Seksyen 1
Peraturan-peraturan ini bolehlah dinamakan
Peraturan-Peraturan
Penyiasatan Kaji Bumi (Pemberitahuan Pemajuan Telaga dan Korekan) 2013.
/akn/my/act/pua/2013/288
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERATURAN-PERATURAN PENYIASATAN KAJI BUMI (PEMBERITAHUAN PEMAJUAN TELAGA DAN KOREKAN) 2013 is Malaysia P.U. (A), cited as P.U. (A) 288 2013, currently marked in force and first recorded in 2013.
Opening note
Peraturan-peraturan ini bolehlah dinamakan
Peraturan-Peraturan
Penyiasatan Kaji Bumi (Pemberitahuan Pemajuan Telaga dan Korekan) 2013.
Tafsiran
“air” ertinya air yang ditemui di bawah permukaan bumi termasuk mata air dan punca-punca geoterma;
“korekan” ertinya suatu perbuatan atau proses untuk menembusi permukaan, bawah permukaan atau pemindahan isi bumi secara manual atau mekanikal dengan menggunakan mesin atau peralatan;
“lelubang” ertinya suatu lekuk atau lekukan kecil;
“lubang” ertinya suatu bukaan atau rongga atau ruang geronggang di permukaan atau bawah permukaan bumi;
“mencari” ertinya aktiviti pencarian, penemuan, penyiasatan dan penerokaan air;
“menggali” ertinya suatu proses membuat bukaan di permukaan atau di bawah permukaan bumi;
P.U. (A) 288 3
“menggerek” ertinya suatu proses memotong, menggerudi atau meletupkan, bagi tujuan membuat bukaan di permukaan atau bawah permukaan bumi;
“menggerudi” ertinya suatu proses untuk menembusi permukaan bumi, tanah atau batu-batan dengan menggunakan mesin atau peralatan;
“pengambilan” ertinya suatu proses mengeluarkan apa-apa bahan dari isi bumi;
“syaf” ertinya apa-apa bukaan menegak atau condong di bawah permukaan bumi;
“tarahan” ertinya suatu proses memindahkan atau memisahkan bahan dari permukaan atau bawah permukaan yang mendedahkan batu hampar;
“telaga” ertinya apa-apa lubang yang berlapik atau yang tidak berlapik atau struktur yang digunakan untuk pencarian, pemantauan, persampelan dan pengambilan air bawah tanah dan termasuk yang digunakan untuk imbuhan air bawah tanah;
“terowong” ertinya suatu korekan memanjang atau sempit di bawah tanah atau bukaan bawah air atau laluan yang lurus dengan panjang yang melebihi lebar atau ketinggiannya;
Pemberitahuan mengenai pemajuan telaga
Mana-mana orang yang berhasrat untuk menggerek, menggerudi, menggali atau dengan cara lain memajukan suatu telaga bagi maksud mencari atau mengambil air daripadanya hendaklah memberitahu Ketua Pengarah mengenai apa-apa butir sebagaimana yang dinyatakan dalam Borang 1 Jadual dalam tempoh empat belas hari bekerja sebelum aktiviti yang dicadangkan itu dijalankan.
Mana-mana orang yang telah menggerek, menggerudi, menggali atau dengan cara lain memajukan suatu telaga bagi maksud mencari atau mengambil air daripadanya hendaklah memberitahu Ketua Pengarah mengenai apa-apa butir
P.U. (A) 288 4
sebagaimana yang dinyatakan dalam Borang 2 Jadual dalam tempoh empat belas hari bekerja selepas menjalankan aktiviti itu.
Mana-mana orang yang telah menggerek, menggerudi, menggali atau dengan cara lain memajukan suatu telaga bagi maksud mencari atau mengambil air daripadanya sebelum tarikh mula berkuat kuasanya Peraturan-Peraturan ini hendaklah memberitahu Ketua Pengarah mengenai apa-apa butir sebagaimana yang dinyatakan dalam Borang 2 Jadual dalam tempoh enam bulan dari tarikh mula berkuat kuasanya
Peraturan-Peraturan ini.
Pemberitahuan mengenai korekan
Mana-mana orang yang berhasrat untuk menggerek, menggerudi, menggali atau dengan cara lain memajukan suatu lubang, lelubang, syaf, terowong, tarahan atau korekan lain yang mendedahkan batu hampar hendaklah memberitahu
Ketua Pengarah mengenai apa-apa butir sebagaimana yang dinyatakan dalam Borang 3
Jadual dalam tempoh empat belas hari bekerja sebelum aktiviti yang dicadangkan itu dijalankan.
Mana-mana orang yang telah menggerek, menggerudi, menggali atau dengan cara lain memajukan suatu lubang, lelubang, syaf, terowong, tarahan atau korekan lain yang mendedahkan batu hampar hendaklah memberitahu Ketua Pengarah mengenai apa-apa butir sebagaimana yang dinyatakan dalam Borang 4 Jadual dalam tempoh empat belas hari bekerja selepas menjalankan aktiviti itu.
Mana-mana orang yang telah menggerek, menggerudi, menggali atau dengan cara lain memajukan suatu lubang, lelubang, syaf, terowong, tarahan atau korekan lain yang mendedahkan batu hampar sebelum tarikh mula berkuat kuasanya
Peraturan-Peraturan ini hendaklah memberitahu Ketua Pengarah apa-apa butir sebagaimana yang dinyatakan dalam Borang 4 Jadual dalam tempoh enam bulan dari tarikh mula berkuat kuasanya Peraturan-Peraturan ini.
