34C. Breach of duty by contractor
Official textFrom Laws of Malaysia Online, unchanged
If the Lembaga is of the opinion that a contractor has breached any of his duties under subsection 34B(1), the Lembaga may do either one or all of the following:
Lembaga
“Lembaga” means the Lembaga Pembangunan Industri Pembinaan Malaysia established under section 3;
engage a qualified person or a specialist to carry out such investigations and tests as may be necessary and to advise the Lembaga on all matters relating to the safety of the building in respect of which the construction works are being carried out or have been carried out;
38 Laws of Malaysia ACT 520
impose on the contractor, all or any of the directives in subsection (2);
impose a penalty not exceeding five hundred thousand ringgit on the contractor.
The Lembaga may, for the purpose of public safety or preventing any situation referred to in subsection 34B(2), issue a written directive to the contractor of the construction works, for the contractor—
contractor
“contractor” means a person who carries out or completes or undertakes to carry out or complete any construction works;
to immediately stop the construction works;
to carry out or cause to be carried out at the contractor’s cost such inspection as the Lembaga may specify;
to execute or cause to be executed at the contractor’s cost such construction works as the Lembaga may specify;
to demolish or cause to be demolished at the contractor’s cost the defective building, or any failure or other event occurring in respect of which the construction works are being carried out or have been carried out or any part thereof, and to remove any debris resulting from the demolition; or
to revoke or suspend registration of the contractor granted under this Act.
If any contractor fails to comply with the directive issued by the Lembaga under this section within the time specified, the
Lembaga may execute the directive in such manner as the Lembaga thinks fit and recover in a court of competent jurisdiction, as a debt due to the Lembaga, all expenses reasonably incurred by the
Lembaga in doing so from the contractor.
Without prejudice to the right of the Lembaga to exercise its powers under subsection (3), any contractor who without reasonable cause, fails to comply with any directive issued to him under subsection (2) shall be guilty of an offence and shall, on conviction,
Lembaga Pembangunan Industri 39
Pembinaan Malaysia be liable to a fine not exceeding five hundred thousand ringgit and in respect of a continuing failure to comply, an additional fine not exceeding ten thousand ringgit for every day or part of a day during which the offence continues after conviction.
Any contractor to whom a directive under subsection (2) has been issued, while the directive is in force, shall display a copy of the directive at every entrance to the building to which the directive relates, and such copy shall be displayed in a way that it can be easily read by people outside the building.
building
“building” means any permanent or temporary building or structure including any house, hut, shed or roofed enclosure, whether used for the purpose of human habitation or otherwise, and also any wall, roof, fence, platform, staging, gate, post, pillar, paling, frame, hoarding, slip, dock, wharf, pier, jetty, landing-stage, road or bridge, or any structure support or foundation connected to the foregoing and any other erection, as the Minister may, by order published in the Gazette, declare to be a building;
Any contractor who contravenes subsection (5) shall be guilty of an offence under this Act.
The Lembaga may order the contractor of the construction works mentioned in subsection (1) to pay or reimburse the Lembaga, all or part of the expenses incurred by the Lembaga in engaging a qualified person or a specialist under paragraph (1)(a) and if the contractor fails to pay the amount payable, the Lembaga may recover in a court of competent jurisdiction, as a debt due to the Lembaga, so much of the amount payable by the contractor.
construction works
“construction works” means the construction, extension, installation, repair, maintenance, renewal, removal, renovation, alteration, dismantling, or demolition of— (a) any building, erection, edifice, structure, wall, fence or chimney, whether constructed wholly or partly above or below ground level; (b) any road, harbour works, railway, cableway, canal or aerodrome; (c) any drainage, irrigation or river control works; (d) any electrical, mechanical, water, gas, petrochemical or telecommunication works; or (e) any bridge, viaduct, dam, reservoir, earthworks, pipeline, sewer, aqueduct, culvert, drive, shaft, tunnel or reclamation works, and includes— (A) any works which form an important and integral part of or are preparatory to or temporary for the works described in paragraphs (a) to (e), including site clearance, soil investigation and improvement, earth-moving, excavation, laying of foundation, site restoration and landscaping; or (B) procurement of construction materials, equipment or workers, necessarily required for any work described in paragraphs (a) to (e);
Terms defined in s 2
building
Defined · s 2“building” means any permanent or temporary building or structure including any house, hut, shed or roofed enclosure, whether used for the purpose of human habitation or otherwise, and also any wall, roof, fence, platform, staging, gate, post, pillar, paling, frame, hoarding, slip, dock, wharf, pier, jetty, landing-stage, road or bridge, or any structure support or foundation connected to the foregoing and any other erection, as the Minister may, by order published in the Gazette, declare to be a building;
construction works
Defined · s 2“construction works” means the construction, extension, installation, repair, maintenance, renewal, removal, renovation, alteration, dismantling, or demolition of— (a) any building, erection, edifice, structure, wall, fence or chimney, whether constructed wholly or partly above or below ground level; (b) any road, harbour works, railway, cableway, canal or aerodrome; (c) any drainage, irrigation or river control works; (d) any electrical, mechanical, water, gas, petrochemical or telecommunication works; or (e) any bridge, viaduct, dam, reservoir, earthworks, pipeline, sewer, aqueduct, culvert, drive, shaft, tunnel or reclamation works, and includes— (A) any works which form an important and integral part of or are preparatory to or temporary for the works described in paragraphs (a) to (e), including site clearance, soil investigation and improvement, earth-moving, excavation, laying of foundation, site restoration and landscaping; or (B) procurement of construction materials, equipment or workers, necessarily required for any work described in paragraphs (a) to (e);
contractor
Defined · s 2“contractor” means a person who carries out or completes or undertakes to carry out or complete any construction works;
Lembaga
Defined · s 2“Lembaga” means the Lembaga Pembangunan Industri Pembinaan Malaysia established under section 3;