Seksyen 1
(1)
Peraturan-peraturan ini bolehlah dinamakan Peraturan-Peraturan
Juruukur Tanah Berlesen (Pindaan) 2024.
(2)
Peraturan-Peraturan ini mula berkuat kuasa pada 23 Oktober 2024.
Pindaan peraturan 2
/akn/my/act/pua/2024/309
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERATURAN-PERATURAN JURUUKUR TANAH BERLESEN (PINDAAN) 2024 is Malaysia P.U. (A), cited as P.U. (A) 309 2024, currently marked in force and first recorded in 2024.
Opening note
Peraturan-peraturan ini bolehlah dinamakan Peraturan-Peraturan
Juruukur Tanah Berlesen (Pindaan) 2024.
Peraturan-Peraturan ini mula berkuat kuasa pada 23 Oktober 2024.
Pindaan peraturan 2
Peraturan-Peraturan
Juruukur
Tanah
Berlesen 2011
[P.U.(A)331/2011], yang disebut sebagai “Peraturan-Peraturan ibu” dalam Peraturan-Peraturan ini dipinda dalam peraturan 2—
dalam takrif
“Artikel”, dengan memasukkan selepas perkataan
“orang berartikel” perkataan “selain seorang juruukur Kerajaan”;
dengan menggantikan takrif “orang berartikel” dengan takrif yang berikut:
‘ “orang berartikel” ertinya—
seseorang yang telah membuat Artikel dengan seorang juruukur tanah berlesen dan berdaftar di bawah perenggan 12(1)(c); atau
seseorang juruukur Kerajaan yang telah mengemukakan perakuan yang dikeluarkan oleh Ketua Pengarah Ukur dan
Pemetaan di bawah peraturan 15A kepada Lembaga dan berdaftar di bawah perenggan 12(1)(c);’;
P.U. (A) 309 3
dengan menggantikan takrif “pelan” dengan takrif yang berikut:
‘ “pelan” bermaksud apa-apa pelan ukur atau pelan ukur geomatik;’;
dengan menggantikan takrif “Pengarah Ukur dan Pemetaan” dengan takrif yang berikut:
‘ “Pengarah Ukur dan Pemetaan” bermaksud pegawai yang menjalankan tugas sebagai ketua di Jabatan Ukur dan Pemetaan Malaysia di negeri, dan termasuklah pegawai yang menjalankan tugas bagi pihaknya;’; dan
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 3 dengan peraturan yang berikut:
“Permohonan pendaftaran 3.
Tiap-tiap orang yang layak didaftarkan di bawah subseksyen 9(1) Akta hendaklah memohon kepada Lembaga dalam borang sebagaimana yang ditetapkan dalam Jadual Pertama bersama dengan pembayaran fi sebagaimana yang ditetapkan dalam Jadual Kedua.
Selepas menerima permohonan untuk pendaftaran di bawah subperaturan (1), Lembaga hendaklah memutuskan permohonan itu dalam tempoh tiga bulan dari tarikh penerimaan permohonan itu.
Tiap-tiap pemohon hendaklah diberitahu mengenai keputusan
Lembaga secara bertulis dalam tempoh dua bulan dari tarikh keputusan itu.
P.U. (A) 309 4
Seorang juruukur Kerajaan yang namanya telah diletakkan dalam Daftar di bawah subseksyen 9(2) Akta ini hendaklah kekal dalam Daftar untuk tempoh tidak melebihi enam bulan dari tarikh dia tidak lagi menjadi seorang juruukur Kerajaan.
Selepas tamat tempoh yang diperuntukkan dalam subperaturan (4), Setiausaha hendaklah mengeluarkan nama juruukur
Kerajaan itu daripada Daftar sekiranya tiada permohonan lesen amalan dibuat olehnya di bawah peraturan 4.”.
Pindaan peraturan 6
Peraturan 6 Peraturan-Peraturan ibu dipinda dengan memasukkan selepas subperaturan (1) subperaturan yang berikut:
“(1A)
Setelah diminta oleh Lembaga, seorang juruukur tanah berlesen hendaklah memberikan bukti pemastautinan di Semenanjung
Malaysia atau Wilayah Persekutuan Labuan sekurang-kurangnya enam bulan dalam satu tahun kalendar atau apa-apa tempoh lain sehingga Lembaga berpuas hati.”.
Penggantian peraturan 8
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 8 dengan peraturan yang berikut:
“Amalan dan nama amalan 8.