P.U. (A) 288 5
JADUAL
BORANG 1
[Subperaturan 3(1)]
PEMBERITAHUAN MENGENAI PEMAJUAN TELAGA
Jabatan Mineral dan Geosains
Malaysia
Tingkat 20, Bangunan Tabung Haji,
Jalan Tun Razak,
50658 KUALA LUMPUR
No. Tel. : 603-21611033
No. Faks. : 603-21611036
Laman Web : www.jmg.gov.my
Semua bahagian dalam pemberitahuan ini hendaklah diisi dan mudah dibaca
1.0
Maklumat pemberi maklumat
Untuk diisi jika pemberitahuan ini dibuat oleh individu
Nama penuh:
pasport :
Alamat yang boleh dihubungi:
No. tel.:
No. tel. bimbit:
No. faks.:
Alamat e-mel:
Untuk diisi jika pemberitahuan ini dibuat bagi pihak syarikat/organisasi
Nama syarikat/organisasi:
No. pendaftaran syarikat:
No. lesen perdagangan:
Aktiviti utama syarikat:
Untuk kegunaan pejabat sahaja
No. pemberitahuan:
Tarikh diterima:
No. ruj. telaga:
P.U. (A) 288 6
Butir-butir wakil syarikat
Nama penuh:
No. K.P./ No. pasport:
Jawatan:
Alamat yang boleh dihubungi:
No. tel.:
No. tel. bimbit:
No. faks.:
Alamat e-mel:
2.0
Jenis kerja
Penggerudian lubang gerek
Pembinaan telaga
Pengubahsuaian telaga
Pemulihan telaga
Penutupan telaga
Lain-lain
(sila nyatakan)
3.0
Cadangan kegunaan telaga
Domestik
Pertanian
Industri
Akuakultur
Pemantauan
Lain-lain
(sila nyatakan)
4.0
Cadangan kaedah penggerudian
Putaran
Tukulan
Lain-lain
(sila nyatakan)
P.U. (A) 288 7
5.0
Cadangan jenis lumpur penggerudian yang digunakan
Bentonit
Polimer
Lain-lain
(sila nyatakan)
6.0
Butir-butir telaga
Cadangan kadar pengambilan
(dalam m3/hari) :
____________________
Rujukan peta :
_________________ Utaraan:
_____________
Timuran:
______________
Lokasi : __________________________________________________________________________________________
Alamat : __________________________________________________________________________________________
No. Lot : ___________________________________________________________________________________________
Mukim : ____________ Daerah : _________________ Bahagian : ____________________
Negeri : ___________________________________________________________
(Sila lampirkan peta yang menunjukkan cadangan lokasi lubang gerek/telaga/telaga sedia ada)
Butir-butir cadangan lubang gerek/telaga:
Cadangan kedalaman telaga (m):
________________ Diameter telaga (mm): ________________
Butir-butir cadangan telaga yang hendak diubah suai/dipulihkan:
Kedalaman telaga (m): ____________ Cadangan kedalaman baru telaga (m): ______________
Diameter telaga (mm): ____________ Cadangan diameter baru telaga (mm): ______________
Kaedah yang digunakan untuk pemulihan telaga: ___________________________________________
Bahan kimia yang digunakan untuk pemulihan telaga: ______________________________________
P.U. (A) 288 8
Butir-butir penutupan telaga:
Kaedah yang digunakan untuk penutupan telaga: ___________________________________________
Bahan-bahan yang digunakan untuk penutupan telaga:_____________________________________
Jenis akuifer:
Aluvium/Tanih
Batuan keras
Cadangan bahan-bahan yang digunakan untuk binaan telaga :
PVC
Besi bergalvani
Keluli tahan karat
Lain-lain
(sila nyatakan)
7.0 Butir-butir syarikat penggerudian dan penggerudi berlesen
Nama syarikat penggerudian :__________________ No. Pendaftaran syarikat: ______________
Nama penggerudi:
_________________
No. lesen: __________________
(Sila lampirkan salinan perakuan pendaftaran syarikat)
8.0 Butir-butir pemilik tanah
Nama:
No. K.P.:
Alamat:
No. telefon: No. faks:.
Status tanah:
Kebenaran diberi: Ya
Tidak
P.U. (A) 288 9
9.0 Maklumat tambahan
Aktiviti guna tanah (dalam lingkungan 500m):____________________________________________
Badan air permukaan berhampiran (m): ___________________
Jarak dari telaga-telaga sedia ada (m): _____________________
Saya memperakui bahawa maklumat yang diberikan adalah benar dan tepat sepanjang pengetahuan saya.
________________________________________
__________________
Tandatangan pemberi maklumat
Tarikh
P.U. (A) 288 10
BORANG 2
[Subperaturan 3(2) dan (3)]
PEMBERITAHUAN MAKLUMAT TELAGA
Jabatan Mineral dan Geosains
Malaysia
Tingkat 20, Bangunan Tabung Haji,
Jalan Tun Razak,
No. Tel: 603-21611033
Faks : 603-21611036
Laman Web: www.jmg.gov.my
Semua bahagian dalam pemberitahuan ini hendaklah diisi dan mudah dibaca
1.0
Maklumat pemberi maklumat
Untuk diisi jika pemberitahuan ini dibuat oleh individu
Nama penuh:
pasport :
Alamat yang boleh dihubungi:
No. tel.:
No. tel. bimbit:
No. faks:
Alamat e-mel:
Untuk diisi jika permohonan ini dibuat bagi pihak syarikat/organisasi
Nama syarikat/organisasi :
No. pendaftaran syarikat:
No. lesen perdagangan:
Aktiviti utama syarikat:
Untuk kegunaan pejabat sahaja
No. pemberitahuan
Tarikh diterima
No. ruj. telaga
P.U. (A) 288 11
2.0
Butir-butir lokasi telaga
(Sila lampirkan peta yang menunjukkan lokasi lubang gerek/telaga)
3.0
Kegunaan telaga
Domestik
Pertanian
Industri
Akuakultur
Pemantauan
Lain-lain (sila nyatakan)
____________________
Butir-butir wakil syarikat
Nama penuh:
No. K.P./No. pasport :
Jawatan:
Alamat yang boleh dihubungi:
No. tel.:
No.tel. bimbit:
No. faks:
Alamat e-mel:
Rujukan peta:
________________ Utaraan
________________ Timuran
Lokasi:
Alamat : __________________________________________________________________________
No. Lot : _________________________________________________________________________________________
Mukim: _____________ Daerah: __________________________ Bahagian: __________________________
Negeri: ___________________________________________________________
P.U. (A) 288 12
4.0
Data telaga
Tarikh telaga disiapkan: _______________________ (hb/bln/thn)
Jenis akuifer: tak terkekang/terkekang/separa terkekang
Aras muka tanah:
___________ m (aras laut min)
Aras air statik: __________ m (bawah aras permukaan bumi) atau __________ m (aras laut min)
Tarikh pengukuran: ____________
Log geologi dan reka bentuk telaga:__________________
(Sila sediakan log litologi menggunakan Lampiran A, termasuk satu salinan log geofizik menuruni lubang, jika ada)
Ciri-ciri telaga dan akuifer: (diisi sekiranya berkaitan)
Luahan telaga (m3/j): __________________
Kapasiti spesifik (m2/j): __________________
Kecekapan telaga (%): __________________
Kebolehsimpanan/luahan spesifik: __________________
Keterusan (m2/j): __________________
(Sila sediakan maklumat ujian pengepaman menggunakan Lampiran B, C dan D. Sertakan salinan analisis ujian-ujian pengepaman)
Kualiti air tanah: (diisi sekiranya berkaitan)
Tarikh pensampelan: ___________________ (hb/bln/thn)
Tarikh analisis: ___________________ (hb/bln/thn)
Konduktiviti: __________ µS/cm pH: ____________
Klorida: __________ mg/L
Oksigen terlarut: __________ mg/L
Jumlah pepejal terlarut: __________ mg/L
Jumlah besi: __________ mg/L
Jumlah kealkalian: __________ mg/L Bakteria (E-coli): __________ CPU/100mL
(Sila sertakan satu salinan laporan makmal yang lengkap)
P.U. (A) 288 13
Saya memperakui bahawa maklumat yang diberikan adalah benar dan tepat sepanjang pengetahuan saya.
