Back to the text
Street, Drainage and Building (Amendment) Act 2019 · s 2
Suggest a correction
Tell us what is wrong in this text. We check every suggestion against the official version before we change anything.
Street, Drainage and Building (Amendment) Act 2019 · s 2
Tell us what is wrong in this text. We check every suggestion against the official version before we change anything.
The Street, Drainage and Building Act 1974 [Act 133], which is referred to as the “principal Act” in this Act, is amended in section 3—
by inserting after the definition of “sky-sign” the following definition:
‘ “slope” means a pitch of land surface or rock whether build or exists naturally including any erection which resist forces and moments of the slope;’; and
by inserting after the definition of “frontager” the following definition:
‘ “geotechnical” means an engineering field in relation to the behavior of soil and rock which includes the types, conditions, profiles, structural design, slope stabilization and other monitoring works related to the behavior of the soil and rock;’.