Seksyen 1
(1)
Peraturan-peraturan ini bolehlah dinamakan Peraturan-Peraturan
Perkhidmatan Bomba (Fi Tugas Khas) 2021.
/akn/my/act/pua/2021/463
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 is Malaysia P.U. (A), cited as P.U. (A) 463 2021, currently marked in force and first recorded in 2021.
Opening note
Peraturan-peraturan ini bolehlah dinamakan Peraturan-Peraturan
Perkhidmatan Bomba (Fi Tugas Khas) 2021.
Fi yang ditetapkan dalam ruang (2) Jadual hendaklah dibayar bagi tugas khas yang dinyatakan dalam ruang (1).
Penepian fi
Ketua Pengarah boleh, menurut budi bicaranya, dalam mana-mana hal tertentu, mengenepikan keseluruhan atau sebahagian daripada mana-mana fi yang dinyatakan dalam Jadual.
Pembatalan
Perintah Bayaran (Perkhidmatan Bomba) 1977 [P.U. (A) 207/1977] dibatalkan.
Kecualian dan peralihan
Apa-apa permohonan bagi tugas khas atau pemeriksaan kedua yang dibuat dan belum selesai di bawah Perintah Bayaran (Perkhidmatan Bomba) 1977
(“Perintah yang dibatalkan”) hendaklah, pada tarikh permulaan kuat kuasa
Peraturan-Peraturan ini, diuruskan di bawah Perintah yang dibatalkan seolah-olah
Perintah yang dibatalkan itu tidak dibatalkan oleh Peraturan-Peraturan ini.
P.U. (A) 463 3
JADUAL
[Peraturan 2]
(1)
Tugas Khas
(2)
1.
PEMERIKSAAN BANGUNAN
bagi pemeriksaan pertama 100.00
bagi pemeriksaan berikutnya 200.00 2.
PEMERIKSAAN DAN PENGUJIAN KELENGKAPAN MENENTANG KEBAKARAN
ATAU PEPASANGAN KESELAMATAN KEBAKARAN
Sistem pancur kering 100.00 bagi setiap stack
Sistem pancur basah
bagi setiap set pam
bagi setiap stack
150.00 100.00
Pili bomba 100.00 bagi setiap unit
Sistem pili bomba bertekanan
bagi setiap set pam
bagi setiap unit pili bomba
150.00 100.00
Fixed water monitor
bagi setiap set pam
bagi setiap unit monitor
150.00 10.00
P.U. (A) 463 4
(1)
Tugas Khas
(2)
Sistem gelung hos
bagi setiap set pam
bagi setiap unit gelung hos
50.00 10.00
Sistem sembur automatik
bagi setiap set pam
bagi setiap kepala sembur
150.00 2.00
Sistem sembur air
bagi setiap set pam
bagi setiap kepala sembur air
150.00 2.00
Sistem busa
bagi setiap set pam
bagi setiap kepala nozel
150.00 2.00
Sistem gas 150.00 bagi setiap sistem
Sistem pemadam api automatik yang lain 150.00 bagi setiap sistem
Sistem kawalan asap 100.00 bagi setiap sistem
Sistem bertekanan 100.00 bagi setiap sistem
Sistem pengesan api automatik
bagi setiap unit
bagi setiap sistem
5.00 100.00
P.U. (A) 463 5
(1)
Tugas Khas
(2)
Manual call point
bagi setiap unit
bagi setiap sistem
5.00 100.00
Sistem interkom bomba 5.00 bagi setiap unit
Sistem siar raya 50.00 bagi setiap sistem
Suis pengasingan elektrik 5.00 bagi setiap unit
Sesekat api 10.00 bagi setiap unit
Lif bomba 100.00 bagi setiap unit
Lif katil pelepasan kebakaran 100.00 bagi setiap unit
Lif penumpang 50.00 bagi setiap unit
Pintu api 5.00 bagi setiap unit
Panel penggera kebakaran utama 50.00 bagi setiap unit
Sistem bekalan kuasa kecemasan 20.00 bagi setiap unit
Pengatup kebakaran 10.00 bagi setiap unit
Lampu kecemasan 2.00 bagi setiap unit
Lampu tanda keluar kecemasan 2.00 bagi setiap unit
Pemadam api mudah alih 10.00 bagi setiap unit
Pemadam api jenis troli 10.00 bagi setiap unit
P.U. (A) 463 6
(1)
Tugas Khas
(2)
Saluran tahan api 1.00 per m3
Tirai asap 5.00 bagi setiap unit
Pintu pelantar lif tahan api 5.00 bagi setiap unit
Sistem salutan dinding luar 100.00 bagi setiap sistem
Tangga terlindung/Tangga menentang kebakaran 100.00 bagi setiap lubong 3.