Seseorang juruukur tanah berlesen yang berhasrat untuk menjalankan amalan hendaklah membuat permohonan secara bertulis kepada
Lembaga atas nama amalannya sebagai suatu ketuanpunyaan tunggal, perkongsian atau pertubuhan perbadanan berserta pembayaran fi pendaftaran yang ditetapkan dalam Jadual Kedua.
P.U. (A) 309 5
Lembaga hendaklah mendaftarkan amalan juruukur tanah berlesen sebagai suatu ketuanpunyaan tunggal, perkongsian atau pertubuhan perbadanan, tertakluk kepada syarat dan sekatan yang difikirkan patut, sekiranya—
dalam hal suatu ketuanpunyaan tunggal, tuan punya tunggal adalah seorang juruukur tanah berlesen;
dalam hal suatu perkongsian, semua rakan kongsi adalah juruukur tanah berlesen; atau
ahli lembaga pengarah adalah juruukur tanah berlesen;
ia mempunyai jumlah modal berbayar minimum sebagaimana yang ditentukan oleh Lembaga; dan
hal ehwal pentadbiran pertubuhan perbadanan hendaklah di bawah kawalan dan pengurusan seseorang yang merupakan seorang juruukur tanah berlesen dan diberi kuasa di bawah resolusi lembaga pengarah pertubuhan perbadanan untuk membuat semua keputusan bagi pihak pertubuhan perbadanan berkenaan dengan keperluan di bawah peraturan ini.
P.U. (A) 309 6
Setelah permohonan di bawah subperaturan (1) diluluskan,
Lembaga hendaklah mengeluarkan suatu perakuan pendaftaran nama amalan sebagaimana yang ditetapkan dalam Jadual Kelima dan boleh mengenakan apa-apa syarat yang difikirkannya patut.
Lembaga boleh membatalkan perakuan pendaftaran nama amalan yang dikeluarkan di bawah subperaturan (3) jika juruukur tanah berlesen yang kepadanya perakuan pendaftaran nama amalan telah dikeluarkan tidak mematuhi mana-mana syarat semasa perakuan pendaftaran nama amalan itu dikeluarkan.
Seseorang juruukur tanah berlesen yang berhasrat untuk mengubah nama amalannya, hendaklah membuat permohonan secara bertulis untuk kelulusan Lembaga.
Setelah Lembaga meluluskan cadangan perubahan nama amalan, fi sebagaimana yang ditetapkan di dalam Jadual Kedua hendaklah dibayar dalam tempoh satu bulan dari tarikh pemakluman oleh Lembaga.
Seseorang juruukur tanah berlesen boleh memiliki ekuiti dalam satu atau lebih nama amalan.
Walau apa pun yang diperuntukkan dalam subperaturan (7), seseorang juruukur tanah berlesen hendaklah menjalankan amalannya di bawah satu nama amalan sahaja.
Seseorang juruukur tanah berlesen hendaklah, dalam tempoh satu bulan daripada tarikh apa-apa perubahan ketuanpunyaan tunggalnya, atau komposisi rakan kongsi, ahli lembaga pengarah atau pemegang saham, mengemukakan kepada Lembaga suatu laporan secara bertulis dengan memberikan butir-butir penuh perubahan itu dan mendapatkan kelulusan
Lembaga mengenai komposisi terkini atau jenis amalan juruukur tanah berlesen.”.
P.U. (A) 309 7
Pindaan peraturan 9
Peraturan 9 Peraturan-Peraturan ibu dipinda dalam nota bahu, dengan menggantikan perkataan “firma” dengan perkataan “nama amalan”.
Pindaan peraturan 10
Peraturan-Peraturan ibu dipinda dengan menggantikan subperaturan (1) dengan subperaturan yang berikut:
“(1)
Jika seorang juruukur tanah berlesen yang beramal sebagai perkongsian atau pertubuhan perbadanan menyenggara suatu pejabat cawangan—
pejabat cawangan itu hendaklah beroperasi atas nama amalan yang disebut dalam subperaturan 8(3); dan
pejabat cawangan itu hendaklah diuruskan secara berterusan oleh seorang juruukur tanah berlesen.”.
Pindaan peraturan 11
Peraturan-Peraturan ibu dipinda dalam peraturan 11 dengan menggantikan perkataan “peraturan 4” dengan perkataan “peraturan 5”.
Pindaan peraturan 12
dalam perenggan (b), dengan memotong perkataan “dan” di hujung perenggan itu;
dengan menggantikan perenggan (c) dengan perenggan yang berikut:
“(c)
orang berartikel; dan”; dan
P.U. (A) 309 8
dengan memasukkan selepas perenggan (c) perenggan yang berikut:
“(d) pembantu yang merupakan juruteknologi geomatik atau juruteknik geomatik.”.
