/akn/my/act/pua/2013/374

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2013
Sections
24

Quick answer

About this p.u. (a)

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is Malaysia P.U. (A), cited as P.U. (A) 374 2013, currently marked in force and first recorded in 2013.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

(1)

Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu

(Pindaan Jadual) (No. 2) 2013.

Suggest a correction

(2)

Perintah ini mula berkuat kuasa pada 1 Januari 2014.

Penggantian Jadual

Suggest a correction

Seksyen 2

Jadual kepada Akta Tenaga Boleh Baharu 2011 [Akta 725] digantikan dengan

Open as pageSuggest a correction

Jadual yang berikut:

“JADUAL

(Seksyen 2)

SUMBER BOLEH BAHARU, KADAR TARIF GALAKAN, TEMPOH BERKUAT KUASA DAN

KADAR PENGURANGAN TAHUNAN

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

Biogas

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:

Kadar tarif galakan asas

P.U. (A) 374 3

Suggest a correction

(i)

sehingga dan termasuk 4 megawatt 0.3184 16 tahun 0%

Suggest a correction

(ii)

melebihi 4 megawatt, dan sehingga dan termasuk 10 megawatt 0.2985 16 tahun 0%

Suggest a correction

(iii)

melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt 0.2786 16 tahun 0%

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu atau lebih kriteria yang berikut sebagai tambahan kepada (a) di atas:

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

Suggest a correction

(i)

penggunaan teknologi enjin gas dengan kecekapan elektrik melebihi 40%

+ 0.0199 16 tahun 0%

Suggest a correction

(ii)

penggunaan teknologi enjin gas yang dibuat atau dipasang secara tempatan

+ 0.05 16 tahun 0%

Suggest a correction

(iii)

penggunaan tapak pelupusan, gas kumbahan atau sisa pertanian termasuk sisa haiwan sebagai sumber bahan api

+ 0.0786 16 tahun 0%

Biojisim

Suggest a correction

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:

Kadar tarif galakan asas

Suggest a correction

(i)

sehingga dan termasuk 10 megawatt 0.3085 16 tahun 0%

Suggest a correction

(ii)

melebihi 10

megawatt, dan sehingga dan termasuk 20 megawatt 0.2886 16 tahun 0%

Suggest a correction

(iii)

melebihi 20

megawatt, dan sehingga dan termasuk 30 megawatt

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu atau lebih kriteria yang berikut sebagai tambahan kepada (a) di atas:

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

Suggest a correction

(i)

penggunaan teknologi

+ 0.0199 16 tahun 0%

P.U. (A) 374 4

pengegasan

Suggest a correction

(ii)

penggunaan sistem penjanaan elektrik berasaskan stim dengan kecekapan keseluruhan melebihi 20%

+ 0.01 16 tahun 0%

Suggest a correction

(iii)

penggunaan dandang atau alat pengegas yang dibuat atau dipasang secara tempatan

+ 0.05 16 tahun 0%

Suggest a correction

(iv)

penggunaan sisa pepejal sebagai sumber bahan api

+ 0.0982 16 tahun 0%

Kadar tarif galakan asas

Hidrokuasa kecil

Suggest a correction

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 10 megawatt

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt

Suggest a correction

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:

Kadar tarif galakan asas

Suggest a correction

(ii)

melebihi 4 kilowatt, dan sehingga dan termasuk 12 kilowatt (individu)

Suggest a correction

(iii)

sehingga dan termasuk 4

kilowatt

(bukan individu)

Suggest a correction

(iv)

melebihi 4 kilowatt, dan sehingga dan termasuk 24

kilowatt

(bukan individu)

Suggest a correction

(v)

melebihi 24

kilowatt, dan sehingga dan termasuk 72

kilowatt

(bukan individu)

Suggest a correction

(vi)

melebihi 72

kilowatt, dan sehingga dan termasuk 1 megawatt

(bukan individu)

Suggest a correction

(vii)

melebihi 1

megawatt, dan sehingga dan termasuk 10 megawatt

(bukan individu)

Suggest a correction

(viii)

melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt

(bukan individu)

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu atau lebih kriteria yang berikut sebagai tambahan kepada (a) di atas:

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

Suggest a correction

(i)

penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan

+ 0.2392 21 tahun 10%

Suggest a correction

(ii)

penggunaan sebagai bahan bangunan

+ 0.23 21 tahun 10%

Suggest a correction

(iii)

penggunaan modul fotovolta suria yang dibuat atau dipasang secara tempatan

+ 0.05 21 tahun 0%

Suggest a correction

(iv)

penggunaan alat penyongsang suria yang dibuat atau dipasang secara tempatan

+ 0.05 21 tahun 0%

Kadar tarif galakan asas

Geoterma

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 30 megawatt

-

-

-

Semua pengiraan perantaraan dan kadar tarif galakan dalam ringgit bagi setiap kilowatt jam yang muktamad di bawah Jadual ini hendaklah dibundarkan kepada empat tempat perpuluhan dan jika angka pada tempat perpuluhan yang kelima ialah lima atau lebih, pembundaran hendaklah dengan satu pada tempat perpuluhan yang keempat. ”.

