Seksyen 1
(2)
Kaedah-Kaedah ini mula berkuat kuasa pada 1 Januari 2021.
Kaedah baharu 11a dan 11b
/akn/my-05/state_gazette/unknown/nsgn24y2020/no-541
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
KAEDAH-KAEDAH HAKMILIK STRATA NEGERI SEMBILAN (PINDAAN) 2020 is Malaysia State Subsidiary Legislation, cited as State Subsidiary Legislation No. 541, currently marked in force.
Opening note
Kaedah-Kaedah ini mula berkuat kuasa pada 1 Januari 2021.
Kaedah baharu 11a dan 11b
Kaedah-Kaedah Hakmilik Strata Negeri Sembilan 2016 [N.S. P.U. 2/2016], yang disebut “Kaedah-Kaedah ibu” dalam Kaedah-Kaedah ini, dipinda dengan memasukkan selepas kaedah 11 kaedah yang berikut:
“Cukai bagi petak atau blok sementara
Cukai bagi sesuatu petak atau blok sementara di bawah subseksyen 23c(1) Akta adalah sebagaimana yang ditetapkan dalam
Jadual VI dan Jadual VII.
[19hb Nov. 2020 1280
Pengiraan cukai bagi petak atau blok sementara yang disebut dalam subkaedah (1) adalah tertakluk kepada skala pengubahan seperti yang berikut:
[(Luas petak utama X kadar bagi petak utama) + (Luas petak aksesori X *kadar bagi petak aksesori)] X **Nisbah kepadatan guna tanah
*Kadar bagi petak aksesori adalah separuh daripada kadar petak utama.
**Nisbah kepadatan =
Luas hakmilik induk guna tanah
Luas keseluruhan petak atau blok sementara
Pihak Berkuasa Negeri boleh mengubah kadar cukai bagi petak atau blok sementara
11b. Pihak Berkuasa Negeri boleh mengubah kadar cukai bagi petak atau blok sementara sebagaimana yang ditetapkan dalam Jadual VI dan
Jadual VII sebagaimana yang difikirkan patut oleh Pihak Berkuasa Negeri.”.
Jadual baharu VI dan VII
3. Kaedah-Kaedah ibu dipinda dengan memasukkan selepas Jadual V Jadual yang berikut:
“
JADUAL VI
AKTA HAKMILIK STRATA 1985
KAEDAH-KAEDAH HAKMILIK STRATA NEGERI SEMBILAN 2016
[Subkaedah 11a(1)]
CUKAI BAGI PETAK ATAU BLOK SEMENTARA BAGI
HAKMILIK PEGANGAN KEKAL
1.
Kediaman
(kos rendah)
10 bagi setiap petak atau blok sementara 10 bagi setiap petak atau blok sementara 10 bagi setiap petak atau blok sementara
Tiada
19hb Nov. 2020]
1281
2.
Kediaman
(selain kos rendah)
0.30/meter persegi bagi setiap petak atau blok sementara 0.25/meter persegi bagi setiap petak atau blok sementara 0.20/meter persegi bagi setiap petak atau blok sementara 15 bagi setiap petak atau blok sementara 3.
Perniagaan 0.60/meter persegi bagi setiap petak atau blok sementara 0.50/meter persegi bagi setiap petak atau blok sementara 0.40/meter persegi bagi setiap petak atau blok sementara 50 bagi setiap petak atau blok sementara 4.
Industri 0.90/meter persegi bagi setiap petak atau blok sementara 0.80/meter persegi bagi setiap petak atau blok sementara 0.70/meter persegi bagi setiap petak atau blok sementara 80 bagi setiap petak atau blok sementara 5.
Pangsapuri servis 0.40/meter persegi bagi setiap petak atau blok sementara 0.35/meter persegi bagi setiap petak atau blok sementara 0.30/meter persegi bagi setiap petak atau blok sementara 35 bagi setiap petak atau blok sementara 6.
Selain di atas 0.60/meter persegi bagi setiap petak atau blok sementara 0.50/meter persegi bagi setiap petak atau blok sementara 0.40/meter persegi bagi setiap petak atau blok sementara 50 bagi setiap petak atau blok sementara
JADUAL VII
AKTA HAKMILIK STRATA 1985
KAEDAH-KAEDAH HAKMILIK STRATA NEGERI SEMBILAN 2016
[Subkaedah 11a(1)]
CUKAI BAGI PETAK ATAU BLOK SEMENTARA BAGI
HAKMILIK PEGANGAN PAJAK
1.
