Malaysia legislation
Section 3
Section 3
Application
(a)
any installation which receives electrical energy from a licensee a total electrical energy consumption equal to or exceeding 3,000,000kWh as measured at one metering point or more over any period not exceeding six consecutive months; or
(b)
any installation which is used, worked or operated by a private installation licensee with a total net electrical energy generation equal to or exceeding 3,000,000kWh over any period not exceeding six consecutive months.
(2)
For the purposes of subregulation (1) and wherever mentioned in these
Regulations —
(a)
for any installation which receives electrical energy from a licensee under paragraph (1)(a) before or on the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the effective date;
(b)
for any installation which receives electrical energy from a licensee under paragraph (1)(a) after the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the date the electrical energy supply is connected to the installation by the licensee;
(c)
for any installation which is used, worked or operated by a private installation licensee under paragraph (1)(b) before or on the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the effective date; and
(d)
for any installation which is used, worked or operated by a private installation licensee under paragraph (1)(b) after the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the date the installation starts to generate electrical energy.
Fees