Penggantian Bahagian III
Peraturan-Peraturan ibu dipinda dengan menggantikan Bahagian III dengan bahagian yang berikut:
“BAHAGIAN III
ARTIKEL DAN ORANG BERARTIKEL
Tempoh dan syarat Artikel 13.
Suatu Artikel hendaklah bagi tempoh dua tahun dan hendaklah dalam bentuk yang ditetapkan dalam Jadual Keenam.
Sebelum seseorang membuat suatu Artikel, dia hendaklah mengemukakan keterangan bahawa dia telah memperoleh—
apa-apa kelayakan yang berkaitan dengan ukur geomatik, sebagaimana yang boleh diluluskan oleh Menteri, atas syor
Lembaga.
Seseorang yang memegang kelayakan sebagaimana yang diluluskan oleh Menteri di bawah perenggan 2(b) hendaklah lulus apa-apa peperiksaan sebagaimana yang ditentukan oleh Lembaga sebelum orang itu membuat suatu Artikel.
Tiada juruukur tanah berlesen boleh mengambil mana-mana orang berartikel di bawah suatu Artikel melainkan jika dia telah dilesenkan oleh
Lembaga melebihi lima tahun.
P.U. (A) 309 9
Artikel dikemukakan kepada Setiausaha 14.
Seorang juruukur tanah berlesen hendaklah, dalam tempoh tiga bulan dari tarikh penyempurnaan Artikel, mengemukakan Artikel itu kepada
Setiausaha bersama dengan perakuan pendidikan, perakuan kelahiran, bukti kewarganegaraan orang berartikel itu dan fi pendaftaran Artikel sebagaimana yang ditetapkan dalam Jadual Kedua.
Pendaftaran dan pembatalan Artikel 15.
Setiausaha, tertakluk kepada arahan Lembaga, hendaklah secepat yang mungkin setelah menerima apa-apa Artikel di bawah peraturan 14, mendaftarkan Artikel itu dalam Daftar yang disimpan mengikut peraturan 12.
Lembaga boleh mengarahkan
Setiausaha untuk menolak pendaftaran mana-mana Artikel jika—
Mana-mana pihak boleh membatalkan Artikel dengan memberikan notis secara bertulis kepada pihak satu lagi dalam tempoh sekurang-kurangnya empat belas hari dan pada masa yang sama pihak itu hendaklah memaklumkan kepada Lembaga berkenaan dengan pembatalan itu.
Lembaga boleh memotong nama orang berartikel daripada Daftar—
Lembaga boleh membatalkan pendaftaran mana-mana Artikel, jika pendaftaran itu telah diperoleh melalui penipuan, representasi palsu atau penyembunyian apa-apa fakta material, atau jika pendaftaran itu dibuat oleh sebab kesilapan atau kekhilafan.
Pendaftaran juruukur Kerajaan sebagai orang berartikel 15A.
Seseorang juruukur Kerajaan yang telah berkhidmat dalam bidang ukur tanah atau ukur geomatik untuk sekurang-kurangnya dua tahun boleh membuat permohonan kepada Lembaga untuk didaftarkan sebagai orang berartikel dengan syarat permohonannya untuk berdaftar di bawah subseksyen 9(1) Akta telah disokong dengan perakuan daripada Ketua Pengarah Ukur dan Pemetaan bahawa juruukur Kerajaan itu adalah seorang yang sesuai dan layak untuk didaftarkan dengan Lembaga.”.
Penggantian peraturan 16
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 16 dengan peraturan berikut:
“Latihan untuk orang berartikel 16.
Tiap-tiap orang berartikel hendaklah melaksanakan latihan seperti yang berikut:
Juruukur tanah berlesen yang telah membuat suatu Artikel hendaklah mengemukakan kepada Setiausaha penyataan sebagaimana dalam borang yang ditetapkan dalam Jadual Kelapan bagi tempoh yang berakhir pada tiga puluh satu Disember pada setiap tahun tidak lewat daripada tiga puluh hari selepas berakhirnya tempoh itu.
P.U. (A) 309 11
Jika Lembaga berpendapat bahawa orang berartikel tidak menerima latihan yang secukupnya, Lembaga boleh menghendaki orang berartikel itu untuk menjalani latihan tambahan.
Lembaga boleh menerima pengalaman dalam ukur hakmilik dan ukur geomatik yang diperoleh oleh seseorang orang berartikel yang mempunyai pengalaman sebagai seorang juruukur Kerajaan atau seorang pensyarah di mana-mana universiti atau institusi yang diikitiraf oleh Lembaga dengan syarat bahawa pengalaman itu diperakui oleh suatu pernyataan latihan dalam borang sebagaimana yang ditetapkan dalam Jadual Kelapan yang dikeluarkan oleh Ketua Pengarah Ukur dan Pemetaan.
