Seksyen 1
(1)
Perintah ini bolehlah dinamakan
Perintah Jalan Persekutuan
(Skim Felda) (Pindaan) (No. 3) 2023.
/akn/my/act/pua/2023/79
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH JALAN PERSEKUTUAN (SKIM FELDA) (PINDAAN) (NO. 3) 2023 is Malaysia P.U. (A), cited as P.U. (A) 79 2023, currently marked in force and first recorded in 2023.
Opening note
Perintah ini bolehlah dinamakan
Perintah Jalan Persekutuan
(Skim Felda) (Pindaan) (No. 3) 2023.
Perintah Jalan Persekutuan (Skim Felda) 1991 [P.U. (A) 449/1991], yang disebut “Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Pertama di bawah kepala “Negeri Johor” dengan menggantikan butiran “Bk. Batu” dan butir-butir yang berhubungan dengannya dengan butiran dan butir-butir yang berikut:
Nama Skim
FELDA
Nombor Laluan bagi Jalan Masuk
Jalan Masuk
(km)
Jalan Kampung
(km)
“Bukit Batu 1376 2.943 8.992”.
Pindaan Jadual Kedua
Jadual Kedua kepada Perintah ibu dipinda dengan memasukkan selepas
PETA 19: SIMPANG LINK KOTA GELANGI peta yang berikut:
P.U. (A) 79 3
“PETA 20: BUKIT BATU
Dibuat 28 Mac 2023
[KKR.PUU.100-1/2/17; PN(PU2)391/Jld. 44]
DATO SRI ALEXANDER NANTA LINGGI
Menteri Kerja Raya
[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]
”.
P.U. (A) 79 4
FEDERAL ROADS ACT 1959
FEDERAL ROADS (FELDA SCHEME) (AMENDMENT) (NO. 3) ORDER 2023
IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959
[Act 376], the Minister, after consultation with the State Government of Johore, makes the following order:
Citation and commencement 1.
(1)
This order may be cited as the Federal Roads (Felda Scheme)
(Amendment) (No. 3) Order 2023.
(2)
This Order comes into operation on 31 Mac 2023.
Amendment of First Schedule 2.
The Federal Roads (Felda Scheme) Order 1991 [P.U. (A) 449/1991], which is referred to as “the principal Order” in this Order, is amended in the
First Schedule under the heading of “State of Johore” by substituting for item “Bk. Batu”
and the particulars relating to it the following item and particulars:
Name of FELDA
Scheme
Route Number for Approach Roads
Approach Roads
(km)
Village Roads
(km)
“Bukit Batu 1376 2.943 8.992”.
Amendment of Second Schedule 3.
The Second Schedule to the principal Order is amended by inserting after
MAP 19: SIMPANG LINK KOTA GELANGI the following map:
P.U. (A) 79 5
“MAP 20: BUKIT BATU
Made 28 March 2023
[KKR.PUU.100-1/2/17; PN(PU2)391/Jld. 44]
DATO SRI ALEXANDER NANTA LINGGI
Minister of Works
[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]
”.