/akn/my/act/pua/2020/289

PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2020
Sections
20

Quick answer

About this p.u. (a)

PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 is Malaysia P.U. (A), cited as P.U. (A) 289 2020, currently marked in force and first recorded in 2020.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan di bawah seksyen 27 Akta Perkhidmatan Bomba 1988 [Akta 341], Ketua Pengarah membuat perintah yang berikut: Nama

Seksyen 1

Perintah ini bolehlah dinamakan

Open as pageSuggest a correction

Perintah

Perkhidmatan

Bomba

(Premis Ditetapkan) (Pindaan) 2020.

Seksyen 2

Penggantian Jadual

Open as pageSuggest a correction

dipinda dengan menggantikan Jadual dengan jadual yang berikut:

P.U. (A) 289 3

“ JADUAL

PREMIS DITETAPKAN

Premis yang

Ditetapkan

Opening note

Preamble

Suggest a correction
  1. Mengikut Kegunaan Saiz Tempat

Seksyen 1

Perpustakaan 2000 meter persegi dan lebih (keluasan jumlah lantai)

Suggest a correction

Seluruh

(i)

2000 meter persegi dan lebih (keluasan jumlah lantai)

Suggest a correction

(i)

Koridor terbuka —100 bilik dan lebih bagi setiap blok

Suggest a correction

(a)

2 tingkat hingga 3 tingkat dengan 101

bilik dan lebih

Suggest a correction

(b)

4 tingkat dan ke atas dengan 51 bilik dan lebih

Seluruh

Malaysia

Suggest a correction

(i)

Koridor terbuka — 10 tingkat dan ke atas atau 5000 meter persegi dan lebih (keluasan jumlah lantai)

Suggest a correction

(ii)

Reka bentuk lain — 6 tingkat dan ke atas atau 3000 meter persegi dan lebih (keluasan jumlah lantai)

Seluruh

Malaysia

Suggest a correction

Seksyen 5

Pejabat

Open as pageSuggest a correction

Ketinggian 30 meter dan ke atas atau 10,000

meter persegi dan lebih (keluasan jumlah lantai)

Seluruh

(i)

1 tingkat — 2000 meter persegi dan lebih

(keluasan jumlah lantai) yang dipasang dengan sistem semburan automatik

Seluruh

Malaysia

P.U. (A) 289 4

Premis yang

Ditetapkan

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. Mengikut Kegunaan Saiz Tempat

(ii)

2 tingkat dan ke atas — 2000 meter persegi dan lebih (keluasan jumlah lantai) yang dipasang dengan sistem semburan automatik

Suggest a correction

(i)

Bangunan di bawah aras pelepasan diri 1000 meter persegi dan lebih (keluasan jumlah lantai)

Suggest a correction

(ii)

Tempat perhimpunan 2000 meter persegi dan lebih (keluasan jumlah lantai)

Seluruh

Malaysia

Suggest a correction

(i)

Tempat letak kereta bawah tanah 2000

meter persegi dan lebih (keluasan jumlah lantai)

yang dipasang dengan sistem semburan automatik

Suggest a correction

(ii)

1,000 meter persegi dan lebih (keluasan jumlah lantai) atau 7,000 meter padu dan lebih, yang dipasang dengan sistem semburan automatik

Seluruh

Malaysia

Dibuat 28 September 2020

[KPKT/PUU(R)/8/11 Jld. 2; PN(PU2)471/VI]

DATO’ SRI MOHAMMAD HAMDAN BIN HJ. WAHID

Jabatan Bomba dan Penyelamat Malaysia

.”

P.U. (A) 289 5

FIRE SERVICES ACT 1988

FIRE SERVICES (DESIGNATED PREMISES) (AMENDMENT) ORDER 2020

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 27 of the Fire Services Act 1988 [Act 341], the Director General makes the following order: Citation 1. This order may be cited as the Fire Services (Designated Premises) (Amendment) Order 2020. Substitution of Schedule 2. The Fire Services (Designated Premises) Order 1998 [P.U. (A) 276/1998] is amended by substituting for the Schedule the following schedule: P.U. (A) 289 6 “ SCHEDULE DESIGNATED PREMISES Designated Premises According to Use Size Location

Seksyen 1

Libraries

Suggest a correction

2000 square metres and over (total floor area)

Throughout

(i)

Open corridor — 100 rooms and over for each block

Suggest a correction

(b)

4 storeys and above with 51 rooms and over

Throughout

Malaysia

Suggest a correction

(i)

Open corridor — 10 storeys and above or 5000 square metres and over (total floor area)

Suggest a correction

(ii)

Other design — 6 storeys and above or 3000 square metres and over (total floor area)

Throughout

Malaysia

Suggest a correction

Seksyen 5

Offices

Suggest a correction

30 metres and above in height or 10,000 square metres and over (total floor area)

Throughout

Seksyen 6

Malaysia

Suggest a correction

3000 square metres and over (total floor area)

Throughout

(i)

Single storey — 2000 square metres and over (total floor area) where the automatic sprinkler systems are installed

Suggest a correction

(ii)

2 storeys and above —2000 square metres and over (total floor area) where the

Throughout

Malaysia

P.U. (A) 289 7

Designated

Premises

According to Use

Size

Location automatic sprinkler systems are installed

Suggest a correction

(i)

Building below level of exit discharge of 1000 square metres and over (total floor area)

Suggest a correction

(ii)

Place of assembly of 2000 square metres and over (total floor area)

Throughout

Malaysia

Suggest a correction

(i)

Underground car park of 2000 square metres and over (total floor area) where the automatic sprinkler systems are installed

Suggest a correction

(ii)

1,000 square metres and over (total floor area) or 7,000 cubic metres and over, where the automatic sprinkler systems are installed

Throughout

Malaysia

Made 28 September 2020

[KPKT/PUU(R)/8/11 Jld. 2; PN(PU2)471/VI]

DATO’ SRI MOHAMMAD HAMDAN BIN HJ. WAHID

Director General of

Fire and Rescue Department

.”

Suggest a correction

Common questions

What is PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020?
PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 is Malaysia P.U. (A), cited as P.U. (A) 289 2020, currently marked in force and first recorded in 2020.
Is PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 still in force?
Yes — PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 is currently in force.
When did PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 take effect?
PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 was first recorded in 2020.
How many sections does PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 have?
PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 contains 20 sections.
Where can I read the official version of PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020?
The official text of PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 is published at lom.agc.gov.my.
PERINTAH PERKHIDMATAN BOMBA (PREMIS DITETAPKAN) (PINDAAN) 2020 (No. 289)