Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
- Enacted
- 2012
- Sections
- 3
Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 is Malaysia P.U. (A), cited as P.U. (A) 325 2012, currently marked in force and first recorded in 2012.
Front matterCover and publication detailsOpenClose
WARTA KERAJAAN PERSEKUTUAN
FEDERAL GOVERNMENT
GAZETTE
PERINTAH HAD LAJU KEBANGSAAN (PINDAAN)
(NO. 2) 2012
NATIONAL SPEED LIMIT (AMENDMENT)
(NO. 2) ORDER 2012
DISIARKAN OLEH/
JABATAN PEGUAM NEGARA/
ATTORNEY GENERAL’S CHAMBERS
2
AKTA PENGANGKUTAN JALAN 1987
PERINTAH HAD LAJU KEBANGSAAN (PINDAAN) (NO. 2) 2012
Opening note
Preamble
- PADA menjalankan kuasa yang diberikan oleh subseksyen 69(1) Akta Pengangkutan Jalan 1987 [Akta 333], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa
Seksyen 2
Pindaan Jadual
(1)
Perintah Had Laju Kebangsaan 1989 [P.U. (A) 18/1989] dipinda dalam
Jadual dengan memasukkan selepas butiran 17 butiran yang berikut:
“18. Bahagian jalan yang dikenali sebagai Lebuh Raya Pantai Timur
Fasa 2 yang bermula dari kilometer 303.395 (di koordinat U
Seksyen 249377
2218, T 136811.5933 Grid Cassini Negeri Terengganu)
dan berakhir di kilometer 2.903 di Persimpangan Jalan Kg.
Chabang (di koordinat U 257350.5920, T 147997.3780 Grid
Cassini Negeri Terengganu)”.
(2)
Jalan dengan had laju yang dinyatakan di bawah subperenggan (1)
ditunjukkan dalam peta dalam Jadual.
3
Jadual
JADUAL
[Subperenggan 2(2)]
PETA LEBUH RAYA PANTAI TIMUR-FASA 2
4
Dibuat 3 Oktober 2012
[KKR.PUU.110-1/6/11 Jld. 2; PN(PU2)460/LXVI ]
DATO’ SERI KONG CHO HA
Menteri Pengangkutan
5
ROAD TRANSPORT ACT 1987
NATIONAL SPEED LIMIT (AMENDMENT) (NO. 2) ORDER 2012
IN exercise of the powers conferred by subsection 69(1) of the Road Transport Act 1987
[Act 333], the Minister makes the following order:
Citation and commencement 1.
(1)
This order may be cited as the National Speed Limit (Amendment)
(No. 2) Order 2012.
(2)
This Order comes into operation on 5 October 2012.
Amendment of Schedule 2.
(1)
The National Speed Limit Order 1989 [P.U. (A) 18/1989] is amended in the Schedule by inserting after item 17 the following item:
“18. The part of the road known as the East Coast Expressway Phase 2
commencing from kilometre 303.395
(at coordinates
N 249377.2218, E 136811.5933 of the Terengganu State Cassini
Grid) and ending at kilometre 2.903 at Kg. Chabang Road Junction
(at coordinates N 257350.5920, E 147997.3780 of the Terengganu
State Cassini Grid)”.
The road with the speed limit as specified under subparagraph (1) is shown on the map in the Schedule.
6
Jadual
[Subparagraph 2(2)]
MAP OF EAST COAST EXPRESSWAY-PHASE 2
Made 3 October 2012
[KKR.PUU.110-1/6/11 Jld. 2; PN(PU2)460/LXVI]
DATO’ SERI KONG CHO HA
Minister of Transport
Common questions
- What is Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012?
- Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 is Malaysia P.U. (A), cited as P.U. (A) 325 2012, currently marked in force and first recorded in 2012.
- Is Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 still in force?
- Yes — Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 is currently in force.
- When did Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 take effect?
- Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 was first recorded in 2012.
- How many sections does Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 have?
- Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 contains 3 sections.
- Where can I read the official version of Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012?
- The official text of Perintah Had Laju Kebangsaan (Pindaan) (No. 2) 2012 is published at lom.agc.gov.my.
Something wrong on this page?
If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.