_____________________________________
_____________________
Tandatangan pemberi maklumat
Tarikh
P.U. (A) 288 14
LAMPIRAN A
LOG GEOLOGI DAN REKABENTUK TELAGA
PROJEK :
NO. PROJEK : KAEDAH PENGGERUDIAN :
NO. TELAGA : (1) Kedalaman:
Kaedah: TARIKH & MASA MULA :
LOKASI : (2) Kedalaman:
Kaedah: TARIKH & MASA SIAP :
Kedalaman:
Kaedah: PEMILIK :
JUMLAH KEDALAMAN :
m
SYARIKAT PENGGERUDIAN:
TINGGI KOLAR :
m JURU GERUDI :
KOORDINIT : U T ARAS AIR STATIK : m (b.a.p.b.)
KETINGGIAN : m (a.l.m.) TARIKH PENGUKURAN: MESIN PENGGERUDIAN :
KEDALAMAN
(m)
LITOLOGI
GRAFIK
PENEMUAN
AIR (m3/jam)
KADAR
PENEMBUSAN
LOG
GEOFIZIK
KETERANGAN
(Warna, tekstur, struktur, batuan/tanah dsb…)
CATATAN
REKA BENTUK TELAGA
PENYIAPAN TELAGA :
Kedalaman telaga :………………………. (m)
Jenis skrin :………………………. Dilog oleh: …………………………………………………… Disahkan oleh: ……………………………………………
Jenis selongsong :………………………. Jawatan : …………………………………………………… Jawatan : …………………………………………….
Anggaran luahan :……………………… (m3/h) Tarikh : …………………………………………………… Tarikh : ………………………………………………
Nota: a.l.m. – aras laut min b.a.p.b. – bawah aras permukaan bumi
P.U. (A) 288 15
LAMPIRAN B
REKOD UJIAN PENGEPAMAN SURUTAN BERPERINGKAT
No. telaga:
……………….
Permulaan pengepaman:
Kedalaman telaga:
………………. m
Masa:
………………..
Sela saringan:
………………. m
Tarikh:
………………...
Jenis telaga:
……………….
Tamat pengepaman:
Jarak dari telaga yang dipam:
………………. m
Masa:
……………….
Tinggi kolar:
………………. m
Tarikh:
……………….
Aras laras permukaan bumi:
………………. m(a.l.m.)
Aras air statik:
………………. m(b.a.p.b.)
Direkod oleh:
..........................................
Kadar pengepaman:
……………… m3/jam
Disahkan oleh ahli geologi berdaftar:
……………………………
Kedalaman pam:
………………. m
Tarikh:
……………………………
Jenis pam:
………………. m
Nota: a.l.m. – aras laut min b.a.p.b. – bawah aras permukaan bumi
P.U. (A) 288 16
Masa dari mula pengepaman
(min)
Fasa 1
Fasa 2
Fasa 3
Fasa 4
Fasa 5
Catatan
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
P.U. (A) 288 17
Masa dari mula pengepaman
(min)
Fasa 1
Fasa 2
Fasa 3
Fasa 4
Fasa 5
Catatan
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Luahan (Q) =
m3/jam
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
Aras Air
(m)
Surutan
(m)
55.0
60.0
65.0
70.0
80.0
90.0
100.0
110.0
120.0
130.0
140.0
150.0
160.0
170.0
180.0
P.U. (A) 288 18
LAMPIRAN C
REKOD UJIAN PENGEPAMAN LUAHAN TETAP
No. telaga:
………………
Permulaan pengepaman:
Kedalaman telaga:
……………… m
Masa:
………………
Sela saringan:
……………… m
Tarikh:
………………
Jenis telaga:
………………
Jarak dari telaga yang dipam:
……………… m
Tamat pengepaman:
Ketinggian kolar:
……………… m
Masa:
……………….
Aras laras muka bumi:
……………… m(a.l.m.) Tarikh:
……………….
Direkod oleh:
………………
Aras air statik:
……………… m(b.a.p.b.)
Diperakui oleh ahli geologi
Kadar pengepaman:
……………m3/hari berdaftar:
………………
Kedalaman pam of pump: ………………m
Tarikh:
……………….
Jenis pam:
……………….