Kediaman
(kos rendah)
8 bagi setiap petak atau blok sementara 8 bagi setiap petak atau blok sementara 8 bagi setiap petak atau blok sementara
Tiada
[19hb Nov. 2020 1282
2.
Kediaman
(selain kos rendah)
0.25/meter persegi bagi setiap petak atau blok sementara 0.20/meter persegi bagi setiap petak atau blok sementara 0.15/meter persegi bagi setiap petak atau blok sementara 13 bagi setiap petak atau blok sementara 3.
Perniagaan 0.50/meter persegi bagi setiap petak atau blok sementara 0.40/meter persegi bagi setiap petak atau blok sementara 0.30/meter persegi bagi setiap petak atau blok sementara 40 bagi setiap petak atau blok sementara 4.
Industri 0.80/meter persegi bagi setiap petak atau blok sementara 0.70/meter persegi bagi setiap petak atau blok sementara 0.60/meter persegi bagi setiap petak atau blok sementara 70 bagi setiap petak atau blok sementara 5.
Pangsapuri servis 0.35/meter persegi bagi setiap petak atau blok sementara 0.30/meter persegi bagi setiap petak atau blok sementara 0.25/meter persegi bagi setiap petak atau blok sementara 30 bagi setiap petak atau blok sementara 6.
Selain di atas 0.50/meter persegi bagi setiap petak atau blok sementara 0.40/meter persegi bagi setiap petak atau blok sementara 0.30/meter persegi bagi setiap petak atau blok sementara 40 bagi setiap petak atau blok sementara
Dibuat 15 April 2020
[PTG.NS 5/136 Klt. 2; PUNS. 100/2/22]
Setiausaha
Majlis Mesyuarat Kerajaan
Negeri Sembilan
19hb Nov. 2020]
1283
In exercise of the powers conferred by section 81 of the Strata Titles Act 1985
[Act 318], the State Authority hereby makes the following rules:
Citation and commencement
1. (1) These rules may be cited as the Negeri Sembilan Strata Titles Rules
(Amendment) 2020.
These Rules shall come into operation on 1 January 2021.
New rules 11a and 11b
2. The Negeri Sembilan Strata Titles Rules 2016 [N.S. P.U. 2/2016], which is referred to as the “principal Rules” in these Rules, are amended by inserting after rule 11 the following rules:
“Rent of parcel or provisional block
11a. (1) The rent of parcel or provisional block under subsection 23c(1)
of the Act shall be prescribed in Schedule VI and Schedule VII.
The calculation of the rent of parcel or provisional block referred to in subrule (1) shall be subjected to the variation scale as follows:
[(Width of main parcel X rate of main parcel) + (Width of accessory parcel X *rate of accessory parcel)] X **Land use density ratio
*Rate of accessory parcel are half of the rate of main parcel.
**Land use =
Width of main titles density ratio
Total width of parcel or provisional block
State Authority may vary rates of the rent of parcel or provisional block
11b. The State Authority may vary the rates of the rent of parcel or provisional block as specified in Schedule VI and Schedule VII as it deems fit.”.
New Schedules VI dan VII
3. The principal Rules are amended by inserting after the Schedule V the following schedules:
[19hb Nov. 2020 1284
“
SCHEDULE VI
STRATA TITLES ACT 1985
NEGERI SEMBILAN STRATA TITLES RULES 2016
[Subrule 11a(1)]
RENT OF PARCEL OR PROVISIONAL BLOCK FOR FREEHOLD TITLE
NO.
EXPRESS
CONDITION OF
PARCEL
DISTRICT OF
OF PORT
AND JEMPOL
OF KUALA
JELEBU AND
RATE
1.
Residential
(low cost)
10 for each parcel or provisional block 10 for each parcel or provisional block 10 for each parcel or provisional block
Nil 2.
Residential
(other than low cost)
0.30/square metre for each parcel or provisional block 0.25/square metre for each parcel or provisional block 0.20/square metre for each parcel or provisional block 15 for each parcel or provisional block 3.
Business 0.60/square metre for each parcel or provisional block 0.50/square metre for each parcel or provisional block 0.40/square metre for each parcel or provisional block 50 for each parcel or provisional block 4.
Industry 0.90/square metre for each parcel or provisional block 0.80/square metre for each parcel or provisional block 0.70/square metre for each parcel or provisional block 80 for each parcel or provisional block 5.
Service apartment 0.40/square metre for each parcel or provisional block 0.35/square metre for each parcel or provisional block 0.30/square metre for each parcel or provisional block 35 for each parcel or provisional block 6.