Setelah mempertimbangkan subperaturan (4), Lembaga boleh menentukan tempoh latihan untuk orang berartikel yang mempunyai pengalaman sebagai seorang juruukur Kerajaan atau seorang pensyarah di mana-mana universiti atau institusi yang diikitiraf oleh Lembaga.”.
Penggantian peraturan 17
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 17 dengan peraturan yang berikut:
“Kursus pembangunan profesional 17.
Lembaga hendaklah menyebabkan dan memperakukan apa-apa kursus pembangunan profesional berhubung dengan ukur hakmilik dan ukur geomatik bagi juruukur tanah berlesen dan pembantunya, sekiranya perlu.”.
Pemotongan peraturan 18
Peraturan-Peraturan ibu dipinda dengan memotong peraturan 18.
P.U. (A) 309 12
Penggantian peraturan 19
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 19 dengan peraturan yang berikut:
“Peperiksaan 19.
Bahagian I
Bahagian II
Bahagian III
Walau apa pun perenggan (1)(a), Lembaga boleh menentukan takat peperiksaan dalam Bahagian I peperiksaan berdasarkan kelayakan dan pengalaman yang diperoleh oleh seseorang.
Bahagian I
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 20
dengan peraturan yang berikut:
“Kelayakan 20.
Bahagian I
Subperaturan 21(5) Peraturan-Peraturan ibu dipinda—
dengan menggantikan perkataan “dalam sekurang-kurangnya dua surat khabar harian” dengan perkataan “dalam apa-apa medium elektronik”; dan
dengan menggantikan perkataan “Bahagian I” dengan perkataan
“Bahagian II”.
Penggantian peraturan 22
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 22 dengan peraturan yang berikut:
“Permohonan untuk peperiksaan 22.
Seseorang orang berartikel boleh mengemukakan tugas amali atau menghadiri kursus bagi maksud Bahagian I peperiksaan selaras dengan garis panduan di bawah subperaturan 19(3).
Sebelum pengemukaan tugas amali atau menghadiri kursus di bawah Bahagian I peperiksaan, Lembaga boleh menghendaki orang berartikel itu untuk membuktikan bahawa—
dia telah memperoleh pengalaman sebagaimana yang boleh dikehendaki oleh Lembaga.
Tiada seorang pun layak menduduki Bahagian II peperiksaan melainkan dia adalah seorang—
orang berartikel yang telah menyiapkan sekurang-kurangnya dua tahun tempoh Artikel;
seorang juruukur Kerajaan yang telah didaftarkan sebagai orang berartikel; atau
seorang orang berartikel yang bekerja sebagai pensyarah dengan sekurang-kurangnya lima tahun pengalaman di mana-mana institusi pengajian tinggi di bawah
Akta Universiti dan Kolej Universiti 1971 [Akta 30],
Akta Universiti Teknologi MARA 1976 [Akta 173], atau mana-mana institusi yang diiktiraf Lembaga.
Seseorang itu adalah layak untuk menduduki Bahagian III peperiksaan selepas satu bulan dikreditkan lulus bagi Bahagian I dan II peperiksaan.”.
P.U. (A) 309 14
Pindaan peraturan 21
Bahagian I
Seorang orang berartikel yang berhasrat untuk menduduki
Bahagian II peperiksaan hendaklah mengemukakan suatu perakuan perkhidmatan dalam borang sebagaimana yang ditetapkan dalam
Jadual Kesebelas daripada juruukur tanah berlesen yang dengannya dia berkhidmat di bawah Artikel atau suatu surat perakuan yang dikeluarkan oleh
Ketua Pengarah Ukur dan Pemetaan.”.
Pindaan peraturan 23 18.
Subperaturan 23(1) Peraturan-Peraturan ibu dipinda dengan menggantikan perkataan “Bahagian I” perkataan “Bahagian II”.
P.U. (A) 309 15
Bahagian baharu VA
19.
