/akn/my/act/pua/2023/373

PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2023
Sections
94

Quick answer

About this p.u. (a)

PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 is Malaysia P.U. (A), cited as P.U. (A) 373 2023, currently marked in force and first recorded in 2023.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh subseksyen 2(2) Akta Pemajuan Perumahan (Kawalan dan Pelesenan)1966
  2. [Akta 118], Menteri membuat perintah yang berikut: Nama

Seksyen 1

Perintah ini bolehlah dinamakan

Open as pageSuggest a correction

Perintah

Pemajuan

Perumahan

(Kawalan dan Pelesenan) (Pengecualian) 2023.

Seksyen 2

Pengecualian

Open as pageSuggest a correction

Menteri mengecualikan pemaju perumahan yang dinyatakan dalam ruang (1) Jadual yang merupakan pemegang lesen pemajuan perumahan yang dinyatakan dalam ruang (2) Jadual daripada pemakaian peruntukan kontrak seragam bagi jualan dan belian di bawah peraturan 11 Peraturan-Peraturan Pemajuan Perumahan

(Kawalan dan Pelesenan) 1989 [P.U. (A) 58/1989] sebagaimana yang diperihalkan dalam fasal kontrak seragam yang dinyatakan dalam ruang (3) Jadual mulai tarikh yang dinyatakan dalam ruang (4) Jadual.

P.U. (A) 373 3

HOUSING DEVELOPMENT (CONTROL AND LICENSING) ACT 1966

HOUSING DEVELOPMENT (CONTROL AND LICENSING)

(EXEMPTION) ORDER 2023

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by subsection 2(2) of the Housing Development (Control and Licensing) Act 1966 [Act 118], the Minister makes the following order: Citation 1. This order may be cited as the Housing Development (Control and Licensing) (Exemption) Order 2023. Exemption 2. The Minister exempts the housing developer specified in column (1) of the Schedule being the holder of the housing development licence specified in column (2) of the Schedule from the application of provisions of uniform contract for sale and purchase under regulation 11 of the Housing Development (Control and Licensing) Regulations 1989 [P.U. (A) 58/1989] as described in the clause of uniform contract specified in column (3) of the Schedule from the date specified in column (4) of the Schedule. P.U. (A) 373 4 JADUAL/SCHEDULE

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

Suggest a correction

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

Suggest a correction

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

Suggest a correction

(4)

Tarikh/

Date

Core Precious Development

Sdn. Bhd.

19783-1/10-2021/0944

(a)

Fasal 1 Tafsiran Perjanjian Jual Beli

(“PJB”) dipinda dalam Jadual H/

Clause 1 Interpretation of Sale and

Purchase Agreement (“S&P”) is amended in Schedule H

Suggest a correction

(b)

Fasal 22

dipinda dengan memasukkan perkataan

“untuk rawatan air buangan dan air kitar semula”/

Clause 22 is amended by inserting the words “for the treatment of waste water and of recycled water”

Suggest a correction

(c)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities 23 Januari 2020/

23 January 2020

P.U. (A) 373 5

Suggest a correction
Suggest a correction

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

Suggest a correction

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

Suggest a correction

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

Suggest a correction

(4)

Tarikh/

Date

(d)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

Suggest a correction

(e)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Cosmowealth Housing

Development Sdn. Bhd.

19228-2/01-2022/62

Suggest a correction

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Suggest a correction
Suggest a correction

Jadual

Suggest a correction

Schedule H

24 Januari 2020/

24 January 2020

P.U. (A) 373 6

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4) dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Elite Starhills Sdn. Bhd.

19828-1/12-2021/01159

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

4 Februari 2020/

4 February 2020

P.U. (A) 373 7

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Aspen Vision City Sdn. Bhd.

14588-3/12-2021/01167

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25

and 29

are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

10 Februari 2020/

10 February 2020

P.U. (A) 373 8

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Enigma Pedoman Sdn. Bhd.

19815-1/11-2021/01086

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession for S&P in

Jadual

Suggest a correction

Schedule G

19 Februari 2020/

19 February 2020

Paramount 2000 Sdn. Bhd.

10346-2/12-2020/01142

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession for S&P in

Jadual

Suggest a correction

Schedule G

19 Februari 2020/

19 February 2020

Taraf Nusantara Sdn. Bhd.

14283-8/01-2022/18

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession for S&P in

Jadual

Suggest a correction

Schedule G

19 Februari 2020/

19 February 2020

Kirana Kemajuan Sdn. Bhd.