Other than stated above 0.60/square metre for each parcel or provisional block 0.50/square metre for each parcel or provisional block 0.40/square metre for each parcel or provisional block 50 for each parcel or provisional block
19hb Nov. 2020]
1285
SCHEDULE VII
STRATA TITLES ACT 1985
NEGERI SEMBILAN STRATA TITLES RULES 2016
[subrule 11a(1)]
RENT OF PARCEL OR PROVISIONAL BLOCK FOR LEASEHOLD TITLE
NO.
EXPRESS
CONDITION OF
PARCEL
DISTRICT OF
OF PORT
AND JEMPOL
OF KUALA
JELEBU AND
RATE
1.
Residential
(low cost)
8 for each parcel or provisional block 8 for each parcel or provisional block 8 for each parcel or provisional block
Nil 2.
Residential
(other than low cost)
0.25/square metre for each parcel or provisional block 0.20/square metre for each parcel or provisional block 0.15/square metre for each parcel or provisional block 13 for each parcel or provisional block 3.
Business 0.50/square metre for each parcel or provisional block 0.40/square metre for each parcel or provisional block 0.30/square metre for each parcel or provisional block 40 for each parcel or provisional block 4.
Industry 0.80/square metre for each parcel or provisional block 0.70/square metre for each parcel or provisional block 0.60/square metre for each parcel or provisional block 70 for each parcel or provisional block 5.
Service apartment 0.35/square metre for each parcel or provisional block 0.30/square metre for each parcel or provisional block 0.25/square metre for each parcel or provisional block 30 for each parcel or provisional block 6.
Other than stated above 0.50/square metre for each parcel or provisional block 0.40/square metre for each parcel or provisional block 0.30/square metre for each parcel or provisional block 40 for each parcel or provisional block
Made 15 April 2020
[PTG.NS 5/136 Klt. 2; PUNS/100/2/22]
Clerk of the Executive Council
Negeri Sembilan
[19hb Nov. 2020 1286
No. 542.
AKTA TANAH (KAWASAN PENEMPATAN BERKELOMPOK) 1960
LAND (GROUP SETTLEMENT GROUP AREAS) ACT 1960
[Subseksyen 44(1)]
PEMBERHENTIAN SEBAHAGIAN KAWASAN PENEMPATAN BERKELOMPOK
[Subsection 44(1)]
TERMINATION PART OF A GROUP SETTLEMENT AREA
Pada menjalankan kuasa yang diberikan oleh subseksyen 44(1) Akta Tanah
(Kawasan Penempatan Berkelompok) 1960, [Akta 530] Pihak Berkuasa Negeri setelah berunding dengan menteri, mengisytiharkan bahawa tanah yang dinyatakan dalam Jadual dan ditandakan dengam sempadan berwarna merah di atas
Pelan Warta No. P.W. 395 yang disimpan di Pejabat Pengarah Jabatan Ukur dan Pemetaan, Negeri Sembilan tidak lagi menjadi sebahagian daripada
Kawasan Penempatan Berkelompok yang dikenali sebagai Tanah Rancang
Felda Palong sebagaimana yang diisytiharkan dalam Warta Kerajaan Negeri
Sembilan No. 522 yang disiarkan pada 28 Oktober 1982.
JADUAL
Daerah—Jempol. Mukim—Rompin. No. Pelan Warta—P.W. 395. Keluasan—1426
meter persegi.
Bertarikh 26 Oktober 2020
[PTJL 353/377/97/03;
Setiausaha
PTG.NS. 1/2/7/364;
Majlis Mesyuarat Kerajaan
PU/NS(SW)10]
Negeri Sembilan
In exercise of the powers conferred by subsection 44(1) of the Land (Group
Settlement Areas) Act 1960, [Act 530] the State Authority in consultation with the minister, declares that the land described in the Schedule and delineated by red borders in Gazette Plan No. G.P 395 which are deposited in the Office of the Director of Survey and Mapping, Negeri Sembilan shall cease to be part of the Group Settlement Area known as Felda Palong Land Settlement as declared vide Negeri Sembilan Government Gazette No. 522 published on 28 October 1982.
District—Jempol. Mukim—Rompin. Gazette Plan No.—G.P 395. Area—1426
square metres.
Dated 26 October 2020
[PTJL 353/377/97/03;
Clerk of the Executive Council
PTG.NS. 1/2/7/364;
Negeri Sembilan
PU/NS(SW)10]
19hb Nov. 2020]
1287
KANUN TANAH NEGARA
(Akta 56 tahun 1965)
NATIONAL LAND CODE
(Act 56 of 1965)