KELENGKAPAN PENGUJIAN PRODUK KESELAMATAN KEBAKARAN
Relau pengujian ketahanan api
1 jam
2 jam
3 jam
4 jam
3,490.00 4,450.00 5,300.00 6,040.00
Fire suppression testing chamber
Kelas A
Kelas B
PVC Rib
Cold Dis
1,430.00 1,430.00 1,430.00 1,430.00
Cone calorimeter 1,250.00 bagi setiap ujian/sampel
P.U. (A) 463 7
(1)
Tugas Khas
(2)
Room corner test 2,110.00 bagi setiap ujian/sampel
Ujian fabrik
Ujian komposisi fabrik
Ujian kekuatan tegangan fabrik
Ujian kekuatan koyakan fabrik
Ujian kiraan benang
Ujian koordinat warna
Ujian tenunan
Ujian lelasan
Ujian jisim kawasan per unit
Ujian ketahanan warna terhadap cucian
Ujian ketahanan warna terhadap perpeluhan
Ujian ketahanan warna terhadap gosokan
Ujian ketahanan warna terhadap air
Ujian kelebaran fabrik
Ujian perubahan dimensi
Ujian kemudahbakaran fabrik
600.00 240.00 240.00 160.00 120.00 110.00 320.00 130.00 150.00 160.00
140.00
160.00 90.00 230.00 320.00
P.U. (A) 463 8
(1)
Tugas Khas
(2)
Ujian fabrik kalis air 230.00 4.
PENGGUNAAN KELENGKAPAN MAKMAL PENYIASATAN KEBAKARAN
Gas Chromatography (GC)-MS
bagi suntikan pertama
bagi suntikan berikutnya
180.00 100.00
Inductively Coupled Plasma (ICP-OES)
bagi suntikan pertama
bagi suntikan berikutnya
100.00 50.00
Fourier Transform Spectroscopy (FTIR)
120.00 bagi setiap sampel
Thermo-Gravimetric Analysis (TGA)
jam pertama bagi setiap sampel
jam berikutnya bagi setiap sampel
100.00 50.00
Thermo Mechanical Analyzer (TMA)
jam pertama bagi setiap sampel
jam berikutnya bagi setiap sampel
120.00 60.00
UV-Visible Spectrophotometer (UV-Vis)
80.00 bagi setiap sampel
Differential Scanning Calorimeter (DSC)
jam pertama bagi setiap sampel
jam berikutnya bagi setiap sampel
100.00 50.00
P.U. (A) 463 9
(1)
Tugas Khas
(2)
High Performance Liquid Chromatography (HPLC)
UV/RI Detector
bagi suntikan pertama
bagi suntikan berikutnya
100.00 50.00 5.
PENGGUNAAN KENDERAAN JABATAN BOMBA DAN PENYELAMAT BAGI
TUJUAN LUAR KECEMASAN
Apa-apa jentera pemadaman dan penyelamatan melebihi 18 tan
bagi jam pertama
bagi setiap jam berikutnya
bagi setiap kilometer (km)
(atas dasar harian)
1,400.00 55.00 6.00
Apa-apa jentera pemadaman dan penyelamatan antara 10 hingga 18 tan
bagi jam pertama
bagi setiap jam berikutnya
bagi setiap kilometer (km)
(atas dasar harian)
650.00 45.00 4.00
P.U. (A) 463 10
(1)
Tugas Khas
(2)
Apa-apa jentera pemadaman dan penyelamatan di bawah 10 tan
bagi jam pertama
bagi setiap jam berikutnya
bagi setiap kilometer (km)
(atas dasar harian)
380.00 40.00 3.00
Selain jentera pemadaman dan penyelamatan
Melebihi 3 tan
bagi jam pertama
bagi setiap jam berikutnya
bagi setiap kilometer (km)
160.00 15.00 2.00
Di bawah 3 tan
bagi jam pertama
bagi setiap jam berikutnya
bagi setiap kilometer (km)
60.00 10.00 1.00
Pengangkutan air
Apa-apa vesel melebihi 100 hp
bagi jam pertama
bagi setiap jam berikutnya
500.00 150.00
P.U. (A) 463 11
(1)
Tugas Khas
(2)
Apa-apa vesel di bawah 100 hp
bagi jam pertama
bagi setiap jam berikutnya
80.00 75.00
Pengangkutan udara
Pesawat udara besar
10,000 kg – 13,999 kg 17,300.00 setiap jam 2,328.00 setiap jam bagi penggunaan bahan api 582.00 setiap jam bagi penggunaan minyak 6,000 kg – 9,999 kg 11,800.00 setiap jam 1,455.00 setiap jam bagi penggunaan bahan api 363.00 setiap jam bagi penggunaan minyak
Pesawat udara kecil
5,999 kg dan ke bawah 10,700.00 setiap jam 728.00 setiap jam bagi penggunaan bahan api 182.00 setiap jam bagi penggunaan minyak
P.U. (A) 463 12
(1)
Tugas Khas
(2)
6.
