/akn/my/act/pua/2021/463

PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2021
Sections
7

Quick answer

About this p.u. (a)

PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 is Malaysia P.U. (A), cited as P.U. (A) 463 2021, currently marked in force and first recorded in 2021.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh perenggan 62(1)(l) Akta Perkhidmatan Bomba 1988 [Akta 341], Menteri membuat peraturan-peraturan yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Open as pageSuggest a correction

Fi yang ditetapkan dalam ruang (2) Jadual hendaklah dibayar bagi tugas khas yang dinyatakan dalam ruang (1).

Seksyen 3

Penepian fi

Open as pageSuggest a correction

Ketua Pengarah boleh, menurut budi bicaranya, dalam mana-mana hal tertentu, mengenepikan keseluruhan atau sebahagian daripada mana-mana fi yang dinyatakan dalam Jadual.

Seksyen 5

Kecualian dan peralihan

Open as pageSuggest a correction

Apa-apa permohonan bagi tugas khas atau pemeriksaan kedua yang dibuat dan belum selesai di bawah Perintah Bayaran (Perkhidmatan Bomba) 1977

(“Perintah yang dibatalkan”) hendaklah, pada tarikh permulaan kuat kuasa

Peraturan-Peraturan ini, diuruskan di bawah Perintah yang dibatalkan seolah-olah

Perintah yang dibatalkan itu tidak dibatalkan oleh Peraturan-Peraturan ini.

P.U. (A) 463 3

Jadual

Suggest a correction

JADUAL

[Peraturan 2]

(1)

Tugas Khas

(2)

1.

PEMERIKSAAN BANGUNAN

(a)

bagi pemeriksaan pertama 100.00

(b)

bagi pemeriksaan berikutnya 200.00 2.

PEMERIKSAAN DAN PENGUJIAN KELENGKAPAN MENENTANG KEBAKARAN

ATAU PEPASANGAN KESELAMATAN KEBAKARAN

Sistem pancur kering 100.00 bagi setiap stack

Sistem pancur basah

(a)

bagi setiap set pam

(b)

bagi setiap stack

150.00 100.00

Pili bomba 100.00 bagi setiap unit

Sistem pili bomba bertekanan

(a)

bagi setiap set pam

(b)

bagi setiap unit pili bomba

150.00 100.00

Fixed water monitor

(a)

bagi setiap set pam

(b)

bagi setiap unit monitor

150.00 10.00

P.U. (A) 463 4

(1)

Tugas Khas

(2)

Sistem gelung hos

(a)

bagi setiap set pam

(b)

bagi setiap unit gelung hos

50.00 10.00

Sistem sembur automatik

(a)

bagi setiap set pam

(b)

bagi setiap kepala sembur

150.00 2.00

Sistem sembur air

(a)

bagi setiap set pam

(b)

bagi setiap kepala sembur air

150.00 2.00

Sistem busa

(a)

bagi setiap set pam

(b)

bagi setiap kepala nozel

150.00 2.00

Sistem gas 150.00 bagi setiap sistem

Sistem pemadam api automatik yang lain 150.00 bagi setiap sistem

Sistem kawalan asap 100.00 bagi setiap sistem

Sistem bertekanan 100.00 bagi setiap sistem

Sistem pengesan api automatik

(a)

bagi setiap unit

(b)

bagi setiap sistem

5.00 100.00

P.U. (A) 463 5

(1)

Tugas Khas

(2)

Manual call point

(a)

bagi setiap unit

(b)

bagi setiap sistem

5.00 100.00

Sistem interkom bomba 5.00 bagi setiap unit

Sistem siar raya 50.00 bagi setiap sistem

Suis pengasingan elektrik 5.00 bagi setiap unit

Sesekat api 10.00 bagi setiap unit

Lif bomba 100.00 bagi setiap unit

Lif katil pelepasan kebakaran 100.00 bagi setiap unit

Lif penumpang 50.00 bagi setiap unit

Pintu api 5.00 bagi setiap unit

Panel penggera kebakaran utama 50.00 bagi setiap unit

Sistem bekalan kuasa kecemasan 20.00 bagi setiap unit

Pengatup kebakaran 10.00 bagi setiap unit

Lampu kecemasan 2.00 bagi setiap unit

Lampu tanda keluar kecemasan 2.00 bagi setiap unit

Pemadam api mudah alih 10.00 bagi setiap unit

Pemadam api jenis troli 10.00 bagi setiap unit

P.U. (A) 463 6

(1)