Tarikh/
Masa
Masa mula pengepaman
Aras air (m)
Surutan
(m)
Catatan
Tarikh/
Masa
Masa mula pengepaman
(min)
Aras air (m)
Surutan
(m)
Catatan
(min)
0.00
160.00
0.20
200.00
0.50
250.00
1.00
300.00
1.50
350.00
2.00
400.00
2.50
450.00
3.00
500.00
3.50
550.00
4.00
600.00
P.U. (A) 288 19
4.50
700.00
5.00
800.00
6.00
900.00
7.00
1000.00
8.00
1200.00
9.00
1400.00
10.00
1600.00
15.00
1800.00
20.00
2000.00
25.00
2250.00
30.00
2500.00
35.00
3000.00
40.00
3400.00
45.00
3800.00
50.00
4200.00
55.00
4600.00
60.00
5000.00
70.00
5500.00
80.00
6000.00
90.00
6500.00
100.00
7000.00
120.00
7500.00
Nota: a.l.m. – aras laut min b.a.p.b. – bawah aras permukaan bumi
P.U. (A) 288 20
LAMPIRAN D
REKOD UJI PULIH TELAGA
No. telaga:
………………
Permulaan pengepaman:
Kedalaman telaga:
……………… m
Masa:
………………
Sela saringan:
……………… m
Tarikh:
………………
Jenis telaga:
………………
Jarak dari telaga yang dipam:
……………… m
Pengepaman tamat:
Ketinggian kolar:
……………… m
Masa:
……………….
Aras laras muka bumi:
……………… m(a.l.m.) Tarikh:
……………….
Direkod oleh:
………………
Aras air statik:
………………m (b.a.p.b.)
Kadar pengepaman:
………………m3/hari
Diperakui oleh ahli geologi berdaftar:
………………
Kedalaman pam Type of ………………m
Tarikh:
……………….
Jenis pam:
……………….
Tarikh/
Masa
Masa dari mula pengepa-man
(min)
Masa dari berhenti mengepam
(min)
t/t’
Aras air
(m)
Surutan baki
(m)
Tarikh/
Masa
Masa dari mula pengepa-man
(min)
Masa dari berhenti mengepam
(min)
t/t’
Aras air
(m)
Surutan baki
(m)
0.00
70.00
0.50
80.00
1.00
90.00
1.50
100.00
2.00
120.00
2.50
140.00
3.00
160.00
3.50
180.00
4.00
210.00
P.U. (A) 288 21
4.50
240.00
5.00
270.00
6.00
300.00
7.00
360.00
8.00
420.00
9.00
480.00
10.00
540.00
15.00
600.00
20.00
660.00
25.00
720.00
30.00
780.00
35.00
840.00
40.00
900.00
45.00
960.00
50.00
1020.00
55.00
1080.00
60.00
1140.00
Nota: a.l.m. – aras laut min b.a.p.b. – bawah aras permukaan bumi
P.U. (A) 288 22
BORANG 3
[Subperaturan 4(1)]
PEMBERITAHUAN MENGENAI KOREKAN
Jabatan Mineral dan Geosains
Malaysia
Tingkat 20, Bangunan Tabung Haji,
Jalan Tun Razak,
No.Tel: 603-21611033
Faks: 603-21611036
Laman Web: www.jmg.gov.my
Semua bahagian dalam pemberitahuan ini hendaklah diisi dan mudah dibaca
1.0
Maklumat pemberi maklumat
Untuk diisi jika pemberitahuan ini dibuat oleh individu
Nama penuh:
pasport :
Alamat yang boleh dihubungi:
No. tel.:
No.tel. bimbit:
No. faks.:
Alamat e-mel:
Untuk diisi jika pemberitahuan ini dibuat bagi pihak syarikat/organisasi
Nama syarikat/organisasi:
No. pendaftaran syarikat:
No. lesen perdagangan:
Aktiviti utama syarikat:
Untuk kegunaan pejabat sahaja
No. pemberitahuan
Tarikh diterima
No. ruj. telaga
P.U. (A) 288 23
Butir-butir wakil syarikat
Nama penuh:
No. K.P./No. pasport :
Jawatan:
Alamat yang boleh dihubungi:
No. tel.:
No.tel. bimbit:
No. faks.:
Alamat e-mel:
2.0
Kaedah korekan yang dicadangkan
Gerek
Gerudi
Gali
Lelubang
Syaf
Terowong
Tarahan
Lain-lain (sila nyatakan)
3.0
Tujuan korekan
__________________________________________________________________________ (sila nyatakan)
4.0
Butir-butir lokasi _______________________________________________________________________
Rujukan Peta :
Utaraan
Timuran
Lokasi:
Alamat : __________________________________________________________________________
No. Lot : _________________________________________________________________________________________
P.U. (A) 288 24
Mukim: ____________
Daerah: _________________ Bahagian: ____________________
Negeri: ___________________________________________________________
(Sila sertakan peta kunci menunjukkan lokasi sebenar)
Aktiviti guna tanah (dalam lingkungan 500m): ___________________________________
Badan air permukaan berhampiran (m): _________________________________________________
Jarak dari korekan-korekan sedia ada (m): _________________
Cadangan kedalaman korekan (m): _________________
Cadangan dimensi korekan (panjang x lebar x dalam) (m): _____________
5.0
Butir-butir kontraktor
Nama kontraktor: _______________________________ No. pendaftaran syarikat:___________________
(Sila sertakan satu salinan perakuan pendaftaran)
6.0
Butir-butir pemilik tanah
Nama: ____________________________________________________
No. K.P./No. pasport: ____________________
Alamat:____________________________________________________________________________________________
_____________________________________________________________________________________________
No. tel.: ________________________ No. faks: _____________________
Status tanah: __________________________
Kebenaran diberi:
Ya
Tidak
(Sila sertakan surat kebenaran daripada pemilik hartanah dan pelan susun atur yang menunjukkan cadangan lokasi korekan)
P.U. (A) 288 25
Saya memperakui bahawa maklumat yang diberikan adalah benar dan tepat sepanjang pengetahuan saya.