12409-2/02-2022/0162

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

21 Februari 2020/

21 February 2020

P.U. (A) 373 9

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Tropicana Metropark

Sdn. Bhd.

12238-4/02-2022/0180

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

28 Februari 2020/

28 February 2020

P.U. (A) 373 10

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Tropicana Sierra Sdn. Bhd.

19893-1/03-2022/0199

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

3 Mac 2020/

3 March 2020

P.U. (A) 373 11

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

368 Segambut Sdn. Bhd.

19221-2/02-2022/0163

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

16 Mac 2020/

16 March 2020

P.U. (A) 373 12

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Taraf Nusantara Sdn. Bhd.

14283-10/01-2022/76

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession for S&P in

Jadual

Suggest a correction

Schedule G

27 April 2020 27 April 2020

P.U. (A) 373 13

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Skysierra Development

Sdn. Bhd.

19840-1/12-2021/01241

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

27 April 2020 27 April 2020

P.U. (A) 373 14

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Paramount Property (PW)

Sdn. Bhd.

14638-3/11-2021/01152

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

27 April 2020 27 April 2020

Kenwingston Venture

Sdn. Bhd.

19873-1/01-2022/90

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

18 Mei 2020/

18 May 2020

SBR Development Sdn. Bhd.

19896-1/03-2022/0207

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

18 Mei 2020/

18 May 2020

P.U. (A) 373 15

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Khoo Soon Lee Realty

Sdn. Bhd.

3390-64/10-2021/0965

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

18 Mei 2020/

18 May 2020

KLN Land Sdn. Bhd.

19858-1/01-2022/26

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

21 Mei 2020/

21 May 2020

P.U. (A) 373 16

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Bangsar Hill Park

Development Sdn. Bhd.

7997-3/02-2022/0139

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

21 Mei 2020/

21 May 2020

Sunway Velocity Two Sdn.

Bhd.

19512-2/02-2022/0192

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

21 Mei 2020/

21 May 2020

P.U. (A) 373 17

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

(d)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

The Sixth Schedule is inserted as a brief summary of the purchase unit

(e)

Fasal 35

dipinda dengan memasukkan perkataan

“Jadual

Keenam”/

Clause 35 is amended by inserting the words “Sixth Schedule”

Vienna Home Sdn. Bhd.

11348-2/06-2022/0326

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 5 Jun 2020/

5 June 2020

P.U. (A) 373 18

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

TA First Credit Sdn. Bhd.

9149-2/07-2020/02508

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 12 Jun 2020/

12 June 2020

P.U. (A) 373 19

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Momentumace Sdn. Bhd.

19917-1/05-2022/0305

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

23 Jun 2020/

23 June 2020

P.U. (A) 373 20

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Momentumace Sdn. Bhd.

19917-2/06-2022/0336

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

23 Jun 2020/

23 June 2020

Momentumace Sdn. Bhd.

19917-3/06-2022/0343

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

23 Jun 2020/

23 June 2020

PLB Land Sdn. Bhd.

8139-4/12-2021/01273

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 23 Jun 2020/

23 June 2020

P.U. (A) 373 21

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

UDA Accord Development

Sdn. Bhd.

19873-1/01-2022/90

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

23 Jun 2020/

23 June 2020

P.U. (A) 373 22

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Koleksi Sigma Sdn. Bhd.

19924-1/06-2022/0358

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

1 Julai 2020/

1 July 2020

Sunway Belfield Sdn. Bhd.

19930-1/06-2022/0386

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

8 Julai 2020/

8 July 2020

P.U. (A) 373 23

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

(d)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

Sixth Schedule is inserted as a brief summary of the purchase unit

(e)

Fasal 35

dipinda dengan memasukkan perkataan

“Jadual

Keenam”/

Clause 35 is amended by inserting the words “Sixth Schedule”

Maxim Heights Sdn. Bhd.

11606-2/07-2022/0392

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 9 Julai 2020/

9 July 2020

P.U. (A) 373 24

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Malton Development

Sdn. Bhd.

19346-3/06-2022/0134

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 13 Julai 2020/

13 July 2020

P.U. (A) 373 25

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Riveria City Sdn. Bhd.

19929-1/06-2022/0382

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

13 Julai 2020/

13 July 2020

P.U. (A) 373 26

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Optimus Medini Sdn. Bhd.

