/akn/my/act/pua/2013/374
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
- Type
- P.U. (A)
- Status
- In force
- Enacted
- 2013
- Sections
- 24
Quick answer
About this p.u. (a)
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is Malaysia P.U. (A), cited as P.U. (A) 374 2013, currently marked in force and first recorded in 2013.
Opening note
Preamble
- PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa
(1)
Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu
(Pindaan Jadual) (No. 2) 2013.
Seksyen 2
Jadual kepada Akta Tenaga Boleh Baharu 2011 [Akta 725] digantikan dengan
Jadual yang berikut:
“JADUAL
(Seksyen 2)
SUMBER BOLEH BAHARU, KADAR TARIF GALAKAN, TEMPOH BERKUAT KUASA DAN
KADAR PENGURANGAN TAHUNAN
Ruang
Pertama
Ruang Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
Biogas
(a)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:
Kadar tarif galakan asas
P.U. (A) 374 3
(ii)
melebihi 4 megawatt, dan sehingga dan termasuk 10 megawatt 0.2985 16 tahun 0%
(iii)
melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt 0.2786 16 tahun 0%
(b)
Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu atau lebih kriteria yang berikut sebagai tambahan kepada (a) di atas:
Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas
(i)
penggunaan teknologi enjin gas dengan kecekapan elektrik melebihi 40%
+ 0.0199 16 tahun 0%
(ii)
penggunaan teknologi enjin gas yang dibuat atau dipasang secara tempatan
+ 0.05 16 tahun 0%
(iii)
penggunaan tapak pelupusan, gas kumbahan atau sisa pertanian termasuk sisa haiwan sebagai sumber bahan api
+ 0.0786 16 tahun 0%
Biojisim
(a)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:
Kadar tarif galakan asas
(ii)
melebihi 10
megawatt, dan sehingga dan termasuk 20 megawatt 0.2886 16 tahun 0%
Seksyen 0
2687 16 tahun 0%
(b)
Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu atau lebih kriteria yang berikut sebagai tambahan kepada (a) di atas:
Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas
(ii)
penggunaan sistem penjanaan elektrik berasaskan stim dengan kecekapan keseluruhan melebihi 20%
+ 0.01 16 tahun 0%
(iii)
penggunaan dandang atau alat pengegas yang dibuat atau dipasang secara tempatan
+ 0.05 16 tahun 0%
(iv)
penggunaan sisa pepejal sebagai sumber bahan api
+ 0.0982 16 tahun 0%
Kadar tarif galakan asas
Hidrokuasa kecil
(a)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 10 megawatt
Seksyen 0
24 21 tahun 0%
(b)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt
Seksyen 0
23 21 tahun 0%
Fotovolta suria
(a)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:
Kadar tarif galakan asas
Seksyen 1
1316 21 tahun 10%
Seksyen 1
1040 21 tahun 10%
Seksyen 1
1316 21 tahun 10%
Seksyen 1
1040 21 tahun 10%
Seksyen 0
9440 21 tahun 10%
Seksyen 0
9120 21 tahun 10%
P.U. (A) 374 5
Seksyen 0
76 21 tahun 10%
(viii)
melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt
(bukan individu)
Seksyen 0
68 21 tahun 10%
(b)
Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu atau lebih kriteria yang berikut sebagai tambahan kepada (a) di atas:
Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas
(i)
penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan
+ 0.2392 21 tahun 10%
(iii)
penggunaan modul fotovolta suria yang dibuat atau dipasang secara tempatan
+ 0.05 21 tahun 0%
(iv)
penggunaan alat penyongsang suria yang dibuat atau dipasang secara tempatan
+ 0.05 21 tahun 0%
Kadar tarif galakan asas
Geoterma
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 30 megawatt
-
-
-
Semua pengiraan perantaraan dan kadar tarif galakan dalam ringgit bagi setiap kilowatt jam yang muktamad di bawah Jadual ini hendaklah dibundarkan kepada empat tempat perpuluhan dan jika angka pada tempat perpuluhan yang kelima ialah lima atau lebih, pembundaran hendaklah dengan satu pada tempat perpuluhan yang keempat. ”.