_____________________________________
____________________
Tandatangan pemberi maklumat
Tarikh
P.U. (A) 288 26
BORANG 4
[Subperaturan 4(2) dan (3)]
PEMBERITAHUAN MAKLUMAT KOREKAN
Jabatan Mineral dan Geosains
Malaysia
20th Floor, Tabung Haji Building,
Jalan Tun Razak,
Tel: 603-21611033
Faks: 603-21611036
Laman web: www.jmg.gov.my
Semua bahagian dalam pemberitahuan ini hendaklah diisi dan mudah dibaca
1.0
Maklumat pemberi maklumat
Untuk diisi jika pemberitahuan ini dibuat oleh individu
Nama penuh:
pasport :
Alamat yang boleh dihubungi:
No. tel.:
No.tel. bimbit:
No. faks:
Alamat e-mel:
Untuk diisi jika permohonan ini dibuat bagi pihak syarikat/organisasi
Nama syarikat/organisasi :
No. pendaftaran syarikat:
No. lesen perdagangan:
Aktiviti utama syarikat:
Untuk kegunaan pejabat sahaja
No. pemberitahuan
Tarikh terima
No. ruj. telaga
P.U. (A) 288 27
Butir-butir wakil syarikat
Nama penuh:
No. K.P./No. pasport :
Jawatan:
Alamat yang boleh dihubungi:
No. tel.:
No. tel. bimbit:
No. Faks
Alamat e-mel:
2.0
Kaedah korekan
Gerek
Gerudi
Gali
Lelubang
Syaf
Terowong
Tarahan
Lain-lain (sila nyatakan)
3.0
Tujuan korekan
___________________________________________________________________________________ (sila nyatakan)
4.0
Beban atas
Ketebalan beban atas (m) : ___________________
Perincian bahan-bahan beban atas: ________________________________________________________
P.U. (A) 288 28
5.0
Jenis batu hampar
Batuan sedimen
Batuan metamorf
Batuan igneus
Lain-lain (sila nyatakan)
Sila nyatakan jenis batuan dengan terperinci
6.0
Butir-butir lokasi
Rujukan peta : __________________ Utaraan _________________ Timuran
Lokasi:
Alamat: __________________________________________________________________________
No. Lot : _________________________________________________________________________________________
Mukim: ____________ Daerah: _________________ Bahagian: ____________________
Negeri: ___________________________________________________________
(Sila lampirkan peta yang menunjukkan lokasi sebenar)
Terangkan semua pola saliran permukaan termasuk tanah bencah dan air pegun (dalam lingkungan 500m): ______________________________________________________________________________
_____________________________________________________________________________________________________
P.U. (A) 288 29
Topografi kawasan: ___________________________________________________________________________
Aktiviti guna tanah (dalam lingkungan 500m):________________________________________________
Badan air permukaan berhampiran (m): _________________________________________________
Jarak dari korekan-korekan sedia ada (m): _________________
Dimensi kawasan korekan (panjang x lebar x dalam) (m): ______________________________
(Sila lampirkan pelan tapak dan/atau pelan susun atur)
7.0
Butir-butir syarikat
Nama syarikat: __________________________ No. pendaftaran syarikat:____________________
(Sila lampirkan satu salinan perakuan pendaftaran)
8.0
Butir-butir pemilik tanah
Nama : ________________________________________________________
No. K.P.: ________________________
Alamat: _________________________________________________________________________________________
__________________________________________________________________________________________________
No. tel.: ________________________ No. faks: _____________________
Status tanah: __________________________
Kebenaran diberi:
Ya
Tidak
Saya memperakui bahawa maklumat yang diberikan adalah benar dan tepat sepanjang pengetahuan saya.
_____________________________________
____________________
Tandatangan pemberi maklumat
Tarikh
P.U. (A) 288 30
Dibuat 24 Julai 2013
[NRE (S) 604-5/5; PN(PU2)681]
DATUK SERI PALANIVEL A/L GOVINDASAMY
Menteri Sumber Asli dan Alam Sekitar
P.U. (A) 288 31
GEOLOGICAL SURVEY ACT 1974
GEOLOGICAL SURVEY (NOTIFICATION OF DEVELOPMENT OF WELLS AND
EXCAVATIONS) REGULATIONS 2013
IN exercise of the powers conferred by sections 13, 14 and 22 of the Geological Survey
Act 1974 [Act 129], the Minister makes the following regulations:
Citation 1.
These regulations may be cited as the Geological Survey (Notification of
Development of Wells and Excavations) Regulations 2013.
Interpretation 2.
In these Regulations, unless the context otherwise requires—
“water” means water found beneath the surface of the earth including spring and geothermal sources;
“excavation” means an act or process to penetrate the surface, subsurface or removal content of the earth manually or mechanically using machinery or equipment;
“pit” means a small indentation or depression;
“hole” means an opening or cavity or hollow space in the surface or subsurface of the earth;
“search” means the activity of looking for, discovering, investigation and exploring of water;
“dig” means a process to create an opening in the surface or subsurface of the earth;
P.U. (A) 288 32
“bore” means a process to cut, drill or blast, for the purpose of creating an opening at the surface or subsurface of the earth;
“drill” means a process to penetrate surface of the earth, soil or rock using machinery or equipment;
“extraction” means a process that removes any material from the content of the earth;
“shaft” means any vertical or inclined opening in the subsurface of the earth;
“cutting” means a process of removal or separation of material from the surface or subsurface that exposes the bedrock;
“well” means any hole with or without lining or structure that is used for searching, monitoring, sampling and groundwater abstraction and include that is used for recharging groundwater;
“tunnel” means an elongated or narrow excavated underground or underwater opening or passage that is linear with a length that exceeds its width or height.
Notification of well development 3.
(1)
Any person who intends to bore, drill, dig or otherwise develop a well for the purpose of searching for or extracting water therefrom shall notify the Director
General of such details as specified in Form 1 of the Schedule within fourteen working days before the proposed activity is carried out.
(2)
Any person who has bored, drilled, dug or otherwise developed a well for the purpose of searching for or extracting water therefrom shall notify the Director
General of such details as specified in Form 2 of the Schedule within fourteen working days after the carrying out of the activity.
P.U. (A) 288 33
(3)
Any person who bored, drilled, dug or otherwise developed a well for the purpose of searching for or extracting water therefrom before the date of coming into operation of these Regulations shall notify the Director General of such details as specified in Form 2 of the Schedule within six months from the date of coming into operation of these Regulations.