19867-1/01-2022/68

(a)

Mukadimah dipinda dalam

Jadual

Suggest a correction

Jadual H/

Preamble is amended in Schedule H

(b)

Fasal 2

dipinda dengan memasukkan perkataan

“Petak tersebut”/

Clause 2 is amended by inserting the words “the said Parcel”

(c)

Fasal 3 dipinda dengan memotong perkataan

“Tuan

Punya”

dan

“Tanah tersebut”/

Clause 3 is amended by deleting the words “Proprietor” and “the said

Land”

(d)

Fasal 4 Harga Beli dipinda/

Clause 4 of Purchase Price is amended

(e)

Peruntukan baharu fasal 5A dimasukkan bagi mewujudkan terma yang berhubungan dengan pindah milik Pajakan tersebut/

13 Julai 2020/

13 July 2020

P.U. (A) 373 27

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

A new provision of clause 5A is inserted to create a term relating to the transfer of the said Lease

(f)

Fasal 6 Kemudahan Kewangan dipinda/

Clause 6 of Financial Facility is amended

(g)

Fasal 12

dipinda dengan memasukkan perkataan “pajakan petak tersebut untuk baki Tempoh

Pajakan”/

Clause 12 is amended by inserting the words “lease over the said parcel for the remainder of the Lease

Tenure”

(h)

Fasal 13 Tempat dan Keluasan

Petak dipinda/

Clause 13 of Position and Area of

Parcel is amended

(i)

Fasal 16 dipotong/

Clause 16 is deleted

P.U. (A) 373 28

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(j)

Fasal 21 Bayaran Tetap dipinda/

Clause 21 of Payment of Outgoing is amended

(k)

Fasal 28 Hakmilik Strata Yang

Belum

Dikeluarkan dan

Pemindahan Hakmilik dipinda/

Clause 28 of Strata Title Not Yet

Issued and Transfer of Title is amended

(l)

Fasal 31 Hak Bersama Pembeli dipinda/

Clause 31 of Common Rights of

Purchaser is amended

(m)

Fasal 33 Kos yang perlu Ditanggung dipinda/

Clause 33 of Cost To Be Borne is amended

(n)

Fasal 34 Penyerahhakan dipinda/

Clause 34 of Assignment is amended

P.U. (A) 373 29

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(o)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

The Sixth Schedule is inserted as a brief summary of the purchase unit

Top Home Builder Sdn. Bhd.

13733-5/06-2022/0383

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

13 Julai 2020/

13 July 2020

P.U. (A) 373 30

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Platinum Victory

Development Sdn. Bhd.

9832-8/03-2022/0226

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

28 Julai 2020/

28 July 2020

Cenang Resort Sdn. Bhd.

19160-1/09-2020/02683

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

28 Julai 2020/

28 July 2020

P.U. (A) 373 31

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Kemudi Ehsan Sdn. Bhd.

19183-11/07-2022/0399

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

29 Julai 2020/

29 July 2020

Agile Tropicana

Development Sdn. Bhd.

19428-2/06-2022/0337

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan 29 Julai 2020/

29 July 2020

P.U. (A) 373 32

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Dwitasik Sdn. Bhd.

6627-16/06-2022/0333

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

5 Ogos 2020/

5 August 2020

P.U. (A) 373 33

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

Skyawani 5 Development

Sdn. Bhd.

19945-1/07-2022/0463

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

5 Ogos 2020/

5 August 2020

P.U. (A) 373 34

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

(d)

Fasal 34 mengenai Penyerahhakan dipinda/

Clause 34 on Assigment is amended

(e)

Peruntukan baharu fasal 37

dimasukkan yang berhubungan dengan terma moratorium /

A new provision clause 37 is inserted relating to the term of moratorium

(f)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

The Sixth Schedule is inserted as a brief summary of the purchase unit

(g)

Fasal 35

dipinda dengan memasukkan perkataan

“Jadual

Keenam”/

Clause 35 is amended by inserting the words “Sixth Schedule”

P.U. (A) 373 35

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Tropicana Temokin

Sdn. Bhd.

19947-1/08-2022/0468

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

7 Ogos 2020/

7 August 2020

P.U. (A) 373 36

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

GD Pavilion Sdn. Bhd.

19115-1/08-2020/02638

Perenggan 3 Mukadimah PJB dalam

Jadual

Suggest a correction

Jadual H dipinda untuk menyatakan perihal tanah yang dicagarkan kepada institusi perbankan/

Paragraph 3 of the Preamble of S&P in

Jadual

Suggest a correction

Schedule H is amended to specify description of the land charged to the banking institution

14 Ogos 2020/

14 August 2020

GD Pavilion Sdn. Bhd.

