/akn/my/act/pua/2016/176

PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2016
Sections
6

Quick answer

About this p.u. (a)

PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 is Malaysia P.U. (A), cited as P.U. (A) 176 2016, currently marked in force and first recorded in 2016.

Opening note

Preamble

Suggest a correction
  1. BAHAWASANYA melalui P.U. (B) 269/2016 yang disiarkan pada 2 Jun 2016, notis telah diberikan mengenai niat untuk membuat suatu perintah di bawah seksyen 70 Akta Pengangkutan Jalan 1987 [Akta 333]: DAN BAHAWASANYA tiada apa-apa bantahan yang diterima oleh Menteri Kerja Raya terhadap pembuatan perintah itu: MAKA OLEH YANG DEMIKIAN, pada menjalankan kuasa yang diberikan oleh seksyen 70 Akta itu, Menteri Kerja Raya, setelah memberi pertimbangan kepada perkara yang disebut dalam subseksyen 70(2) Akta itu, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Jadual

Suggest a correction

Jadual Pertama sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua, melainkan di atas jalan yang dinyatakan dalam ruang (2) Jadual Pertama, bagi tempoh yang dinyatakan dalam ruang (3) Jadual Pertama dilarang.

P.U. (A) 176 3

Jadual

Suggest a correction

JADUAL PERTAMA

(3)

Tempoh larangan

18 Jun 2016 hingga 15 September 2016

16 September 2016

hingga 31 Disember 2016

(1)

Jalan yang baginya larangan terpakai

1.

Jambatan darat kilometer 3.1

hingga kilometer 2.8 arah timur

(Batu Maung ke Batu

Kawan)

yang menghubungkan

Jambatan Sultan Abdul

Halim Mu’adzam Shah dengan

Lebuh

Raya

Juru-Jalan

Duta-Bukit

Raja, Lebuh Raya Utara

Selatan

Hubungan

Tengah dan Lebuh Raya

Kuala

Lumpur-Johor

Bahru sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua

2.

Jambatan darat kilometer 2.8

hingga kilometer 3.1 arah barat

(Batu Kawan ke Batu

Maung)

yang menghubungkan Lebuh

Raya

Juru-Jalan

Duta-Bukit Raja, Lebuh Raya

Utara Selatan Hubungan

Tengah dan Lebuh Raya

Kuala

Lumpur-Johor

Bahru dengan Jambatan

Sultan

Abdul

Halim

Mu’adzam

Shah sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua

(2)

Jalan arah

Kenderaan dari Lebuh Raya

Juru-Jalan Duta-Bukit Raja,

Lebuh Raya Utara Selatan

Hubungan

Tengah dan

Lebuh Raya Kuala Lumpur-Johor Bahru menuju ke arah

Jambatan

Sultan

Abdul

Halim

Mu’adzam

Shah hendaklah menggunakan jalan lencongan sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua

Kenderaan dari Jambatan

Sultan

Abdul

Halim

Mu’adzam Shah menuju ke arah Lebuh Raya Juru-Jalan

Duta-Bukit

Raja,

Lebuh

Raya

Utara

Selatan

Hubungan

Tengah dan

Lebuh Raya Kuala Lumpur-Johor

Bahru hendaklah menggunakan jalan lencongan sebagaimana yang ditunjukkan dalam peta dalam Jadual Kedua

P.U. (A) 176 4

Jadual

Suggest a correction

JADUAL KEDUA

KAWASAN KERJA

a)

PENUTUPAN DUA LORONG KM 3.1 HINGGA KM 2.8 ARAH TIMUR

PERINGKAT 1: 18 JUN 2016 HINGGA 15 SEPTEMBER 2016

c)

PENUTUPAN DUA LORONG KM 3.1 HINGGA KM 2.8 ARAH BARAT

PERINGKAT 2: 16 SEPTEMBER 2016 HINGGA 31 DISEMBER 2016

KAWASAN KERJA

PETUNJUK:

JALAN YANG BAGINYA PERINTAH LARANGAN TERPAKAI

LALUAN LENCONGAN TIDAK MENGIKUT SKALA

P.U. (A) 176 5

Dibuat 17 Jun 2016

[KKR.PUU.110-1/6/15 Jld. 2; PN(PU2)460/LXXXVI]

DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF

Menteri Kerja Raya

P.U. (A) 176 6

ROAD TRANSPORT ACT 1987

ROAD TRANSPORT (PROHIBITION OF USE OF ROAD)

(FEDERAL ROADS) ORDER 2016

WHEAREAS by P.U. (B) 269/2016 published on 2 June 2016, notice was given of the intention to make an order under section 70 of the Road Transport Act 1987 [Act 333]:

AND WHEREAS no objection was received by the Minister of Works against the making of such order:

NOW THEREFORE, in exercise of the powers conferred by section 70 of the Act, the Minister of Works, after taking consideration the matters referred to in subsection 70(2) of the Act, makes the following order:

Citation and commencement 1.

(1)

This order may be cited as the

Road

Transport

(Prohibition of Use of Road) (Federal Roads) Order 2016.

(2)

This Order comes into operation on 18 June 2016.

Prohibition 2.

The driving of vehicles on the part of the road as specified in column (1) of the

First Schedule as shown on the map in the Second Schedule, otherwise than on the routes specified in column (2) of the First Schedule, for the period specified in column (3) of the First Schedule is prohibited.

P.U. (A) 176 7

FIRST SCHEDULE

(1)

Road to which prohibition applies

1.

Land bridge kilometre 3.1 to kilometre 2.8

east bound

(Batu

Maung to Batu Kawan)

which connects the

Jambatan Sultan Abdul

Halim Mu’adzam Shah with Juru-Jalan Duta-Bukit Raja Expressway,

North

South

Expressway

Central

Link and

Kuala

Lumpur-Johore Bahru

Expressway as shown on the map in the

Second Schedule

2.

Land bridge kilometre 2.8 to kilometre 3.1

west bound

(Batu

Kawan to Batu Maung)

which connects the

Juru-Jalan

Duta-Bukit

Raja Expressway, North

South

Expressway

Central Link and Kuala

Lumpur-Johore Bahru

Expressway with

Jambatan Sultan Abdul

Halim Mu’adzam Shah as shown on the map in the Second Schedule

(2)

Routes

Vehicles from the

Juru-Jalan

Duta-Bukit

Raja Expressway, North

South

Expressway

Central Link and Kuala

Lumpur-Johore

Bahru

Expressway to Jambatan

Sultan

Abdul

Halim

Mu’adzam Shah shall use the diverted route as shown on the map in the

Second Schedule

Vehicles from the

Jambatan Sultan Abdul

Halim Mu’adzam Shah to

Juru-Jalan

Duta-Bukit

Raja Expressway, North

South

Expressway

Central Link and Kuala

Lumpur-Johore

Bahru

Expressway shall use the diverted route as shown on the map in the Second

Jadual

Suggest a correction

(3)

Prohibition period

18 June 2016 to 15

September 2016

16 September 2016

to 31

December 2016

P.U. (A) 176 8

SECOND SCHEDULE

WORKING AREA

a)

DUAL CARRIAGEWAY CLOSURE KM 3.1 TO KM 2.8 EAST BOUND

STAGE 1: 18 JUNE 2016 TO 15 SEPTEMBER 2016

LEGEND:

ROAD TO WHICH PROHIBITION ORDER IS APPLICABLE

DIVERSION NOT AS PER SCALE b)

DUAL CARRIAGEWAY CLOSURE KM 3.1 TO KM 2.8 WEST BOUND

STAGE 2: 16 SEPTEMBER 2016 TO 31 DECEMBER 2016

WORKING AREA

P.U. (A) 176 9

Made 17 June 2016

[KKR.PUU.110-1/6/15 Jld. 2;PN(PU2)460/LXXXVI]

DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF

Minister of Works

Common questions

What is PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016?
PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 is Malaysia P.U. (A), cited as P.U. (A) 176 2016, currently marked in force and first recorded in 2016.
Is PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 still in force?
Yes — PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 is currently in force.
When did PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 take effect?
PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 was first recorded in 2016.
How many schedules does PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 have?
PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 contains 4 schedules.
Where can I read the official version of PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016?
The official text of PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 is published at lom.agc.gov.my.
PERINTAH PENGANGKUTAN JALAN (LARANGAN PENGGUNAAN JALAN) (JALAN PERSEKUTUAN) 2016 (No. 176)