Notification of excavation 4.
(1)
Any person who intends to bore, drill, dig or otherwise develop a hole, pit, shaft, tunnel, cutting or other excavation which exposes the bedrock, shall notify the
Director General of such details as specified in Form 3 of the Schedule within fourteen working days before the proposed activity is carried out.
(2)
Any person who has bored, drilled, dug or otherwise developed a hole, pit, shaft, tunnel, cutting or other excavation which exposes the bedrock, shall notify the
Director General of such details as specified in Form 4 of the Schedule within fourteen working days after the carrying out of the activity.
(3)
Any person who has bored, drilled, dug or otherwise developed a hole, pit, shaft, tunnel, cutting or other excavation which exposes the bedrock before the date of coming into operation of these Regulations shall notify the Director General of such details as specified in Form 4 of the Schedule within six months from the date of coming into operation of these Regulations.
P.U. (A) 288 34
SCHEDULE
FORM 1
[Subregulation 3(1)]
NOTIFICATION FOR WELL DEVELOPMENT
Jabatan Mineral dan Geosains
Malaysia
20th Floor, Tabung Haji Building,
Jalan Tun Razak,
50658 KUALA LUMPUR
Tel. No.: 603-21611033
Fax No.: 603-21611036
Website: www.jmg.gov.my
All sections of this notification should be filled in and legible 1.0
Informer’s information
To be filled if notification is made by an individual
Full name:
I.C. no. /Passport no.:
Contact address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
To be filled if notification is made on behalf of a company/organization
Name of company/organization:
Company registration no.:
Trading license no.:
Company main activity:
Details of company representative
Full name:
I.C. no. /Passport no.:
Designation:
Contact address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
For office use only
Notification no.:
Date received:
Well ref. no.:
P.U. (A) 288 35
2.0
Type of work
Bore hole drilling
Well construction
Well modification
Well rehabilitation
Well closure
Others
(please specify)
3.0
Proposed usage of well
Domestic
Agriculture
Industry
Aquaculture
Monitoring
Others
(please specify)
4.0
Proposed drilling method(s)
Rotary
Percussion
Others (please specify)
5.0
Proposed type of drilling mud used
Bentonite
Polymer
Others (please specify)
6.0
Details of well
Proposed abstraction rate (in m3/day):
Map reference:
Northing
Easting
Location: _________________________________________________________________________________________
Address: _________________________________________________________________________________________
P.U. (A) 288 36
Lot No.: _________________________________________________________________________________________
Mukim: ________________________ District: ______________________ Division: ____________________
State: ____________________________________________________________________________________________
(Please attach map showing the proposed location of bore hole/well/existing well)
Details of proposed bore hole/well:
Proposed depth of well (m): ___________________ Diameter of well (mm): ____________________
Details of proposed well to be modified/rehabilitated:
Depth of well (m):
__________________ Proposed new depth of well (m): __________________
Diameter of well (mm): _______________ Proposed new diameter of well (mm): ______________
Method used for well rehabilitation: _________________________________________________________
Chemical used for well rehabilitation: _________________________________________________________
Details of well closure:
Method used for well closure: __________________________________________________________
Material used for well closure: __________________________________________________________
Type of aquifer:
Alluvium/Soil
Hardrock
Proposed materials used for well construction:
PVC
Galvanised iron
Stainless steel
Others
(please specify)
P.U. (A) 288 37
7.0 Details of drilling company and licensed driller
Name of drilling company: _______________________ Company registration no.:________________
Name of driller: ____________________________________ License no.: _______________________________
(Please attach a copy of the company registration certificate)
8.0 Particulars of land owner
Name: __________________________________________________ I.C no.: _________________________________
Address: __________________________________________________________________________________________
_____________________________________________________________________________________________________
Telephone no.: ________________________ Fax. no.: _____________________
Status of land: __________________________
Consent given:
Yes No
9.0 Additional information
Land use activity (within 500m radius):_______________________________________________________
Nearest surface water body (m): _______________________________
Distance from existing well(s) (m): ____________________________
I certify that the information provided is true and correct to the best of my knowledge.
____________________________
____________________
Signature of informer
Date
P.U. (A) 288 38
FORM 2
[Subregulations 3(2) and (3)]
NOTIFICATION OF WELL INFORMATION
Jabatan Mineral dan Geosains
Malaysia
20th Floor, Tabung Haji Building,
Jalan Tun Razak,
Tel. No.: 603-21611033
Fax: 603-21611036
Website: www.jmg.gov.my
All sections of this notification should be filled in and legible 1.0
Informer’s information
To be filled if notification is made by an individual
Full name:
I.C. no./
Passport no.:
Contact address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
To be filled if notification is made on behalf of a company/organization
Name of company/organization:
Company registration no.:
Trading license no.:
Company main activity:
For office use only
Notification no.
Date received
Well ref. no.
P.U. (A) 288 39
Details of company representative
Full name:
I.C. no./Passport no.:
Designation:
Contact Address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
2.0
Details of well location
3.0
Well usage
Domestic
Agriculture
Industry
Aquaculture
Monitoring
Others (please specify)
Map reference:
___________________ Northing __________________ Easting
Location:
Address: _______________________________________________________________________
Lot No.:
_____________________________________________________________________________________
Mukim : ______________________ District: _______________________ Division: ______________________
(Please attach map showing the location of bore hole/well)
State: _________________________________________
P.U. (A) 288 40
4.0
Well data
Date of well completed: _______________________ (dd/mm/yy)
Aquifer type: unconfined/confined/semi-confined
Ground elevation:
___________ m (mean sea level)
Static water level: __________ m (below ground level) or _______________ m (mean sea level)
Date of measurement: ____________
Geological log and well design: _______________________________
(Please provide a lithological log using Appendix A, include a copy of the down hole geophysical log, if any)
Well and aquifer characteristics: (to be filled if applicable)
Well discharge (m3/h): __________________
Specific capacity (m2/h): __________________
Well efficiency (%): __________________
Storativity/specific yield: __________________
Transmissivity (m2/h): __________________
(Please provide information on the pumping test using Appendices B, C and D. Include a copy of the analysis on the pumping tests)
Groundwater quality: (to be filled if applicable)
Date of sampling:
___________________ (dd/mm/yy)
Date of analysis:
___________________ (dd/mm/ yy)
Conductivity: ____________ µS/cm pH: _________
Chloride: __________ mg/L
Dissolved oxygen: __________ mg/L
Total dissolved solid: __________ mg/L
Total iron: __________ mg/L
Total alkalinity: __________ mg/L Bacteria (E-coli): __________ CPU/100mL
(Please include a copy of the complete laboratory report)
P.U. (A) 288 41
I certify that the information provided is true and correct to the best of my knowledge.