19115-2/04-2021/01923

Perenggan 3 Mukadimah PJB dalam

Jadual

Suggest a correction

Jadual H dipinda untuk menyatakan perihal tanah yang dicagarkan kepada institusi perbankan/

Paragraph 3 of the Preamble of S&P in

Jadual

Suggest a correction

Schedule H is amended to specify description of the land charged to the banking institution

14 Ogos 2020/

14 August 2020

BSC Land Development

Sdn. Bhd.

19907-1/04-2022/0276

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 19 Ogos 2020/

19 August 2020

P.U. (A) 373 37

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

UDA Accord Development

Sdn. Bhd.

19873-1/01-2022/90

Jadual

Suggest a correction

Jadual Ketiga (Jadual Pembayaran Harga

Beli) dipinda dalam butiran 1 bagi PJB dalam Jadual H/

The Third Schedule (Schedule of Payment of

Purchase Price) is amended in item 1 for

S&P in Schedule H

19 Ogos 2020/

19 August 2020

P.U. (A) 373 38

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Che Kiang Sdn. Bhd.

4861-5/02-2022/97

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

19 Ogos 2020/

19 August 2020

TA First Credit Sdn. Bhd.

9149-2/07-2020/02508

Jadual

Suggest a correction

Jadual Ketiga (Jadual Pembayaran Harga

Beli) dipinda dalam butiran 1 bagi PJB dalam Jadual H/

The Third Schedule (Schedule of Payment of

Purchase Price) in item 1 is amended for

S&P in Schedule H

19 Ogos 2020/

19 August 2020

Chitacon Development

Sdn. Bhd.

11243-7/01-2022/56

Jadual

Suggest a correction

Jadual Ketiga (Jadual Pembayaran Harga

Beli) dipinda dalam butiran 1 bagi PJB dalam Jadual G/

The Third Schedule (Schedule of Payment of

Purchase Price) is amended in item 1 for

S&P in Schedule G

19 Ogos 2020/

19 August 2020

P.U. (A) 373 39

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Jalilmax (Oug) Sdn. Bhd.

19931-1/07-2022/0395

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

3 September 2020/

3 September 2020

KL Eco City Sdn. Bhd.

11889-4/09-2022/0585

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

22 September 2020/

22 September 2020

MKH Property Ventures

Sdn. Bhd.

19979-1/09-2022/0609

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 25 September 2020/

25 September 2020

P.U. (A) 373 40

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Perdana Parkcity Sdn. Bhd.

2463-21/09-2022/0616

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

2 Oktober 2020/

2 October 2020

P.U. (A) 373 41

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Kemudi Ehsan Sdn. Bhd.

19183-12/03-2022/0597

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

2 Oktober 2020/

2 October 2020

WCT OUG Development

Sdn. Bhd.

14379-2/09-2022/0604

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

2 Oktober 2020/

2 October 2020

P.U. (A) 373 42

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Skyvogue Development

Sdn. Bhd.

19980-1/09-2022/0618

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

2 Oktober 2020/

2 October 2020

P.U. (A) 373 43

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

(d)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

The Sixth Schedule is inserted as a brief summary of the purchase unit

Ara Ville Sdn. Bhd.

19991-1/10-2022/0660

(a)

Jadual Ketiga (Jadual Pembayaran

Harga

Beli)

dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

8 Oktober 2020/

8 October 2020

P.U. (A) 373 44

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

KL Eco City Sdn. Bhd.

11889-3/09-2022/0573

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

6 Oktober 2020/

6 October 2020

Binastra Land Sdn. Bhd.

9795-5/10-2022/0674

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

9 Oktober 2020/

9 October 2020

P.U. (A) 373 45

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda bagi memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Pembangunan Jernih

Wawasan Sdn. Bhd.

19846-1/12-2021/01298

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

14 Oktober 2020/

14 October 2020

P.U. (A) 373 46

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Nestcon Cemerlang

Sdn. Bhd.

19995-1/10-2022/0680

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

19 Oktober 2020/

19 October 2020

Koleksi Sigma Sdn. Bhd.

19924-2/10-2022/0701

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

22 Oktober 2020/

22 October 2020

Allevia Sdn. Bhd.

19990-1/10-22/0650

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

22 Oktober 2020/

22 October 2020

P.U. (A) 373 47

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Taraf Nusantara Sdn. Bhd.

14283-12/07-2022/0438

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in

Jadual

Suggest a correction

Schedule G

30 Oktober 2020/

30 October 2020

Ehsan Armada Sdn. Bhd.

