

Section 9

For the purpose of this Part —

“commissioned” means the inspection, tests and trial operations carried out on an equipment or installation or any part of it to verify and ascertain that the equipment or installation has been manufactured, fabricated, constructed, installed, set or adjusted according to the relevant safety, operational and performance requirements so that it is ready to be used, worked or operated; “distribution”

to include Electric Vehicle Charging Station; and

“installation capacity” means the maximum level of electrical power at which an installation can be used, worked on or operated for a period of time without causing damage to any part of the installation. However, for a transmission or distribution system, the installation capacity is at the maximum level of electrical power at which the system is expected or required to supply over a period of time, whichever is the higher.

6

[Subregulation 11(2)]

FEES FOR PUBLIC INSTALLATION FOR GENERATING ELECTRICITY USING

BIOMASS, BIOGAS, HYDROPOWER, SOLAR POWER, GEOTHERMAL POWER,

WIND POWER, WAVES AND TIDES SOURCES WITH AGGREGATE POWER NOT

EXCEEDING 5 MEGAWATTS