________________________
____________________
Signature of informer
Date
P.U. (A) 288 42
APPENDIX A
GEOLOGICAL LOG AND WELL DESIGN
PROJECT :
PROJECT NO. : DRILLING METHOD :
WELL NO. : (1) Depth:
Method:
START DATE & TIME
:
LOCATION : (2) Depth:
Method:
COMP. DATE & TIME :
Depth:
Method:
OWNER :
TOTAL DEPTH :
m
DRILLING COMPANY :
COLLAR HEIGHT: m
DRILLER :
COORDINATE : N E: STATIC WATER LEVEL: m (b.g.l)
ELEVATION : m (m.s.l.) DATE OF MEASUREMENT: DRILLER RIG :
DEPTH
(m)
GRAPHIC
LITHOLOGY
WATER SIGN
(m3/jam)
PENETRATION
RATE
GEOPHYSICAL
LOGGING
DESCRIPTION
(Colors, texture, structure, rock/soil etc…)
REMARKS
WELL DESIGN
WELL COMPLETION :
Well depth :………………………. (m)
Screen type :………………………. Logged by: …………………………………………………… Certified by : ………………………………………………..
Casing type :………………………. Designation : ……………………………………………… Designation : …………………………………………….…
Estimated yield:………………… (m3/h) Date : …………………………………………………… Date : ……………………………………………….
Note: m.s.l. – mean sea level b.g.l. – below ground level
P.U. (A) 288 43
APPENDIX B
STEP DRAWDOWN PUMPING TEST RECORD
Well no.:
……………….
Commencement of pumping:
Well depth:
………………. m
Time:
………………
Screen interval:
………………. m
Date:
………………
Well type:
……………….
End of pumping:
Distance from pumping well: ………………. m
Time:
……………….
Collar height:
………………. m
Date:
……………….
Reduced ground level:
………………. m (m.s.l.)
Static water level:
………………. m (b.g.l.)
Recorded by:
...........................................
Pumping rate:
……………… m3/hr
Certified by registered geologist:
…………………………….
Depth of pump:
………………. m
Date:
…………………….……….
Type of pump:
………………. m
Note: m.s.l. – mean sea level b.g.l. – below ground level
P.U. (A) 288 44
Time from start of pumping
(min)
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Remarks
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Water
Level
(m)
Drawdown
(m)
Water Level
(m)
Drawdown
(m)
Water
Level
(m)
Drawdown
(m)
Water
Level
(m)
Drawdown
(m)
Water
Level
(m)
Drawdown
(m)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
P.U. (A) 288 45
Time from start of pumping
(min)
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Remarks
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Yield (Q) =
m3/hr
Water
Level
(m)
Drawdown
(m)
Water
Level
(m)
Drawdown
(m)
Water
Level
(m)
Drawdown
(m)
Water
Level
(m)
Drawdown
(m)
Water
Level
(m)
Drawdown
(m)
55.0
60.0
65.0
70.0
80.0
90.0
100.0
110.0
120.0
130.0
140.0
150.0
160.0
170.0
180.0
P.U. (A) 288 46
APPENDIX C
CONSTANT DISCHARGE PUMPING TEST RECORD
Well no.:
………………
Commencement of pumping:
Well depth:
……………… m
Time:
………………
Screen interval:
……………… m
Date:
………………
Well type:
………………
Distance from pumping well:
……………… m
End of pumping:
Collar height:
……………… m
Time:
……………….
Reduced ground level:
……………… m(m.s.l.)
Date:
……………….
Recorded by:
………………
Static water level:
……………… m (b.g.l.)
Pumping rate:
……………… m3/day
Certified by registered geologist:
………………
Depth of pump Type of um ……………… m
Date:
……………….
Type of pump:
………………
Date/
Time
Time from start of pumping
(min)
Water
Level
(m)
Drawdown
(m)
Remarks
Date/
Time
Time from start of pumping
(min)
Water level
(m)
Drawdown
(m)
Remarks
0.00
160.00
0.20
200.00
0.50
250.00
1.00
300.00
1.50
350.00
2.00
400.00
2.50
450.00
P.U. (A) 288 47
3.00
500.00
3.50
550.00
4.00
600.00
4.50
700.00
5.00
800.00
6.00
900.00
7.00
1000.00
8.00
1200.00
9.00
1400.00
10.00
1600.00
15.00
1800.00
20.00
2000.00
25.00
2250.00
30.00
2500.00
35.00
3000.00
40.00
3400.00
45.00
3800.00
50.00
4200.00
55.00
4600.00
60.00
5000.00
70.00
5500.00
80.00
6000.00
90.00
6500.00
100.00
7000.00
120.00
7500.00
Note: m.s.l. - mean sea level b.g.l. – below ground level
P.U. (A) 288 48
APPENDIX D
RECOVERY TEST RECORD
Well no.:
………………
Commencement of pumping:
Well depth:
……………… m
Time:
………………
Screen interval:
……………… m
Date:
………………
Well type:
………………
Distance from pumping well:
……………… m
End of pumping:
Collar height:
……………… m
Time:
……………….
Reduced ground level:
……………… m (m.s.l.)
Date:
……………….
Recorded by:
………………
Static water level
……………… m (b.g.l.)
Pumping rate:
……………… m3/day
Certified by registered geologist:
………………
Depth of pump Type o ……………… m
Date:
……………….