9224-4/10-2022/0681

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

2 November 2020/

2 November 2020

P.U. (A) 373 48

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Twinwood

Development

Sdn. Bhd.

20006-1/10-2020/0738

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

11 November 2020/

11 November 2020

P.U. (A) 373 49

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Mightyprop Sdn. Bhd.

20011-1/11-22/0765

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

11 November 2020/

11 November 2020

Maxitanah Sdn. Bhd.

19950-1/08-2022/0484

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession for S&P in

Jadual

Suggest a correction

Schedule G

18 November 2020/

18 November 2020

Alzac Realty Sdn. Bhd.

20009-1/11-22/0751

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

18 November 2020/

18 November 2020

P.U. (A) 373 50

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

MKH Development

Sdn. Bhd.

20010-1/11-2022/0753

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

19 November 2020/

19 November 2020

P.U. (A) 373 51

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

AUEI Teras Holdings

Sdn. Bhd.

19861-1/01-2022/46

Peruntukan baharu fasal 32 dimasukkan yang berhubungan dengan

Tiada

Penjualan

Atau

Pindah

Milik

Tanpa

Kebenaran

PR1MA

Boleh

Dilakukan

Semasa Tempoh Moratorium bagi PJB dalam Jadual H/

A new provision clause 32 is inserted relating to No Disposal Without PR1MA’s

Prior Consent During Moratorium Period for

S&P in Schedule H

26 November 2020/

26 November 2020

MH Platinum Sdn. Bhd.

13113-2/10-22/0716

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

3 Disember 2020/

3 December 2020

Tanjung Ratna Sdn. Bhd.

19468-2/08-2021/02931

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

10 Disember 2020/

10 December 2020

P.U. (A) 373 52

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

Satin Magic Sdn. Bhd.

19997-1/10-2022/0691

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

10 Disember 2020/

10 December 2020

P.U. (A) 373 53

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Worldwide Ventures

Sdn. Bhd.

6212-4/05-2021/0427

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

15 Disember 2020/

15 December 2020

One Residence Sdn. Bhd.

20017-1/12-2022/0817

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

15 Disember 2020/

15 December 2020

P.U. (A) 373 54

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Jaringan Simfoni Sdn. Bhd.

19902-1/03-2022/0242

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

15 Disember 2020/

15 December 2020

P.U. (A) 373 55

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Alzac Realty Sdn. Bhd.

20009-1/11-22/0751

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

15 Disember 2020/

15 December 2020

Twinwood Development

Sdn. Bhd.

20006-1/10-2020/0738

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

15 Disember 2020/

15 December 2020

P.U. (A) 373 56

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Kunci Muhibah Sdn. Bhd.

19962-1/08-22/0533

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

17 Disember 2020/

17 December 2020

Lakaran Ceria Sdn. Bhd.

20013-1/12-2022/0789

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

17 Disember 2020/

17 December 2020

PJD Eastern Land Sdn. Bhd.

8555-9/04-2021/0319

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

25 Januari 2021/

25 January 2021

P.U. (A) 373 57

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Shah Alam 2 Sdn. Bhd.

8104-28/11-2022/0764

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

25 Januari 2021/

25 January 2021

P.U. (A) 373 58

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

City Centrepoint Sdn. Bhd.

19067-2/01-2023/51

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

27 Januari 2021/

27 January 2021

Platinum Victory

Development Sdn. Bhd.

9832-9/10-2022/0669

(a)

Fasal 34 mengenai Penyerahhakan dipinda bagi PJB dalam Jadual H/

Clause 34 on Assigment is amended for S&P in Schedule H

(b)

Peruntukan baharu fasal 37

dimasukkan yang berhubungan dengan terma moratorium/

A new provision clause 37 is inserted relating to the term of moratorium

26 Februari 2021/

26 February 2021

Vibrantline Sdn. Bhd.

14308-3/01-2023/69

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

1 Mac 2021/

1 March 2021

P.U. (A) 373 59

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Sunrise Alliance Sdn. Bhd.

20047-1/02-2023/0124

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession 1 Mac 2021/

1 March 2021

P.U. (A) 373 60

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date and completion of common facilities for S&P in Schedule H

Kirana Kemajuan Sdn. Bhd.

12409-3/03-2023/0243

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

23 Mac 2021/

23 March 2021

P.U. (A) 373 61

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Enso Development

Sdn. Bhd.

20059-1/02-2023/0170

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

24 Mac 2021/

24 March 2021

P.U. (A) 373 62

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Sime Darby Property

(KLGCC Resort) Sdn. Bhd.