PERKHIDMATAN LAIN
Personel bomba
Penguasa Bomba
Penolong Penguasa Bomba
Pegawai Bomba
45.00 setiap jam 35.00 setiap jam 16.00 setiap jam
Salinan laporan kebakaran 100.00 setiap salinan
Perakuan pemadam api mudah alih 5.00 setiap unit
Dibuat 26 November 2021
[KPKT/PUU(S)/8/05; PN(PU2)471/Jld. 7]
DATO' SRI REEZAL MERICAN BIN NAINA MERICAN
Menteri Perumahan dan Kerajaan Tempatan
P.U. (A) 463 13
FIRE SERVICES ACT 1988
FIRE SERVICES (SPECIAL DUTY FEES)
REGULATIONS 2021
IN exercise of the powers conferred by paragraph 62(1)(l)
of the
Fire Services Act 1988 [Act 341], the Minister makes the following regulations:
Citation and commencement 1.
(1)
These regulations may be cited as the Fire Services (Special Duty Fees)
Regulations 2021.
(2)
These Regulations come into operation on 1 January 2022.
Fees 2.
The fees prescribed in column (2) of the Schedule shall be paid for the special duty specified in column (1).
Waiver of fees 3.
The Director General may, in his discretion, in any particular case, waive wholly or in part any fee specified in the Schedule.
Revocation 4.
The Fees (Fire Services) Order 1977 [P.U. (A) 207/1977] is revoked.
Saving and transitional 5.
Any application for a special duty or second inspection made and pending under the Fees (Fire Services) Order 1977 (“the revoked Order”) shall, on the date of coming into operation of these Regulations, be dealt with under the revoked Order as if the revoked Order had not been revoked by these Regulations.
P.U. (A) 463 14
[Regulation 2]
(1)
Special Duty
(2)
Fee
1.
INSPECTION OF PREMISES
for the first inspection 100.00
for the subsequent inspection 200.00 2.
INSPECTION AND TESTING OF FIRE-FIGHTING EQUIPMENT OR FIRE SAFETY
INSTALLATION
Dry riser system 100.00 for each stack
Wet riser system
for each pump set
for each stack
150.00 100.00
Fire hydrant 100.00 for each unit
Pressurised fire hydrant system
for each pump set
for each unit of fire hydrant
150.00 100.00
Fixed water monitor
for each pump set
for each unit of monitor
150.00 10.00
P.U. (A) 463 15
(1)
Special Duty
(2)
Fee
Hose reel system
for each pump set
for each unit of hose reel
50.00 10.00
Automatic sprinkler system
for each pump set
for each sprinkler head
150.00 2.00
Water spray system
for each pump set
for each head of water spray
150.00 2.00
Foam system
for each pump set
for each nozzle head
150.00 2.00
Gaseous system 150.00 for each system
Other automatic fire extinguishing system 150.00 for each system
Smoke control system 100.00 for each system
Pressurization system 100.00 for each system
P.U. (A) 463 16
(1)
Special Duty
(2)
Fee
Automatic fire detection system
for each unit
for each system
5.00 100.00
Manual call point
for each unit
for each system
5.00 100.00
Firemen intercom system 5.00 for each unit
Public address system 50.00 for each system
Electrical isolation switch 5.00 for each unit
Fire damper 10.00 for each unit
Fire lift 100.00 for each unit
Fire escape bed lift 100.00 for each unit
Passenger lift 50.00 for each unit
Fire door 5.00 for each unit
Main fire alarm panel 50.00 for each unit
Emergency power system 20.00 for each unit
Fire roller shutter 10.00 for each unit
Emergency light 2.00 for each unit
P.U. (A) 463 17
(1)
Special Duty
(2)
Fee
Emergency exit sign light 2.00 for each unit
Portable fire extinguisher 10.00 for each unit
Trolley type fire extinguisher 10.00 for each unit
Fire rated duct 1.00 per m3
Smoke curtain 5.00 for each unit
Fire rated lift landing door 5.00 for each unit
External wall cladding system 100.00 for each system
Protected staircase/Fire-fighting staircase 100.00 for each shaft 3.