Peraturan-Peraturan ibu dipinda dengan memasukkan selepas peraturan 24
bahagian yang berikut:
“BAHAGIAN VA
PEMBANTU
Pembantu 24A. (1)
Juruukur tanah berlesen boleh mengambil kerja mana-mana pembantu untuk menjalankan kerja ukur hakmilik atau ukur geomatik dan pembantu itu boleh termasuk—
(a)
juruteknologi geomatik—
(i)
sekiranya dia memperoleh ijazah pertama dalam ukur geomatik, ukur tanah atau apa-apa kelayakan lain yang berkaitan dengan ukur geomatik daripada mana-mana institusi atau universiti yang diiktiraf
Lembaga; atau
(ii)
sekiranya dia memperoleh ijazah pertama dalam apa-apa bidang dan mempunyai pensijilan kompetensi dalam ukur hakmilik atau ukur geomatik sebagaimana yang diiktiraf oleh Lembaga;
(b)
juruteknik geomatik—
(i)
sekiranya dia memperoleh sijil, diploma ukur geomatik, ukur tanah atau apa-apa kelayakan lain yang berkaitan dengan ukur geomatik daripada mana-mana institusi atau universiti yang diiktiraf oleh Lembaga; atau
P.U. (A) 309 16
(ii)
sekiranya dia memperoleh sijil, diploma dalam apa-apa bidang dan mempunyai pensijilan kompetensi dalam bidang ukur hakmilik atau ukur geomatik yang diiktiraf Lembaga.
Nama pembantu dikemukakan kepada Setiausaha 24B.
(1)
Seorang juruukur tanah berlesen hendaklah, dalam tempoh tiga bulan dari tarikh ambil kerja pembantu yang merupakan seorang juruteknologi geomatik dan juruteknik geomatik, mengemukakan nama pembantu itu kepada Setiausaha berserta dengan apa-apa dokumen pengenalan sebagaimana yang dikehendaki oleh Lembaga.
(2)
Lembaga boleh menghendaki juruukur tanah berlesen untuk mengemukakan kepada Setiausaha suatu laporan sulit penuh yang mengandungi apa-apa butiran berhubung dengan pembantu yang diambil kerja oleh juruukur tanah berlesen.
(3)
Juruukur tanah berlesen hendaklah memberitahu Lembaga apabila pembantu itu berhenti bekerja dengannya.”.
Pindaan Bahagian VI
20.
Bahagian
VI
Peraturan-Peraturan ibu dipinda dalam kepala, dengan menggantikan perkataan “PENGENDALIAN UKUR HAKMILIK” dengan perkataan
“UKUR HAKMILIK DAN UKUR GEOMATIK”.
Pindaan peraturan 25 21.
Peraturan-Peraturan ibu dipinda dalam peraturan 25—
(a)
dengan menomborkan semula peraturan sedia ada sebagai subperaturan (1);
P.U. (A) 309 17
(b)
dalam subperaturan (1) yang dinomborkan semula—
(i)
dengan menggantikan perkataan “dan garis panduan” dengan perkataan “garis panduan dan spesifikasi untuk ukur hakmilik dan ukur geomatik”;
(ii)
dengan menggantikan perkataan “Ketua Pengarah Ukur” dengan perkataan “Ketua Pengarah Ukur dan Pemetaan atau Lembaga”; dan
(c)
dengan memasukkan selepas subperaturan (1) yang dinomborkan semula subperaturan berikut:
“(2)
Tiap-tiap ukur hakmilik dan ukur geomatik hendaklah dikendalikan di bawah arahan atau pengawasan langsung oleh juruukur tanah berlesen dan berdasarkan peraturan-peraturan ini.”.
Peraturan baharu 25A
22.
Peraturan-Peraturan ibu dipinda dengan memasukkan selepas peraturan 25
peraturan berikut:
“Pengendalian ukur hakmilik 25A.
Seseorang juruukur tanah berlesen hendaklah menjalankan ukur hakmilik bagi maksud pendepositan pelan ukur hakmilik dengan Jabatan Ukur dan Pemetaan.”.
Pindaan peraturan 26 23.
Peraturan 26 Peraturan-Peraturan ibu dipinda—
(a)
dengan menggantikan subperaturan (1) dengan subperaturan yang berikut:
P.U. (A) 309 18
“ (1)
Dalam hal bagi ukur hakmilik, seorang juruukur tanah berlesen hendaklah menyebabkan suatu pendepositan fi ukur sepenuhnya dengan Lembaga sebagaimana yang ditetapkan dalam
Jadual Ketiga belas sebelum mana-mana ukur hakmilik dimulakan.”;
(b)
dengan memasukkan selepas subperaturan (1) subperaturan berikut:
“ (1A) Dalam hal bagi ukur geomatik, seorang juruukur tanah berlesen boleh menyebabkan suatu pendepositan fi ukur sepenuhnya dengan Lembaga sebelum mana-mana ukur geomatik dimulakan.”;
(c)
dalam subperaturan (6), dengan menggantikan perkataan “Pengarah Ukur”
dengan perkataan “Pengarah Ukur dan Pemetaan”;
(d)
dalam subperaturan
, dengan menggantikan perkataan
“subperenggan (6)” dengan perkataan “subperaturan (6) dan apa-apa pemulangan balik berkenaan dengan subperaturan (1A),”; dan
(e)
dengan memasukkan selepas subperaturan (8) subperaturan yang berikut:
“(9)
Sekiranya berlaku apa-apa pembetulan kesalahan yang dibuat oleh Jabatan Ukur dan Pemetaan di bawah subseksyen 16(3)
Akta, Lembaga boleh membayar balik kos itu dengan menggunakan fi yang didepositkan untuk kerja ukur hakmilik itu.” .