20060-1/03-2023/0175

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

24 Mac 2021/

24 March 2021

P.U. (A) 373 63

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Ivory Interpoint Sdn. Bhd.

20084-1/03-2023/0280

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

1 April 2021/

1 April 2021

Dolomite Homes Sdn. Bhd.

20086-1/03-2023/0284

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

2 April 2021/

2 April 2021

P.U. (A) 373 64

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Quantum Density Sdn. Bhd.

20082-1/03-2023/0276

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

8 April 2021/

8 April 2021

P.U. (A) 373 65

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

GLM Emerald Hills (Cheras)

Sdn. Bhd.

14068-2/10-2021/0973

Jadual

Suggest a correction

Jadual Ketiga (Jadual Pembayaran Harga

Beli) dipinda dalam butiran 2(e) bagi S&P dalam Jadual H/

The Third Schedule (Schedule of Payment of

Purchase Price) is amended in item 2(e) for

S&P in Schedule H

13 April 2021/

13 April 2021

Opti Vega Sdn. Bhd.

20081-1/03-2023/0270

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession for S&P in

Jadual

Suggest a correction

Schedule G

5 Mei 2021/

5 May 2021

Ideal Capital Venture

Sdn. Bhd.

20091-1/04-2023/0296

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

5 Mei 2021/

5 May 2021

P.U. (A) 373 66

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Grenepark Village Sdn. Bhd.

20080-01/03-2023/0265

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

5 Mei 2021/

5 May 2021

Solaris Prestasi Sdn. Bhd.

19537-3/03-2023/0281

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

5 Mei 2021/

5 May 2021

Pencala Jaya Sdn. Bhd.

19164-2/03-2023/0198

Fasal 24 dipinda bagi melanjutkan masa penyerahan milikan kosong bagi PJB dalam

Jadual

Suggest a correction

Jadual G/

Clause 24 is amended to extent the time for the delivery of vacant possession for S&P in

Jadual

Suggest a correction

Schedule G

5 Mei 2021/

5 May 2021

P.U. (A) 373 67

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

NCT Green City Sdn. Bhd.

20105-1/04-2023/0367

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

05 Mei 2021/

05 May 2021

P.U. (A) 373 68

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

JKG Central Park Sdn. Bhd.

14682-2/04-2023/0339

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

24 Mei 2021/

24 May 2021

Skysanctuary Development

Sdn. Bhd.

20093-1/04-2023/0304

(a)

Perenggan 6

Mukadimah

PJB

Jadual

Suggest a correction

Schedule H is amended

(b)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

25 Mei 2021/

25 May 2021

P.U. (A) 373 69

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(d)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

(e)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

The Sixth Schedule is inserted as a brief summary of the purchase unit

One JSI Development Sdn.

Bhd.

14069-2/03-2023/0282

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession 8 Jun 2021/

8 June 2021

P.U. (A) 373 70

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date and completion of common facilities for S&P in Schedule H

Beverly WM Sdn. Bhd.

14347-4/05-2023/0485

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)/

15 Jun 2021/

15 June 2021

P.U. (A) 373 71

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Binastra Land Sdn. Bhd.

9795-6/06-2023/0510

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

25 Jun 2021/

25 June 2021

P.U. (A) 373 72

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Astrum Ampang Sdn. Bhd.

11590-3/07-2023/0537

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

6 Julai 2021/

6 July 2021

Exsim Macalister Sdn. Bhd.

20135-1/07-2023/0549

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

16 Julai 2021/

16 July 2021

Solaris Prestasi Sdn. Bhd.

19537-3/03-2023/0281

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

3 Ogos 2021/

3 August 2021

P.U. (A) 373 73

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda bagi memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Ideal Capital Venture

Sdn. Bhd.

20091-1/04-2023/0296

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

3 Ogos 2021/

3 August 2021

P.U. (A) 373 74

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

JKG Central Park Sdn. Bhd.

14682-2/04-2023/0339

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

3 Ogos 2021/

3 August 2021

Titian Sama Sdn. Bhd.

19122-2/07-2023/0580

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession 3 Ogos 2021/

3 August 2021

P.U. (A) 373 75

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date and completion of common facilities for S&P in Schedule H

Aspect Potential Sdn. Bhd.

10139-3/07-2023/0586

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

3 Ogos 2021/

3 August 2021

Prousaha (M) Sdn. Bhd.

19969-1/08-2022/0561

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga

Beli)

dipinda dalam butiran 2(e)/

3 Ogos 2021/

3 August 2021

P.U. (A) 373 76

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in item 2(e)

PLB Land Sdn. Bhd.

