Seksyen 1
(1)
Perintah ini bolehlah dinamakan
Perintah Jalan Persekutuan
(Lebuh Raya Pesisiran Pantai Barat (Taiping-Banting)) (Pindaan) 2023.
/akn/my/act/pua/2023/354
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2023 is Malaysia P.U. (A), cited as P.U. (A) 354 2023, currently marked in force and first recorded in 2023.
Opening note
Perintah ini bolehlah dinamakan
Perintah Jalan Persekutuan
(Lebuh Raya Pesisiran Pantai Barat (Taiping-Banting)) (Pindaan) 2023.
Perintah
Jalan
Persekutuan
(Lebuh
Raya
Pesisiran
Pantai
Barat
(Taiping-Banting)) 2019 [P.U. (A) 150/2019], yang disebut “Perintah ibu” dalam
dalam subsubperenggan (c), dengan menggantikan noktah di hujung subsubperenggan itu dengan koma bernoktah; dan
dengan memasukkan selepas subsubperenggan (c) subsubperenggan yang berikut:
“(d)
bahagian jalan yang dikenali sebagai Lebuh Raya Pesisiran Pantai
Barat (Taiping-Banting) yang bermula dari kilometer 40.07
di koordinat U 402412.484, T 356993.108 Grid RSO Geosentrik
(GDM 2000) dan berakhir di kilometer 62.12 di koordinat
U 423090.950, T 353934.636 Grid RSO Geosentrik (GDM 2000)
(kedua-dua jarak diukur dari kilometer 0.0 Lebuh Raya Pesisiran
Pantai Barat (Taiping-Banting) di Persimpangan Bertingkat
Banting) termasuklah Plaza Tol Assam Jawa, Persimpangan
P.U. (A) 354 3
Bertingkat Assam Jawa dan jalan-jalan sambungannya, iaitu suatu jarak sepanjang 22.05 kilometer.”.
Penggantian Jadual
Perintah ini, dipinda dalam subperenggan 2(1)—
Perintah ibu dipinda dengan menggantikan Jadual dengan jadual yang berikut:
“JADUAL
”.
P.U. (A) 354 4
Dibuat 17 November 2023
[KKR.PUU.110-1/6/20 Jld.2; PN(PU2)391/Jld. 48]
DATO SRI ALEXANDER NANTA LINGGI
Menteri Kerja Raya
[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]
P.U. (A) 354 5
FEDERAL ROADS ACT 1959
FEDERAL ROADS (WEST COAST EXPRESSWAY (TAIPING-BANTING)) (AMENDMENT)
ORDER 2023
Opening note
This order may be cited as the Federal Roads (West Coast Expressway
(Taiping-Banting)) (Amendment) Order 2023.
This Order comes into operation on 20 November 2023.
Amendment of paragraph 2 2.
The Federal Roads (West Coast Expressway (Taiping-Banting)) Order 2019
[P.U. (A) 150/2019], which is referred to as the “principal Order” in this Order, is amended in subparagraph 2(1)—
in subsubparagraph (c), by substituting for the full stop at the end of the subsubparagraph a semicolon; and
by inserting after subsubparagraph (c) the following subsubparagraph:
“(d)
the part of the road known as the West Coast Expressway
(Taiping–Banting)
commencing from kilometre 40.07
at coordinates N 402412.484, E 356993.108 of the RSO Geocentric
(GDM 2000) Grid and ending at kilometre 62.12 at coordinates
N 423090.950, E 353934.636 of the RSO Geocentric (GDM 2000)
Grid
(both distances are measured from kilometre 0.0
of the West Coast Expressway (Taiping-Banting) at the Banting
Interchange) including the Assam Jawa Toll Plaza, Assam Jawa
Interchange and its link roads, being a distance of 22.05 kilometre.”.
P.U. (A) 354 6
”.
Substitution of Schedule 3.
The principal Order is amended by substituting for the Schedule the following schedule:
“SCHEDULE
P.U. (A) 354 7
Made 17 November 2023
[KKR.PUU.110-1/6/20; PN(PU2)391/Jld. 48]
DATO SRI ALEXANDER NANTA LINGGI
Minister of Works
[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]