Pindaan peraturan 27 24.
Subperaturan 27(2) Peraturan-Peraturan ibu dipinda dengan menggantikan perkataan “Jabatan Ukur” dengan perkataan “Jabatan Ukur dan Pemetaan”.
P.U. (A) 309 19
Peraturan baharu 28A
25.
Peraturan-Peraturan ibu dipinda dengan memasukkan selepas peraturan 28
peraturan yang berikut:
“Amalan dan pengendalian ukur geomatik 28A. (1)
Seorang juruukur tanah berlesen hendaklah menjalankan ukur geomatik dalam bidang amalan sebagaimana ditetapkan dalam Jadual Kelima
Belas bagi maksud—
(a)
pengemukaan apa-apa pelan ukur geomatik sebagaimana dikehendaki oleh mana-mana pihak berkuasa Kerajaan Persekutuan atau Kerajaan Negeri, atau pihak berkuasa tempatan;
(b)
penyediaan apa-apa pelan ukur geomatik dalam menjalankan kerja bagi tujuan awam sebagaimana ditentukan oleh Kerajaan Persekutuan, Kerajaan Negeri atau pihak berkuasa tempatan; dan
(c)
penyediaan apa-apa pelan ukur geomatik sebagaimana yang dikehendaki oleh—
(i)
mana-mana jabatan Kerajaan Persekutuan atau
Kerajaan Negeri;
(ii)
mana-mana agensi atau badan berkanun
Kerajaan Persekutuan atau Kerajaan Negeri;
(iii)
mana-mana pihak berkuasa tempatan;
(iv)
mana-mana syarikat berkaitan
Kerajaan
Persekutuan atau Kerajaan Negeri; atau
P.U. (A) 309 20
(v)
mana-mana syarikat yang dilantik oleh Kerajaan
Persekutuan,
Kerajaan
Negeri atau pihak berkuasa tempatan.
(2)
Apa-apa ukur geomatik di bawah subperaturan (1) hendaklah menggunakan teknik ukuran tepat yang merupakan proses untuk menentukan—
(a)
bentuk, kontur, kedudukan, kawasan, ketinggian, kedalaman atau apa-apa butir-butir daripada—
(i)
permukaan bumi, sama ada darat atau air; atau
(ii)
apa-apa fitur semula jadi atau buatan pada, di bawah atau di atas mana-mana bahagian permukaan bumi; atau
(b)
kedudukan atau sempadan mana-mana bahagian permukaan bumi, atau apa-apa fitur semulajadi atau buatan yang disebut dalam subperenggan (2)(a)(ii), dan termasuklah perbuatan atau proses membuat atau mendapatkan apa-apa pelan daripadanya menggunakan piawaian dan spesifikasi sebagaimana yang ditentukan oleh Ketua Pengarah Ukur dan Pemetaan.”.
Pindaan peraturan 29 26.
Subperaturan 29(1) Peraturan-Peraturan ibu dipinda dalam perenggan (e)
dengan memasukkan selepas perkataan “jujur atau tidak menipu dalam” perkataan
“membuat representasi atau”.
P.U. (A) 309 21
Penggantian peraturan 32 27.
Peraturan-Peraturan ibu dipinda dengan menggantikan peraturan 32 dengan peraturan yang berikut:
“ Aduan 32.
(1)
Mana-mana orang boleh membuat aduan secara bertulis kepada
Lembaga berkenaan dengan salah laku profesional seorang juruukur tanah berlesen dan aduan itu hendaklah diserahkan kepada Lembaga.
(2)
Aduan yang dibuat di bawah subperaturan (1) hendaklah mengandungi butir-butir berikut:
(a)
nama penuh, nombor kad pengenalan atau nombor pasport dan alamat pengadu;
(b)
fakta berkenaan dengan aduan;
(c)
salinan apa-apa dokumen sokongan berhubung dengan aduan;
(d)
tandatangan pengadu; dan
(e)
nama dan alamat peguam pengadu, sekiranya ada.
