Skip to content
In forceAs enacted

P.U. (B)

Pengubahan Had Pelabuhan bagi Pelabuhan Muar

Feedback & support

The text

10 Januari 2023 10 January 2023

P.U. (B) 5

WARTA KERAJAAN PERSEKUTUAN

FEDERAL GOVERNMENT

GAZETTE

PENGUBAHAN HAD PELABUHAN

BAGI PELABUHAN MUAR

ALTERATION OF PORT LIMITS FOR MUAR PORT

DISIARKAN OLEH/

JABATAN PEGUAM NEGARA/

ATTORNEY GENERAL’S CHAMBERS

P.U. (B) 5 2

ORDINAN PERKAPALAN SAUDAGAR 1952

PENGUBAHAN HAD PELABUHAN BAGI PELABUHAN MUAR

Preamble

PADA menjalankan kuasa yang diberikan oleh subseksyen 6(3)

Ordinan Perkapalan Saudagar 1952 [Ord. 70/1952], Menteri mengubah had pelabuhan bagi

Pelabuhan

Muar dalam

Negeri

Johor yang ditetapkan dalam

Pemberitahuan Undang-Undang No. 73 tahun 1953 [L.N. 73/1953].

Pindaan Pemberitahuan Undang-Undang No. 73 tahun 1953 2.

Pemberitahuan

Undang-Undang

No.

73

tahun 1953

dipinda dalam

Jadual Pertama, berkenaan dengan Negeri Johor, dengan menggantikan butiran 1 dan butir-butir yang berhubungan dengannya dengan butiran dan butir-butir yang berikut:

Schedule

FIRST SCHEDULE

State of Johore

First column

Second column

“1. Muar

The areas enclosed by the following imaginary lines:

(A)

From a point of the coast at Latitude 02° 06.30’

North, Longitude 102° 29.50’ East, to

(B)

Latitude 01° 58.70’ North, Longitude 102° 23.30’

East, to

(C)

Latitude 01° 49.40’ North, Longitude 102° 40.80’

East, to

(D)

Latitude 01° 51.30’ North Longitude 102° 42.70’

East and thence along the shore in north westerly direction to Tanjung Ketapang, thence along the left bank of the Muar river up to the Muar Second Bridge where a line drawn across the river along the outmost

P.U. (B) 5 3

line of the North bound bridge to a point, thence along the right bank of Muar river down to Tanjong Agas returning to position (A) including all tributaries, piers, jetties, wharves, landing places, quays, docks and other similar works, whether within or without the high-water mark, and any portion of the shore or bank within 45.72 metres of high water mark, subject to any rights of private property therein.”.

Bertarikh 30 Disember 2022

[MOT.PUU(S).600-1/15/3; PN(PU2)199/XXX]

LOKE SIEW FOOK

Menteri Pengangkutan

P.U. (B) 5 4

MERCHANT SHIPPING ORDINANCE 1952

ALTERATION OF PORT LIMITS FOR MUAR PORT

IN exercise of the powers conferred by subsection 6(3)

of the

Merchant Shipping Ordinance 1952 [Ord. 70/1952], the Minister alters the port limits for Muar Port in the State of Johore as prescribed in the Legal Notification

No. 73 of 1953 [L.N. 73/1953].

Amendment of Legal Notification No. 73 of 1953 2.

The Legal Notification No. 73 of 1953 is amended in the First Schedule, in respect of the State of Johore, by substituting for item 1 and particulars relating to it the following item and particulars:

Schedule

FIRST SCHEDULE

State of Johore

First column

Second column

“1. Muar

The areas enclosed by the following imaginary lines:

(A)

From a point of the coast at Latitude 02° 06.30’

North, Longitude 102° 29.50’ East, to

(B)

Latitude 01° 58.70’ North, Longitude 102° 23.30’

East, to

(C)

Latitude 01° 49.40’ North, Longitude 102° 40.80’

East, to

(D)

Latitude 01° 51.30’ North Longitude 102° 42.70’

East and thence along the shore in north westerly direction to Tanjung Ketapang, thence along the left bank of the Muar river up to the Muar Second Bridge where a line drawn across the river along the outmost

P.U. (B) 5 5

line of the North bound bridge to a point, thence along the right bank of Muar river down to Tanjong Agas returning to position (A) including all tributaries, piers, jetties, wharves, landing places, quays, docks and other similar works, whether within or without the high-water mark, and any portion of the shore or bank within 45.72 metres of high water mark, subject to any rights of private property therein.”.

Dated 30 December 2022

[MOT.PUU(S).600-1/15/3; PN(PU2)199/XXX]

LOKE SIEW FOOK

Minister of Transport