Tugas Khas

(2)

Saluran tahan api 1.00 per m3

Tirai asap 5.00 bagi setiap unit

Pintu pelantar lif tahan api 5.00 bagi setiap unit

Sistem salutan dinding luar 100.00 bagi setiap sistem

Tangga terlindung/Tangga menentang kebakaran 100.00 bagi setiap lubong 3.

KELENGKAPAN PENGUJIAN PRODUK KESELAMATAN KEBAKARAN

Relau pengujian ketahanan api

(a)

1 jam

(b)

2 jam

(c)

3 jam

(d)

4 jam

3,490.00 4,450.00 5,300.00 6,040.00

Fire suppression testing chamber

(a)

Kelas A

(b)

Kelas B

(c)

PVC Rib

(d)

Cold Dis

1,430.00 1,430.00 1,430.00 1,430.00

Cone calorimeter 1,250.00 bagi setiap ujian/sampel

P.U. (A) 463 7

(1)

Tugas Khas

(2)

Room corner test 2,110.00 bagi setiap ujian/sampel

Ujian fabrik

(a)

Ujian komposisi fabrik

(b)

Ujian kekuatan tegangan fabrik

(c)

Ujian kekuatan koyakan fabrik

(d)

Ujian kiraan benang

(e)

Ujian koordinat warna

(f)

Ujian tenunan

(g)

Ujian lelasan

(h)

Ujian jisim kawasan per unit

(i)

Ujian ketahanan warna terhadap cucian

(j)

Ujian ketahanan warna terhadap perpeluhan

(k)

Ujian ketahanan warna terhadap gosokan

(l)

Ujian ketahanan warna terhadap air

(m)

Ujian kelebaran fabrik

(n)

Ujian perubahan dimensi

(o)

Ujian kemudahbakaran fabrik

600.00 240.00 240.00 160.00 120.00 110.00 320.00 130.00 150.00 160.00

140.00

160.00 90.00 230.00 320.00

P.U. (A) 463 8

(1)

Tugas Khas

(2)

(p)

Ujian fabrik kalis air 230.00 4.

PENGGUNAAN KELENGKAPAN MAKMAL PENYIASATAN KEBAKARAN

Gas Chromatography (GC)-MS

(a)

bagi suntikan pertama

(b)

bagi suntikan berikutnya

180.00 100.00

Inductively Coupled Plasma (ICP-OES)

(a)

bagi suntikan pertama

(b)

bagi suntikan berikutnya

100.00 50.00

Fourier Transform Spectroscopy (FTIR)

120.00 bagi setiap sampel

Thermo-Gravimetric Analysis (TGA)

(a)

jam pertama bagi setiap sampel

(b)

jam berikutnya bagi setiap sampel

100.00 50.00

Thermo Mechanical Analyzer (TMA)

(a)

jam pertama bagi setiap sampel

(b)

jam berikutnya bagi setiap sampel

120.00 60.00

UV-Visible Spectrophotometer (UV-Vis)

80.00 bagi setiap sampel

Differential Scanning Calorimeter (DSC)

(a)

jam pertama bagi setiap sampel

(b)

jam berikutnya bagi setiap sampel

100.00 50.00

P.U. (A) 463 9

(1)

Tugas Khas

(2)

High Performance Liquid Chromatography (HPLC)

UV/RI Detector

(a)

bagi suntikan pertama

(b)

bagi suntikan berikutnya

100.00 50.00 5.