(3)
Selepas menerima aduan, Setiausaha hendaklah—
(a)
mengecap tarikh penerimaan dokumen aduan itu; dan
(b)
menentukan bahawa keperluan di bawah subperaturan (2) berkenaan dengan aduan telah dipatuhi.”.
P.U. (A) 309 22
Pindaan peraturan 33 28.
Peraturan 33
Peraturan-Peraturan ibu dipinda dengan menggantikan perenggan (a) dengan perenggan yang berikut:
“(a)
bahawa aduan itu tidak dibuat berdasarkan keperluan di bawah subperaturan 32(2); atau”.
Pindaan peraturan 34 29.
Subperaturan 34(2) Peraturan-peraturan ibu dipinda dalam perenggan (b)
dengan menggantikan perkataan “Pengarah Ukur” dengan perkataan “Pengarah Ukur dan Pemetaan”.
Pindaan peraturan 36 30.
Subperaturan 36(2) Peraturan-peraturan ibu dipinda dalam perenggan (c)
dengan menggantikan perkataan “Pengarah Ukur” dengan perkataan “Pengarah Ukur dan Pemetaan”.
Penggantian Jadual Kedua 31.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Kedua dengan jadual yang berikut:
“JADUAL KEDUA
[Peraturan 3 dan 14, subperaturan 4(1), 6(1), 7(2), 8(1), 8(6), 22(1), 23(3), 23(5)
dan perenggan 21(1)(b)]
PERATURAN-PERATURAN JURUUKUR TANAH 2011
FI
RM PERUNTUKAN
1. (i) Pendaftaran 250 3
Lesen amalan 500 4(1)
Pembaharuan lesen amalan 500
6(1)
P.U. (A) 309 23
”.
Pemasukan semula nama dalam Daftar 500
7(2)
2. Pendaftaran dan perubahan nama firma 1,000 8(1),8(6)
3. Pendaftaran Artikel 100 14
4. Fi peperiksaan yang kena dibayar kepada pemeriksa— 21(1)(b)
Menyediakan kertas peperiksaan 800 satu kertas
Menanda kertas peperiksaan bertulis 100 satu skrip jawapan
Menanda serahan tugas amali 400 satu tugasan
5. Fi yang kena dibayar kepada pengawas 400 satu hari 21(1)(b)
peperiksaan
6. Fi peperiksaan 22(1)
Bahagian I (Serahan tugas amali atau 400 setiap tugasan menghadiri kursus)
Bahagian II (Peperiksaan bertulis) 200 satu kertas
Bahagian III (Peperiksaan lisan) 400 satu kehadiran
7. Menyemak semula keputusan peperiksaan—
23 (3)
Bahagian I (Serahan tugas amali atau 800 setiap tugasan menghadiri kursus)
Bahagian II (Peperiksaan bertulis) 400 satu kertas
8. Kehadiran semula untuk Bahagian III
400 satu kehadiran 23(5)
(Peperiksaan Lisan)
9. Salinan terperaku suatu entri dalam Daftar 10 12(2)
P.U. (A) 309 24
Penggantian Jadual Ketiga 32.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Ketiga dengan jadual yang berikut:
“JADUAL KETIGA
[Subperaturan 4(1) dan 6(1)]
BORANG B
PERMOHONAN LESEN/PEMBAHARUAN LESEN MENJALANKAN AMALAN*
Setiausaha
Lembaga Juruukur Tanah
Saya, …………………..……………………………………, (No. K/P: ……….…………………) memohon lesen/pembaharuan lesen* untuk menjalankan amalan bagi tahun ……….…………... dan mengisytiharkan bahawa—
(a)
saya seorang warganegara Malaysia/seorang yang diluluskan oleh
Menteri* untuk menetap di Semenanjung Malaysia;
(b)
saya mampu untuk menjalankan tugas dan fungsi profesional saya dengan berkesan;
(c)
saya tidak pernah disabitkan atas kesalahan jenayah atau kesalahan yang melibatkan penipuan atau ketidakjujuran di Malaysia atau di tempat-tempat lain;
(d)
saya bukan bankrap yang belum dilepaskan atau satu perintah bankrap sedang berkuat kuasa terhadap saya; dan
P.U. (A) 309 25
”.
(e)
saya tidak dibenarkan untuk menjalankan profesion lain.
Butir-butir peribadi saya adalah seperti berikut:
No. Pendaftaran: …….………………………………………………………………………………………………
Jenis amalan (pilih satu) : ketuanpunyaan tunggal atau perkongsian atau pertubuhan perbadanan
Nama amalan: …………………………………................................................................................