Type of pump:
……………….
Date/ Time from Time from
Water
Residual
Date/
Time from
Time from
Water
Residual
Time start of stop of t/t` level
Drawdown
Time start of stop of t/t` level
Drawdown pumping pumping
(m)
(m)
pumping pumping
(m)
(m)
(min)
(min)
(min)
(min)
0.00
70.00
0.50
80.00
1.00
90.00
1.50
100.00
2.00
120.00
2.50
140.00
3.00
160.00
3.50
180.00
4.00
210.00
P.U. (A) 288 49
4.50
240.00
5.00
270.00
6.00
300.00
7.00
360.00
8.00
420.00
9.00
480.00
10.00
540.00
15.00
600.00
20.00
660.00
25.00
720.00
30.00
780.00
35.00
840.00
40.00
900.00
45.00
960.00
50.00
1020.00
55.00
1080.00
60.00
1140.00
Note: m.s.l. - mean sea level b.g.l. – below ground level
P.U. (A) 288 50
FORM 3
[Subregulation 4(1)]
NOTIFICATION FOR EXCAVATION
Jabatan Mineral dan Geosains
Malaysia
20th Floor, Tabung Haji Building,
Jalan Tun Razak,
Tel. No.: 603-21611033
Fax: 603-21611036
Website: www.jmg.gov.my
All sections of this notification should be filled in and legible
1.0
Informer’s information
To be filled if notification is made by an individual
Full name:
I.C. no. /Passport no.:
Contact address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
To be filled if notification is made on behalf of a company/organization
Name of company/organization:
Company registration no.:
Trading license no.:
Company main activity:
For office use only
Notification no.
Date received
Well ref. no.
P.U. (A) 288 51
Details of company representative
Full name:
I.C. no./Passport no.:
Designation:
Contact address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
2.0
Proposed excavation method(s)
Bore
Drill
Dig
Pit
Shaft
Tunnel
Cutting
Others (please specify)
3.0
Purpose of excavation
___________________________________________________________________________________(please specify)
4.0
Details of location
Map reference: ____________________ Northing
_____________________ Easting
Location:
Address:
____________________________________________________________________
Lot No.: _________________________________________________________________________________________
Mukim : ______________________ District:
___________________ Division: ______________________
P.U. (A) 288 52
(Please attach key map showing the exact location)
Land use activity (within 500m radius):
_________________________________________________
Nearest surface water body (m): _________________________________________________
Distance from existing excavation(s) (m): _________________
Proposed depth of excavation (m): _________________
Proposed dimension of excavation (length x width x depth) (m): _____________
5.0
Details of contractor
Name of the contractor: ________________________ Company registration no.:__________________
(Please attach a copy of the registration certificate)
6.0
Particulars of land owner
Name: _____________________________________________
I.C no./Pasport no.: ____________________
Address:___________________________________________________________________________________________
___________________________________________________________________________________________
Telephone no.: ________________________ Fax no.: _____________________
Status of land: __________________________
Consent given:
Yes No
(Please attach consent letter from owner of property and layout plan to show the proposed well location)
I certify that the information provided is true and correct to the best of my knowledge.
__________________________
_______________
Signature of informer
Date
State: _____________________________________
P.U. (A) 288 53
FORM 4
[Subregulations 4(2) and (3)]
NOTIFICATION OF EXCAVATION INFORMATION
Jabatan Mineral dan Geosains
Malaysia
20th Floor, Tabung Haji Building,
Jalan Tun Razak,
Tel. No.: 603-21611033
Fax: 603-21611036
Website: www.jmg.gov.my
All sections of this notification should be filled in and legible
1.0
Informer’s information
To be filled if notification is made by an individual
Full name:
I.C. no./Passport no.:
Contact address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
To be filled if notification is made on behalf of a company/organization
Name of company/organization:
Company registration no.:
Trading license no.:
Company main activity:
For office use only
Notification no.
Date received
Well ref. no.:
P.U. (A) 288 54
Details of company representative
Full name:
I.C. no./Passport no.:
Designation:
Contact address:
Tel. no.:
Mobile no.:
Fax no.:
E-mail address:
2.0
Excavation method(s)
Bore
Drill
Dig
Pit
Shaft
Tunnel
Cutting
Others (please specify)
3.0
Purpose of excavation_____________________________________________________________________
____________________________________________________________________________________ (please specify)
4.0
Overburden__________________________________________________________________________________
Overburden thickness (m): ___________________
Detail of overburden materials: ____________________________________________________________________
P.U. (A) 288 55
5.0
Bedrock type
Sedimentary rock
Metamorphic rock
Igneous rock
Others (please specify)
Please specify type of the rock in detail
6.0
Details of location
(Please attach map showing the exact location)
Describe all surface drainage patterns including wetlands and standing water (within 500 m radius): ______________________________________________________________________________________
________________________________________________________________________________________________________
Topography of the area: ________________________________________________________________________
Map reference: _____________________ Northing __________________________ Easting
Location:
Address: _____________________________________________________________________________
Lot No.: __________________________________________________________________________________________
Mukim: ________________________ District: _________________________ Division: ____________________
State: _____________________________
P.U. (A) 288 56
Land use activity (within 500m radius) ________________________________________________________
Nearest surface water body (m): ________________________________________________________________
Distance from existing excavation(s) (m): ________________________________________________________
Dimension of excavated area (length x width x depth) (m): _______________________
(Please attach site plan and/or layout plan)
7.0
Details of company
Name of company: __________________________ Company registration no.: __________________________
(Please attach a copy of the registration certificate)
8.0
Particulars of land owner
Name: ________________________________________________________
I.C. no.: ________________________
Address:
________________________________________________________________________________________
__________________________________________________________________________________________
Telephone no.: ________________________ Fax no.: _____________________
Status of land: __________________________
Consent given:
Yes
No
I certify that the information provided is true and correct to the best of my knowledge.
_________________________
_______________
Signature of informer
Date
Made 24 July 2013
[NRE (S) 604-5/5; PN(PU2)681]
DATUK SERI PALANIVEL A/L GOVINDASAMY
Minister of Natural Resources and Environment