PENGGUNAAN KENDERAAN JABATAN BOMBA DAN PENYELAMAT BAGI

TUJUAN LUAR KECEMASAN

Apa-apa jentera pemadaman dan penyelamatan melebihi 18 tan

(a)

bagi jam pertama

(b)

bagi setiap jam berikutnya

(c)

bagi setiap kilometer (km)

(atas dasar harian)

1,400.00 55.00 6.00

Apa-apa jentera pemadaman dan penyelamatan antara 10 hingga 18 tan

(a)

bagi jam pertama

(b)

bagi setiap jam berikutnya

(c)

bagi setiap kilometer (km)

(atas dasar harian)

650.00 45.00 4.00

P.U. (A) 463 10

(1)

Tugas Khas

(2)

Apa-apa jentera pemadaman dan penyelamatan di bawah 10 tan

(a)

bagi jam pertama

(b)

bagi setiap jam berikutnya

(c)

bagi setiap kilometer (km)

(atas dasar harian)

380.00 40.00 3.00

Selain jentera pemadaman dan penyelamatan

Melebihi 3 tan

(a)

bagi jam pertama

(b)

bagi setiap jam berikutnya

(c)

bagi setiap kilometer (km)

160.00 15.00 2.00

Di bawah 3 tan

(a)

bagi jam pertama

(b)

bagi setiap jam berikutnya

(c)

bagi setiap kilometer (km)

60.00 10.00 1.00

Pengangkutan air

Apa-apa vesel melebihi 100 hp

(a)

bagi jam pertama

(b)

bagi setiap jam berikutnya

500.00 150.00

P.U. (A) 463 11

(1)

Tugas Khas

(2)

Apa-apa vesel di bawah 100 hp

(a)

bagi jam pertama

(b)

bagi setiap jam berikutnya

80.00 75.00

Pengangkutan udara

(a)

Pesawat udara besar

10,000 kg – 13,999 kg 17,300.00 setiap jam 2,328.00 setiap jam bagi penggunaan bahan api 582.00 setiap jam bagi penggunaan minyak 6,000 kg – 9,999 kg 11,800.00 setiap jam 1,455.00 setiap jam bagi penggunaan bahan api 363.00 setiap jam bagi penggunaan minyak

(b)

Pesawat udara kecil

5,999 kg dan ke bawah 10,700.00 setiap jam 728.00 setiap jam bagi penggunaan bahan api 182.00 setiap jam bagi penggunaan minyak

P.U. (A) 463 12

(1)

Tugas Khas

(2)

6.

PERKHIDMATAN LAIN

Personel bomba

(a)

Penguasa Bomba

(b)

Penolong Penguasa Bomba

(c)

Pegawai Bomba

45.00 setiap jam 35.00 setiap jam 16.00 setiap jam

Salinan laporan kebakaran 100.00 setiap salinan

Perakuan pemadam api mudah alih 5.00 setiap unit

Dibuat 26 November 2021

[KPKT/PUU(S)/8/05; PN(PU2)471/Jld. 7]

DATO' SRI REEZAL MERICAN BIN NAINA MERICAN

Menteri Perumahan dan Kerajaan Tempatan

P.U. (A) 463 13

FIRE SERVICES ACT 1988

FIRE SERVICES (SPECIAL DUTY FEES)

REGULATIONS 2021

IN exercise of the powers conferred by paragraph 62(1)(l)

of the

Fire Services Act 1988 [Act 341], the Minister makes the following regulations:

Citation and commencement 1.

(1)

These regulations may be cited as the Fire Services (Special Duty Fees)

Regulations 2021.

(2)

These Regulations come into operation on 1 January 2022.

Fees 2.

The fees prescribed in column (2) of the Schedule shall be paid for the special duty specified in column (1).

Waiver of fees 3.

The Director General may, in his discretion, in any particular case, waive wholly or in part any fee specified in the Schedule.

Revocation 4.

The Fees (Fire Services) Order 1977 [P.U. (A) 207/1977] is revoked.

Saving and transitional 5.

Any application for a special duty or second inspection made and pending under the Fees (Fire Services) Order 1977 (“the revoked Order”) shall, on the date of coming into operation of these Regulations, be dealt with under the revoked Order as if the revoked Order had not been revoked by these Regulations.

