Seksyen 1
(1)
Perintah ini bolehlah dinamakan
Perintah Jalan Persekutuan
(Malaysia Barat) (Pindaan) (No. 10) 2023.
/akn/my/act/pua/2023/212
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) (NO. 10) 2023 is Malaysia P.U. (A), cited as P.U. (A) 212 2023, currently marked in force and first recorded in 2023.
Opening note
Perintah ini bolehlah dinamakan
Perintah Jalan Persekutuan
(Malaysia Barat) (Pindaan) (No. 10) 2023.
Perintah Jalan Persekutuan (Malaysia Barat) 1989 [P.U. (A) 401/1989], yang disebut “Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Ketiga di bawah kepala Pulau Pinang—
dengan menggantikan butiran 5 dengan butiran yang berikut:
“5.
(Laluan 283): Jalan Transkrian
Bermula dari sempadan negeri Perak dan Pulau Pinang di koordinat
U 5.132784, T 100.490838 dan berakhir di persimpangan Laluan 1,
Jalan Ipoh-Butterworth di koordinat U 5.160883, T 100.477897
termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam PETA 2: JALAN TRANSKRIAN
(jarak sepanjang 3.655 km).”; dan
dengan menggantikan PETA 2: JALAN TRANKRIAN dengan peta yang berikut:
3
“PETA 2: JALAN TRANSKRIAN
4
Pindaan Jadual Keempat
Jadual Keempat kepada Perintah ibu dipinda di bawah kepala Pulau Pinang
(Seberang Perai)—
(a)
dengan menggantikan butiran 1 dengan butiran yang berikut:
“1.
(Laluan 3111): Jalan Permatang Pauh
Bermula dari bulatan
Laluan 1,
Jalan
Ipoh-Butterworth di koordinat U 5.365138, T 100.425197 dan berakhir di koordinat
U 5.412913, T 100.371869 termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam
PETA 1: JALAN PERMATANG PAUH (jarak sepanjang 10.047 km).”;
(b)
dengan memotong butiran 2; dan
(c)
dengan memasukkan selepas butiran 3 peta yang berikut:
5
“PETA 1: JALAN PERMATANG PAUH
Dibuat 12 Julai 2023
[KKR.100-1/2/15; PN(PU2)391/Jld. 46]
DATO SRI ALEXANDER NANTA LINGGI
Menteri Kerja Raya
[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]
6
FEDERAL ROADS ACT 1959
FEDERAL ROADS (WEST MALAYSIA) (AMENDMENT) (NO. 10) ORDER 2023
IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959 [Act 376], the Minister, after consultation with the State Government of Penang, makes the following order:
Citation and commencement 1.
(1)
This order may be cited as the Federal Roads (West Malaysia)
(Amendment) (No. 10) Order 2023.
(2)
This Order comes into operation on 15 July 2023.
Amendment of Third Schedule 2.
The Federal Roads (West Malaysia) Order 1989 [P.U. (A) 401/1989], which is referred to as the “principal Order” in this Order, is amended in the Third Schedule under the heading of Pulau Pinang—
(a)
by substituting for item 5 the following item:
“5.
(Route 283): Transkrian Road
Starting from Perak and Penang state boundary at coordinates
N 5.132784, E 100.490838 and ending at the junction of Route 1,
Ipoh-Butterworth Road at coordinates N 5.160883, E 100.477897
including its link road within the boundaries of right of way as shown on MAP 2: TRANSKRIAN ROAD (a distance of 3.655 km).”;
and
(b)
by substituting for MAP 2: JALAN TRANKRIAN the following map:
7
“MAP 2: TRANSKRIAN ROAD
”.
8
Amendment of Fourth Schedule 3.
The Fourth Schedule to the principal Order is amended under the heading of
Pulau Pinang (Seberang Perai)—
(a)
by substituting for item 1 the following item:
“1.
(Route 3111): Permatang Pauh Road
Starting from the roundabout of Route 1, Ipoh-Butterworth Road at coordinates N 5.365138, E 100.425197 and ending at coordinates
N 5.412913, E 100.371869 including its link road within the boundaries of right of way as shown on MAP 1: PERMATANG
PAUH ROAD (a distance of 10.047 km).";
(b)
by deleting item 2; and
(c)
by inserting after item 3 the following map:
9
“MAP 1: PERMATANG PAUH ROAD
Made 12 July 2023
[KKR.100-1/2/15; PN(PU2)391/Jld. 46]
DATO SRI ALEXANDER NANTA LINGGI
Minister of Works
[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]
”.