P.U. (A) 374 6

Dibuat 24 Disember 2013

[KeTTHA: BP(S)9/14 Klt. 5; PN(PU2)693/IV]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Menteri Tenaga, Teknologi Hijau dan Air

P.U. (A) 374 7

RENEWABLE ENERGY ACT 2011

RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) (NO. 2) ORDER 2013

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the

Renewable

Energy

(Amendment of Schedule) (No. 2) Order 2013.

Suggest a correction

(2)

This Order comes into operation on 1 January 2014.

Substitution of Schedule 2.

The Schedule to the Renewable Energy Act 2011 [Act 725] is substituted with the following Schedule:

“SCHEDULE

(Section 2)

RENEWABLE RESOURCES, FEED-IN TARIFF RATES, EFFECTIVE PERIOD AND ANNUAL

DEGRESSION RATES

First

Column

Second Column

Third

Column

Fourth Column

Fifth

Column

Renewable resource

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

Biogas

Suggest a correction

(a)

Renewable energy installation having an installed capacity of:

Basic feed-in tariff rate

Suggest a correction

(i)

up to and including 4 megawatts 0.3184 16 years 0%

Suggest a correction

(ii)

above 4 megawatts, and up to and including 0.2985 16 years 0%

P.U. (A) 374 8

10 megawatts

Suggest a correction

(iii)

above 10 megawatts, and up to and including 30 megawatts 0.2786 16 years 0%

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a)

above:

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

Suggest a correction

(i)

use of gas engine technology with electrical efficiency of above 40%

+ 0.0199 16 years 0%

Suggest a correction

(ii)

use of locally manufactured or assembled gas engine technology

+ 0.05 16 years 0%

Suggest a correction

(iii)

use of landfill, sewage gas or agricultural waste including animal waste as fuel source

+ 0.0786 16 years 0%

Biomass

Suggest a correction

(a)

Renewable energy installation having an installed capacity of:

Basic feed-in tariff rate

Suggest a correction

(i)

up to and including 10 megawatts 0.3085 16 years 0%

Suggest a correction

(ii)

above 10 megawatts, and up to and including 20 megawatts 0.2886 16 years 0%

Suggest a correction

(iii)

above 20 megawatts, and up to and including 30 megawatts

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a)

above:

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

Suggest a correction

(i)

use of gasification technology

+ 0.0199 16 years 0%

Suggest a correction

(ii)

use of steam-based electricity generating systems with overall efficiency of above 20%

+ 0.01 16 years 0%

Suggest a correction

(iii)

use of locally manufactured or assembled boiler or

+ 0.05 16 years 0%

P.U. (A) 374 9

gasifier

Suggest a correction

(iv)

use of solid waste as fuel source

+ 0.0982 16 years 0%

Basic feed-in tariff

Small hydropower

Suggest a correction

(a)

Renewable energy installation having an installed capacity of up to and including 10 megawatts

Suggest a correction

(b)

Renewable energy installation having an installed capacity of above 10 megawatts, and up to and including 30 megawatts

Suggest a correction

(a)

Renewable energy installation having an installed capacity of:

Basic feed-in tariff

Suggest a correction

(ii)

above 4 kilowatts, and up to and including 12

kilowatts

(individual)

Suggest a correction

(iii)

up to and including 4

kilowatts

(non-individual)

Suggest a correction

(iv)

above 4 kilowatts, and up to and including 24

kilowatts

(non-individual)

Suggest a correction

(v)

above 24

kilowatts, and up to and including 72

kilowatts

(non-individual)

Suggest a correction

(vi)

above 72

kilowatts, and up to and including 1

megawatt

(non-individual)

Suggest a correction

(vii)

above 1 megawatt, and up to and including 10

megawatts

(non-individual)

Suggest a correction

(viii)

above 10 megawatts, and up to and including 30

megawatts

(non-individual)

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a)

above

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

Suggest a correction

(i)

use as installation in building or building structures

+ 0.2392 21 years 10%

Suggest a correction

(iii)

use of locally manufactured or assembled solar photovoltaic modules

+ 0.05 21 years 0%

Suggest a correction

(iv)

use of locally manufactured or assembled solar inverters

+ 0.05 21 years 0%

Basic feed-in tariff

Geothermal

Renewable energy installation having an installed capacity of up to and including 30 megawatts

-

-

-

All intermediate calculations and the final feed-in tariff rates in ringgit per kilowatt hour under this Schedule shall be rounded to four decimal places and if digit in fifth decimal place is five or greater, the rounding up shall be by one in the fourth decimal place.”.

Made 24 December 2013

[KeTTHA: BP(S)9/14 Klt. 5; PN(PU2)693/IV]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Minister of Energy, Green Technology and Water

Suggest a correction

Common questions

What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is Malaysia P.U. (A), cited as P.U. (A) 374 2013, currently marked in force and first recorded in 2013.
Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 still in force?
Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is currently in force.
When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 take effect?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 was first recorded in 2013.
How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 have?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 contains 24 sections.
Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013?
The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is published at lom.agc.gov.my.
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 (No. 374)