P.U. (A) 463 14

Jadual

Suggest a correction

[Regulation 2]

(1)

Special Duty

(2)

Fee

1.

INSPECTION OF PREMISES

(a)

for the first inspection 100.00

(b)

for the subsequent inspection 200.00 2.

INSPECTION AND TESTING OF FIRE-FIGHTING EQUIPMENT OR FIRE SAFETY

INSTALLATION

Dry riser system 100.00 for each stack

Wet riser system

(a)

for each pump set

(b)

for each stack

150.00 100.00

Fire hydrant 100.00 for each unit

Pressurised fire hydrant system

(a)

for each pump set

(b)

for each unit of fire hydrant

150.00 100.00

Fixed water monitor

(a)

for each pump set

(b)

for each unit of monitor

150.00 10.00

P.U. (A) 463 15

(1)

Special Duty

(2)

Fee

Hose reel system

(a)

for each pump set

(b)

for each unit of hose reel

50.00 10.00

Automatic sprinkler system

(a)

for each pump set

(b)

for each sprinkler head

150.00 2.00

Water spray system

(a)

for each pump set

(b)

for each head of water spray

150.00 2.00

Foam system

(a)

for each pump set

(b)

for each nozzle head

150.00 2.00

Gaseous system 150.00 for each system

Other automatic fire extinguishing system 150.00 for each system

Smoke control system 100.00 for each system

Pressurization system 100.00 for each system

P.U. (A) 463 16

(1)

Special Duty

(2)

Fee

Automatic fire detection system

(a)

for each unit

(b)

for each system

5.00 100.00

Manual call point

(a)

for each unit

(b)

for each system

5.00 100.00

Firemen intercom system 5.00 for each unit

Public address system 50.00 for each system

Electrical isolation switch 5.00 for each unit

Fire damper 10.00 for each unit

Fire lift 100.00 for each unit

Fire escape bed lift 100.00 for each unit

Passenger lift 50.00 for each unit

Fire door 5.00 for each unit

Main fire alarm panel 50.00 for each unit

Emergency power system 20.00 for each unit

Fire roller shutter 10.00 for each unit

Emergency light 2.00 for each unit

P.U. (A) 463 17

(1)

Special Duty

(2)

Fee

Emergency exit sign light 2.00 for each unit

Portable fire extinguisher 10.00 for each unit

Trolley type fire extinguisher 10.00 for each unit

Fire rated duct 1.00 per m3

Smoke curtain 5.00 for each unit

Fire rated lift landing door 5.00 for each unit

External wall cladding system 100.00 for each system

Protected staircase/Fire-fighting staircase 100.00 for each shaft 3.

FIRE SAFETY PRODUCT TESTING EQUIPMENT

Fire resistance testing furnace

(a)

1 hour

(b)

2 hour

(c)

3 hour

(d)

4 hour

3,490.00 4,450.00 5,300.00 6,040.00

Fire suppression testing chamber

(a)

Class A

(b)

Class B

(c)

PVC Rib

(d)

Cold Dis

1,430.00 1,430.00 1,430.00 1,430.00

P.U. (A) 463 18

(1)

Special Duty

(2)

Fee

Cone calorimeter 1,250.00 per test/sample

Room corner test 2,110.00 per test/sample

Fabric test

(a)

Fabric composition test

(b)

Fabric tensile strength test

(c)

Fabric tearing strength test

(d)

Thread count test

(e)

Colour coordinate test

(f)

Weave test

(g)

Abrasion test

(h)

Mass per unit area test

(i)

Colour fastness to washing test

(j)

Colour fastness to perspiration test

(k)

Colour fastness to rubbing test

(l)

Colour fastness to water test

(m)

Fabric width test

(n)

Dimensional change test

(o)

Fabric flammability test

(p)

Fabric water repellent test

600.00 240.00 240.00 160.00 120.00 110.00 320.00 130.00 150.00 160.00 140.00 160.00 90.00 230.00 320.00 230.00

P.U. (A) 463 19

(1)

Special Duty

(2)

Fee

4.