8139-4/12-2021/01273

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dpinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) of

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

3 Ogos 2021/

3 August 2021

Khoo Soon Lee Realty

Sdn. Bhd.

3390-71/4-2023/0388

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession 3 Ogos 2021/

3 August 2021

P.U. (A) 373 77

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date and completion of common facilities for S&P in Schedule H

Khoo Soon Lee Realty

Sdn. Bhd.

3390-67/07-2022/0397

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

3 Ogos 2021/

3 August 2021

Khoo Soon Lee Realty

Sdn. Bhd.

3390-68/07-2022/0398

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

3 Ogos 2021/

3 August 2021

Astrum Ampang Sdn. Bhd.

11590-4/07-2023/0571

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

5 Ogos 2021/

5 August 2021

P.U. (A) 373 78

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

Grand Place Development

Sdn. Bhd.

20140-1/07-2023/0559

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

17 Ogos 2021/

17 August 2021

P.U. (A) 373 79

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Solusi Kelana Sdn. Bhd.

20031-1/01-2023/18

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

17 Ogos 2021/

17 August 2021

Nova Land Development

Sdn. Bhd.

20018-1/12-2022/0818

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

17 Ogos 2021/

17 August 2021

P.U. (A) 373 80

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Lake City Development

Sdn. Bhd.

20110-1/05-2023/0399

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

17 Ogos 2021/

17 August 2021

Picoland Sdn. Bhd.

20153-1/08-2023/0629

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan 1 September 2021/

1 September 2021

P.U. (A) 373 81

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Grenepark Village Sdn. Bhd.

20080-1/03-2023/0265

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

29 September 2021/

29 September 2021

P.U. (A) 373 82

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

BRDB Developments

Sdn. Bhd.

32-15/08-2023/0615

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

30 September 2021/

30 September 2021

P.U. (A) 373 83

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Riveria City Sdn. Bhd.

19929-1/06-2022/0382

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

30 September 2021/

30 September 2021

Amber Homes Land Sdn.

Bhd.

20150-1/08-2023/0614

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

8 Oktober 2021/

8 October 2021

P.U. (A) 373 84

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Fasal 34 Penyerahhakan dipinda/

Clause 34 of Assignment is amended

(c)

Peruntukan baharu fasal 37

dimasukkan yang berhubungan dengan terma moratorium /

A new provision clause 37 is inserted relating to the term of moratorium

Picoland Sdn. Bhd.

20153-1/08-2023/0629

(a)

Fasal 34 Penyerahhakan dipinda bagi PJB dalam Jadual H/

Clause 34 of Assignment is amended for S&P in Schedule H

(b)

Peruntukan baharu fasal 37

dimasukkan yang berhubungan dengan terma moratorium /

A new provision clause 37 is inserted relating to the term of moratorium

8 Oktober 2021/

8 October 2021

P.U. (A) 373 85

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Utuh Aspirasi Sdn. Bhd.

20162-1/09-2023/0687

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

8 Oktober 2021/

8 October 2021

Butirjaya Maxim

Development Sdn. Bhd.

20169-1/10-2023/0718

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

12 Oktober 2021/

12 October 2021

P.U. (A) 373 86

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Senandung Raya Sdn. Bhd.

20049-1/02-2023/0126

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

14 Oktober 2021/

14 October 2021

Damansara Peak Sdn. Bhd.

20151-1/08-2023/0617

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

14 Oktober 2021/

14 October 2021

P.U. (A) 373 87

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Sime Darby Property (Ara

Damansara) Sdn. Bhd.

7277-26/09-2023/0675

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

14 Oktober 2021/

14 October 2021

P.U. (A) 373 88

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

BRDB Developments Sdn.

Bhd.

32-15/08-2023/0615

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

14 Oktober 2021/

14 October 2021

Paramount Property

(Cityview) Sdn. Bhd.

20172-1/10-2023/0731

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) hingga 2(f) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) to 2(f) for S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

22 Oktober 2021/

22 October 2021

P.U. (A) 373 89

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Seloka Sinaran Sdn. Bhd.

19533-4/11-2023/0792

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

25 Oktober 2021/

25 October 2021

Sunway PKNS Sdn. Bhd.

6209-23/09-2023/0663

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

8 November 2021/

8 November 2021

Sunway Artessa Sdn. Bhd.

