Malaysia legislation

Section 2

of Electricity Supply Regulations 2024

Section 2

For the purpose of this Part, “installation capacity” means the maximum level of electrical power at which an installation can be used, worked on or operated for a period of time without causing damage to any part of the installation. However, for a transmission or distribution system, the installation capacity is at the maximum level of electrical power at which the system is expected or required to supply over a period of time, whichever is the higher.

[Subregulation 11(3)]

FEES FOR THE ISSUANCE OF A LICENCE FOR A PRIVATE INSTALLATION