UTILIZATION OF FIRE INVESTIGATION LABORATORY EQUIPMENT

Gas Chromatography (GC)-MS

(a)

for the first injection

(b)

for the subsequent injection

180.00 100.00

Inductively Coupled Plasma (ICP-OES)

(a)

for the first injection

(b)

for the subsequent injection

100.00 50.00

Fourier Transform Spectroscopy (FTIR)

120.00 for each sample

Thermo-Gravimetric Analysis (TGA)

(a)

first hour for each sample

(b)

subsequent hour for each sample

100.00 50.00

Thermo Mechanical Analyzer (TMA)

(a)

first hour for each sample

(b)

subsequent hour for each sample

120.00 60.00

UV-Visible Spectrophotometer (UV-Vis)

80.00 for each sample

Differential Scanning Calorimeter (DSC)

(a)

first hour for each sample

(b)

subsequent hour for each sample

100.00 50.00

P.U. (A) 463 20

(1)

Special Duty

(2)

Fee

High Performance Liquid Chromatography (HPLC)

UV/RI Detector

(a)

for the first injection

(b)

for the subsequent injection

100.00 50.00 5.

THE USAGE OF VEHICLES OF THE FIRE AND RESCUE DEPARTMENT FOR

NON EMERGENCY PURPOSES

Any fire and rescue tender above 18 tonne

(a)

for first hour

(b)

for each subsequent hour

(c)

for each kilometre (km)

(on daily basis)

1,400.00 55.00 6.00

Any fire and rescue tender between 10 tonne to 18 tonne

(a)

for the first hour

(b)

for each subsequent hour

(c)

for each kilometre (km)

(on daily basis)

650.00 45.00 4.00

P.U. (A) 463 21

(1)

Special Duty

(2)

Fee

Any fire and rescue tender below 10 tonne

(a)

for the first hour

(b)

for each subsequent hour

(c)

for each kilometre (km)

(on daily basis)

380.00 40.00 3.00

Other than fire and rescue tender

Above 3 tonne

(a)

for the first hour

(b)

for each subsequent hour

(c)

for each kilometre (km)

160.00 15.00 2.00

Below 3 tonne

(a)

for the first hour

(b)

for each subsequent hour

(c)

for each kilometre (km)

60.00 10.00 1.00

Water transportation

Any vessel above 100 hp

(a)

for the first hour

(b)

for each subsequent hour

500.00 150.00

P.U. (A) 463 22

(1)

Special Duty

(2)

Fee

Any vessel below 100 hp

(a)

for the first hour

(b)

for each subsequent hour

80.00 75.00

Air transportation

(a)

Large aircraft

10,000 kg – 13,999 kg 17,300.00 per hour 2,328.00 per hour for fuel consumption 582.00 per hour for oil consumption 6,000 kg – 9,999 kg 11,800.00 per hour 1,455.00 per hour for fuel consumption 363.00 per hour for oil consumption

(b)

Small aircraft

5,999 kg and below 10,700.00 per hour 728.00 per hour for fuel consumption 182.00 per hour for oil consumption

P.U. (A) 463 23

(1)

Special Duty

(2)

Fee

6.

OTHER SERVICES

Fire personnel

(a)

Fire Superintendent

(b)

Assistant Fire Superintendent

(c)

Fire Officer

45.00 per hour 35.00 per hour 16.00 per hour

Copies of fire report 100.00 per copy

Certificate of portable fire extinguisher 5.00 per unit

Made 26 November 2021

[KPKT/PUU(S)/8/05; PN(PU2)471/Jld. 7]

DATO' SRI REEZAL MERICAN BIN NAINA MERICAN

Minister of Housing and Local Government

Common questions

What is PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021?
PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 is Malaysia P.U. (A), cited as P.U. (A) 463 2021, currently marked in force and first recorded in 2021.
Is PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 still in force?
Yes — PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 is currently in force.
When did PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 take effect?
PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 was first recorded in 2021.
How many sections does PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 have?
PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 contains 5 sections.
Where can I read the official version of PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021?
The official text of PERATURAN-PERATURAN PERKHIDMATAN BOMBA (FI TUGAS KHAS) 2021 is published at lom.agc.gov.my.