Malaysia legislation
Section 0
Seksyen 0
7424
10 years 0%”;
P.U. (A) 222 7
(b)
by inserting after subitem (b)(i) and the particulars relating to it the following subitem and particulars:
First
Column
Second Column
Third
Column
Fourth Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a)
above—
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
“(ia) use as installations in building or building structures (B40
individual under MySuria
Programme)
+ 0.1395
10 years 0%”;
(c)
by inserting after subitem (b)(ii) and the particulars relating to it the following subitem and particulars:
First
Column
Second Column
Third Column
Fourth Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a) above—
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
“(iia) use as building materials individual under MySuria
Programme)
+ 0.1060
10 years 0%”; and
P.U. (A) 222 8
(d)
by inserting after subitem (b)(iii) and the particulars relating to it the following subitem and particulars:
First
Column
Second Column
Third
Column
Fourth Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a)
above—
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
“(iiia)
use of solar photovoltaic modules manufactured or assembled in
Malaysia individual under MySuria
Programme)
+ 0.05 10 years 0%”.
Made 27 July 2017
[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Minister of Energy, Green Technology and Water