Mmylaw.my
SearchLawsConnectSign in
Electricity Supply Regulations 2024/Section 4

Malaysia legislation

Section 4

of Electricity Supply Regulations 2024

Section 4

In the calculation of the installation capacity, kilowatt (kW) is calculated as 0.85 x kilovolt-ampere (kVA).

Read in full context — Electricity Supply Regulations 2024 →
M

mylaw.my is a free, public interface for Malaysian legislation (federal, plus Sabah and Sarawak state law). Always verify against the official publisher before relying on the text.