/akn/my/act/pua/2024/337

PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2024
Sections
3

Quick answer

About this p.u. (a)

PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 is Malaysia P.U. (A), cited as P.U. (A) 337 2024, currently marked in force and first recorded in 2024.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 3 Akta Jalan Persekutuan 1959 [Akta 376], Menteri, setelah berunding dengan Kerajaan Negeri Sarawak, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Perintah Jalan Persekutuan (Sarawak) 1996 [P.U. (A) 551/1996], yang disebut

Open as pageSuggest a correction

“Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Pertama di bawah kepala

LEBUH RAYA PAN BORNEO, dengan memasukkan selepas butiran (jo) butiran yang berikut:

“(jp)

(Laluan 1): Simpang Pantu-Jambatan Sungai Entulang

Bermula di koordinat U 1.083888, T 111.108475 dan berakhir di koordinat

U 1.146379, T 111.439172 termasuk jalan sambungannya di dalam sempadan hak lalu lalang sebagaimana yang ditunjukkan dalam

PETA

SIMPANG

PANTU-JAMBATAN

SUNGAI

ENTULANG

(jarak sepanjang 44.700 km).”.

Seksyen 3

Pindaan Jadual Ketiga

Open as pageSuggest a correction

PETA JAMBATAN SUNGAI KAYAN ULU-JAMBATAN SUNGAI MOYAN peta yang berikut:

P.U. (A) 337 3

“PETA SIMPANG PANTU-JAMBATAN SUNGAI ENTULANG

Dibuat 6 November 2024

[KKR.100-1/2/23; PN(PU2)391/JLD.50]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]

”.

P.U. (A) 337 4

FEDERAL ROADS ACT 1959

FEDERAL ROADS (SARAWAK) (AMENDMENT) (NO. 7) ORDER 2024

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959 [Act 376], the Minister, after consultation with the State Government of Sarawak, makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Federal Roads (Sarawak) (Amendment)

(No. 7) Order 2024.

Suggest a correction

(2)

This Order comes into operation on 8 November 2024.

Amendment of First Schedule 2.

The Federal Roads (Sarawak) Order 1996 [P.U. (A) 551/1991], which is referred to as the “principal Order” in this Order, is amended in the First Schedule under the heading PAN BORNEO HIGHWAY, by inserting after item (jo)

the following item:

“(jp)

(Route 1): Pantu Junction-Sungai Entulang Bridge

Starting at coordinates N 1.083888, E 111.108475 and ending at coordinates N 1.146379, E 111.439172 including its link road within the boundaries of right of way as shown on MAP OF PANTU JUNCTION-SUNGAI ENTULANG BRIDGE (a distance of 44.700 km).”.

Amendment of Third Schedule 3.

The principal Order is amended in the Third Schedule by inserting after

MAP OF SUNGAI KAYAN ULU BRIDGE-SUNGAI MOYAN BRIDGE the following map:

P.U. (A) 337 5

“MAP OF PANTU JUNCTION-SUNGAI ENTULANG BRIDGE

Made 6 November 2024

[KKR.100-1/2/23; PN(PU2)391/JLD.50]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]

”.

Suggest a correction

Common questions

What is PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024?
PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 is Malaysia P.U. (A), cited as P.U. (A) 337 2024, currently marked in force and first recorded in 2024.
Is PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 still in force?
Yes — PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 is currently in force.
When did PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 take effect?
PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 was first recorded in 2024.
How many sections does PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 have?
PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 contains 3 sections.
Where can I read the official version of PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024?
The official text of PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 is published at lom.agc.gov.my.
PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 7) 2024 (No. 337)