19676-2/11-2023/0793

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of 9 November 2021/

9 November 2021

P.U. (A) 373 90

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

(d)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

The Sixth Schedule is inserted as a brief summary of the purchase unit

(e)

Fasal 35 dipinda bagi memasukkan perkataan “Jadual Keenam”/

Clause 35 is amended to insert the words “ Sixth Schedule”

P.U. (A) 373 91

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Hillstrand Development

Sdn. Bhd.

14016-6/07-2023/0539

Fasal 35 dipinda yang berhubungan dengan

Sekatan

Urusniaga

Semasa

Tempoh

Moratorium bagi

PJB dalam

Jadual

Suggest a correction

Jadual H/

Clause 35 is amended relating to the

Restriction on Dealings during Moratorium

Period for S&P in Schedule H

10 November 2021/

10 November 2021

CPI City Sdn. Bhd.

20179-1/11-2023/0795

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga

Beli)

dipinda dalam butiran 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in item 2(e)

11 November 2021/

11 November 2021

P.U. (A) 373 92

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Next Delta Sdn. Bhd.

20185-1/11-2023/0837

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

23 November 2021/

23 November 2021

P.U. (A) 373 93

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Black Lotus Development

Sdn. Bhd.

20198-1/12-2023/0899

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

9 Disember 2021/

9 December 2021

Persada Mentari Sdn. Bhd.

20199-1/12-2023/0910

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

16 Disember 2021/

16 December 2021

Sunny Uptown Sdn. Bhd.

10697-4/12-2023/0919

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

16 Disember 2021/

16 December 2021

P.U. (A) 373 94

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Sunway PKNS Sdn. Bhd.

6209-23/09-2023/0663

(a)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e) bagi PJB dalam

Jadual

Suggest a correction

Jadual H/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e) for

S&P in Schedule H

(b)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

(c)

Jadual Keenam dimasukkan sebagai ringkasan unit pembelian/

The Sixth Schedule is inserted as a brief summary of the purchase unit

(d)

Fasal 35 dipinda bagi memasukkan perkataan “Jadual Keenam”/

Clause 35 is amended by inserting the words “Sixth Schedule”

21 Disember 2021/

21 December 2021

P.U. (A) 373 95

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Aset Kayamas Sdn. Bhd.

13811-3/12-2023/0938

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

22 Disember 2021/

22 December 2021

P.U. (A) 373 96

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

Faithview Ambience

Sdn. Bhd.

20161-1/09-2023/0682

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for S&P in Schedule H

23 Disember 2021/

23 December 2021

LTS Skyline Sdn. Bhd.

20209-1/12-2023/0959

(a)

Fasal 25 dan 29 dipinda bagi melanjutkan masa penyerahan milikan kosong dan penyiapan kemudahan bersama bagi

PJB dalam Jadual H/

Clauses 25 and 29 are amended to extent the time for the delivery of vacant possession and completion of common facilities for

Jadual

Suggest a correction

Schedule H

(b)

Jadual Ketiga (Jadual Pembayaran

Harga Beli) dipinda dalam butiran 2(b) dan 2(e)/

The Third Schedule (Schedule of

Payment of Purchase Price) is amended in items 2(b) and 2(e)

29 Disember 2021/

29 December 2021

P.U. (A) 373 97

(1)

Nama Pemaju Perumahan/

Name of Housing Developer

(2)

Nombor Lesen Pemaju Perumahan/

Housing Developer’s License Number

(3)

Fasal Kontrak Seragam/

Clause of Uniform Contract

(4)

Tarikh/

Date

(c)

Subfasal 3(4)

dipinda dengan memasukkan perkataan “2(b)(i),

2(b)(ii) dan 2(c)”/

Subclause 3(4) is amended by inserting the words “2(b)(i), 2(b)(ii)

and 2(c)”

Dibuat 17 Mei 2023

Made 17 May 2023

[KPKT/PUU/(S)/8/01; PN(PU2)31/XVII]

NGA KOR MING

Menteri Pembangunan Kerajaan Tempatan/

Minister of Local Government Development

Common questions

What is PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023?
PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 is Malaysia P.U. (A), cited as P.U. (A) 373 2023, currently marked in force and first recorded in 2023.
Is PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 still in force?
Yes — PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 is currently in force.
When did PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 take effect?
PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 was first recorded in 2023.
How many schedules does PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 have?
PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 contains 92 schedules.
Where can I read the official version of PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023?
The official text of PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 is published at lom.agc.gov.my.
PERINTAH PEMAJUAN PERUMAHAN (KAWALAN DAN PELESENAN) (PENGECUALIAN) 2023 (No. 373)