FIRE SAFETY PRODUCT TESTING EQUIPMENT
Fire resistance testing furnace
1 hour
2 hour
3 hour
4 hour
3,490.00 4,450.00 5,300.00 6,040.00
Fire suppression testing chamber
Class A
Class B
PVC Rib
Cold Dis
1,430.00 1,430.00 1,430.00 1,430.00
P.U. (A) 463 18
(1)
Special Duty
(2)
Fee
Cone calorimeter 1,250.00 per test/sample
Room corner test 2,110.00 per test/sample
Fabric test
Fabric composition test
Fabric tensile strength test
Fabric tearing strength test
Thread count test
Colour coordinate test
Weave test
Abrasion test
Mass per unit area test
Colour fastness to washing test
Colour fastness to perspiration test
Colour fastness to rubbing test
Colour fastness to water test
Fabric width test
Dimensional change test
Fabric flammability test
Fabric water repellent test
600.00 240.00 240.00 160.00 120.00 110.00 320.00 130.00 150.00 160.00 140.00 160.00 90.00 230.00 320.00 230.00
P.U. (A) 463 19
(1)
Special Duty
(2)
Fee
4.
UTILIZATION OF FIRE INVESTIGATION LABORATORY EQUIPMENT
Gas Chromatography (GC)-MS
for the first injection
for the subsequent injection
180.00 100.00
Inductively Coupled Plasma (ICP-OES)
for the first injection
for the subsequent injection
100.00 50.00
Fourier Transform Spectroscopy (FTIR)
120.00 for each sample
Thermo-Gravimetric Analysis (TGA)
first hour for each sample
subsequent hour for each sample
100.00 50.00
Thermo Mechanical Analyzer (TMA)
first hour for each sample
subsequent hour for each sample
120.00 60.00
UV-Visible Spectrophotometer (UV-Vis)
80.00 for each sample
Differential Scanning Calorimeter (DSC)
first hour for each sample
subsequent hour for each sample
100.00 50.00
P.U. (A) 463 20
(1)
Special Duty
(2)
Fee
High Performance Liquid Chromatography (HPLC)
UV/RI Detector
for the first injection
for the subsequent injection
100.00 50.00 5.
THE USAGE OF VEHICLES OF THE FIRE AND RESCUE DEPARTMENT FOR
NON EMERGENCY PURPOSES
Any fire and rescue tender above 18 tonne
for first hour
for each subsequent hour
for each kilometre (km)
(on daily basis)
1,400.00 55.00 6.00
Any fire and rescue tender between 10 tonne to 18 tonne
for the first hour
for each subsequent hour
for each kilometre (km)
(on daily basis)
650.00 45.00 4.00
P.U. (A) 463 21
(1)
Special Duty
(2)
Fee
Any fire and rescue tender below 10 tonne
for the first hour
for each subsequent hour
for each kilometre (km)
(on daily basis)
380.00 40.00 3.00
Other than fire and rescue tender
Above 3 tonne
for the first hour
for each subsequent hour
for each kilometre (km)
160.00 15.00 2.00
Below 3 tonne
for the first hour
for each subsequent hour
for each kilometre (km)
60.00 10.00 1.00
Water transportation
Any vessel above 100 hp
for the first hour
for each subsequent hour
500.00 150.00
P.U. (A) 463 22
(1)
Special Duty
(2)
Fee
Any vessel below 100 hp
for the first hour
for each subsequent hour
80.00 75.00
Air transportation
Large aircraft
10,000 kg – 13,999 kg 17,300.00 per hour 2,328.00 per hour for fuel consumption 582.00 per hour for oil consumption 6,000 kg – 9,999 kg 11,800.00 per hour 1,455.00 per hour for fuel consumption 363.00 per hour for oil consumption
Small aircraft
5,999 kg and below 10,700.00 per hour 728.00 per hour for fuel consumption 182.00 per hour for oil consumption
P.U. (A) 463 23
(1)
Special Duty
(2)
Fee
6.
OTHER SERVICES
Fire personnel
Fire Superintendent
Assistant Fire Superintendent
Fire Officer
45.00 per hour 35.00 per hour 16.00 per hour
Copies of fire report 100.00 per copy
Certificate of portable fire extinguisher 5.00 per unit
Made 26 November 2021
[KPKT/PUU(S)/8/05; PN(PU2)471/Jld. 7]
DATO' SRI REEZAL MERICAN BIN NAINA MERICAN
Minister of Housing and Local Government