Seksyen 1
(1)
Perintah ini bolehlah dinamakan Perintah Jalan Persekutuan (Sarawak)
(Pindaan) 2024.
/akn/my/act/pua/2024/17
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) 2024 is Malaysia P.U. (A), cited as P.U. (A) 17 2024, currently marked in force and first recorded in 2024.
Opening note
Perintah ini bolehlah dinamakan Perintah Jalan Persekutuan (Sarawak)
(Pindaan) 2024.
Perintah Jalan Persekutuan (Sarawak) 1996 [P.U. (A) 551/1996], yang disebut
“Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Pertama, di bawah kepala
LEBUHRAYA
PAN
BORNEO, dengan memasukkan selepas butiran
(ji)
butiran yang berikut:
“ (jj)
(Laluan 1): Persimpangan Spaoh-Jambatan Sungai Awik
Bermula di koordinat U 1.544159, T 111.496965 dan berakhir di koordinat
U 1.778582, T 111.372797 termasuk jalan sambungannya di dalam sempadan hak lalu lalang sebagaimana yang ditunjukkan dalam
PETA
PERSIMPANGAN
SPAOH-JAMBATAN
SUNGAI
AWIK
(jarak sepanjang 34.282 km). ”.
Pindaan Jadual Ketiga
PETA TAMAN DA SING-BANDAR BARU PERMYJAYA peta yang berikut:
P.U. (A) 17 3
“PETA PERSIMPANGAN SPAOH-JAMBATAN SUNGAI AWIK
Dibuat 23 Januari 2024
[KKR.100-1/2/23; PN(PU2)391/Jld. 48]
DATO SRI ALEXANDER NANTA LINGGI
Menteri Kerja Raya
[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]
”.
P.U. (A) 17 4
FEDERAL ROADS ACT 1959
FEDERAL ROADS (SARAWAK) (AMENDMENT) ORDER 2024
Opening note
This order may be cited as the Federal Roads (Sarawak) (Amendment)
Order 2024.
This Order comes into operation on 29 January 2024.
Amendment of First Schedule 2.
The Federal Roads (Sarawak) Order 1996 [P.U. (A) 551/1991], which is referred to as the “principal Order” in this Order, is amended in the First Schedule, under the heading of PAN BORNEO HIGHWAY, by inserting after item (ji) the following item:
“(jj)
(Route 1): Spaoh Intersection-Sungai Awik Bridge
Starting at coordinates N 1.544159, E 111.496965 and ending at coordinates N 1.778582, E 111.372797 including its link road within the boundaries of right of way as shown on
MAP
OF
SPAOH
INTERSECTION-SUNGAI
AWIK
BRIDGE
(a distance of 34.282 km).”.
Amendment of Third Schedule 3.
The principal Order is amended in the Third Schedule by inserting after
MAP OF DA SING PARK-PERMYJAYA NEW TOWN the following map:
P.U. (A) 17 5
“MAP OF SPAOH INTERSECTION-SUNGAI AWIK BRIDGE
Made 23 January 2024
[KKR.100-1/2/23; PN(PU2)391/Jld. 48]
DATO SRI ALEXANDER NANTA LINGGI
Minister of Works
[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]
”.