P.U. (A) 374 6
Dibuat 24 Disember 2013
[KeTTHA: BP(S)9/14 Klt. 5; PN(PU2)693/IV]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Menteri Tenaga, Teknologi Hijau dan Air
P.U. (A) 374 7
RENEWABLE ENERGY ACT 2011
RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) (NO. 2) ORDER 2013
Opening note
Preamble
- IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.
(1)
This order may be cited as the
Renewable
Energy
(Amendment of Schedule) (No. 2) Order 2013.
(2)
This Order comes into operation on 1 January 2014.
Substitution of Schedule 2.
The Schedule to the Renewable Energy Act 2011 [Act 725] is substituted with the following Schedule:
“SCHEDULE
(Section 2)
RENEWABLE RESOURCES, FEED-IN TARIFF RATES, EFFECTIVE PERIOD AND ANNUAL
DEGRESSION RATES
First
Column
Second Column
Third
Column
Fourth Column
Fifth
Column
Renewable resource
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
Biogas
(a)
Renewable energy installation having an installed capacity of:
Basic feed-in tariff rate
(ii)
above 4 megawatts, and up to and including 0.2985 16 years 0%
P.U. (A) 374 8
10 megawatts
(iii)
above 10 megawatts, and up to and including 30 megawatts 0.2786 16 years 0%
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a)
above:
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
(i)
use of gas engine technology with electrical efficiency of above 40%
+ 0.0199 16 years 0%
(ii)
use of locally manufactured or assembled gas engine technology
+ 0.05 16 years 0%
(iii)
use of landfill, sewage gas or agricultural waste including animal waste as fuel source
+ 0.0786 16 years 0%
Biomass
(a)
Renewable energy installation having an installed capacity of:
Basic feed-in tariff rate
Seksyen 0
2687 16 years 0%
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a)
above:
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+ 0.01 16 years 0%
(iii)
use of locally manufactured or assembled boiler or
+ 0.05 16 years 0%
P.U. (A) 374 9
gasifier
(iv)
use of solid waste as fuel source
+ 0.0982 16 years 0%
Basic feed-in tariff
Small hydropower
(a)
Renewable energy installation having an installed capacity of up to and including 10 megawatts
Seksyen 0
24 21 years 0%
(b)
Renewable energy installation having an installed capacity of above 10 megawatts, and up to and including 30 megawatts
Seksyen 0
23 21 years 0%
Solar photovoltaic
(a)
Renewable energy installation having an installed capacity of:
Basic feed-in tariff
Seksyen 1
1316 21 years 10%
Seksyen 1
1040 21 years 10%
Seksyen 1
1316 21 years 10%
Seksyen 1
1040 21 years 10%
Seksyen 0
9440 21 years 10%
Seksyen 0
9120 21 years 10%
Seksyen 0
76 21 years 10%
Seksyen 0
68 21 years 10%
P.U. (A) 374 10
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a)
above
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
(iii)
use of locally manufactured or assembled solar photovoltaic modules
+ 0.05 21 years 0%
(iv)
use of locally manufactured or assembled solar inverters
+ 0.05 21 years 0%
Basic feed-in tariff
Geothermal
Renewable energy installation having an installed capacity of up to and including 30 megawatts
-
-
-
All intermediate calculations and the final feed-in tariff rates in ringgit per kilowatt hour under this Schedule shall be rounded to four decimal places and if digit in fifth decimal place is five or greater, the rounding up shall be by one in the fourth decimal place.”.
Made 24 December 2013
[KeTTHA: BP(S)9/14 Klt. 5; PN(PU2)693/IV]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Minister of Energy, Green Technology and Water
Common questions
- What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013?
- PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is Malaysia P.U. (A), cited as P.U. (A) 374 2013, currently marked in force and first recorded in 2013.
- Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 still in force?
- Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is currently in force.
- When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 take effect?
- PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 was first recorded in 2013.
- How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 have?
- PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 contains 24 sections.
- Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013?
- The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2013 is published at lom.agc.gov.my.