Alamat: …………..………………………………………..…………………………………………….....
No. Telefon: .……………………………………………………………………………………………...
No. Faksimili: ….…………………………………………………………………………………….…...
Emel: …………….…………………………………………………………………………………….…….
Alamat Kediaman: ….……………………………………………………………………………….…
Perisytiharan di atas dibuat mengikut Akta Akuan Berkanun 1960 [Akta 13].
Bersama-sama ini disertakan fi berjumlah RM500.00.
………………………………..
Tandatangan pemohon
Tarikh: …………….……
Dihadapan saya,
……………………………..
Pesuruhjaya Sumpah
Tarikh: ……….…………
*potong mana yang tidak berkenaan
P.U. (A) 309 26
”.
Penggantian Jadual Keempat 33.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Keempat dengan jadual yang berikut:
“JADUAL KEEMPAT
[Subseksyen 10(1) dan peraturan 5]
LESEN MENJALAN AMALAN
Dengan ini diperakukan bahawa ……..................…………………………………………………………,
No. K/P ………………………………… yang telah didaftarkan di bawah Akta Juruukur Tanah
Berlesen 1958 [Akta 458], diberi lesen amalan dari …………………..................… hingga 31 Disember …………………
Bertarikh hari ini ……………. haribulan …………………………., ……………
(CAP METERAI LEMBAGA)
………………………………...
Setiausaha Lembaga
P.U. (A) 309 27
Penggantian Jadual Kelima 34.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Kelima dengan jadual yang berikut:
“JADUAL KELIMA
[Subperaturan 8(3)]
PERAKUAN PENDAFTARAN NAMA AMALAN
No. Sijil ……………………
Dengan ini diperakukan bahawa—
Nama: .......................................................................................................................................
Alamat: ....................................................................................................................................................
........................................................................................................................................................................
No. Telefon: .........................................................................................
No. Faksimili: .............................................................................................
Emel: ..........................................................................................................
Setelah memohon untuk pendaftaran nama amalan dan setelah membayar fi yang ditetapkan dibenarkan untuk menjalankan amalan di bawah nama seperti yang di bawah:
Nama amalan: ..................................................................................
Jenis amalan: Ketuanpunyaan tunggal atau perkongsian atau pertubuhan perbadanan
Sijil ini hendaklah dikembalikan kepada Lembaga sekiranya jenis amalan berubah.
Bertarikh hari ini …………….. haribulan …………………………….., ………….
P.U. (A) 309 28
”.
( CAP METERAI LEMBAGA)
...................................................................
Setiausaha Lembaga
*potong mana yang tidak berkenaan
Penggantian Jadual Ketujuh 35.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Ketujuh dengan jadual yang berikut:
“JADUAL KETUJUH
[Subperaturan 22(2) dan perenggan 13(2)(a)]
PENGIKTIRAFAN KELAYAKAN
1.
Kelulusan yang diiktiraf
(a)
Malaysia
(i)
Ijazah Sarjana Muda Ukur (Tanah)
Universiti Teknologi Malaysia
(ii)
Ijazah Sarjana Muda Kejuruteraan (Geomatik)
Universiti Teknologi Malaysia
Ijazah Sarjana Muda Kejuruteraan Geomatik
Universiti Teknologi Malaysia
P.U. (A) 309 29
Diploma Lanjutan Ukur Tanah
Universiti Teknologi MARA (UiTM)
(v)
Ijazah Sarjana Muda Sains Geomatik
Universiti Teknologi MARA (UiTM)
(vi)
Ijazah Sarjana Muda Sains Ukur dan Geomatik (Kepujian)
Universiti Teknologi MARA (UiTM)
Lulus dalam Peperiksaan Akhir atau Peperiksaan Akhir Terus
Pertubuhan Juruukur Malaysia (sebelum Januari 2007)
Sarjana Muda Sains (Kepujian) Geomatik dan Ukur Tanah
Universiti Geomatika Malaysia (selepas 13 Julai 2022)
(b)
Australia
(i)
Bachelor of Surveying
University of Queensland (sebelum Januari 2024)
(ii)
Bachelor of Surveying
University of New South Wales
Bachelor of Surveying
University of Melbourne
Bachelor of Geomatics
University of Melbourne
Bachelor of Geomatics/Bachelor of Science (Computer Science)
University of Melbourne
P.U. (A) 309 30
(vi)
Bachelor of Geomatics/Bachelor of Science (Environmental Science)
University of Melbourne
(vii)
Bachelor of Applied Science (Land Surveying)
Royal Melbourne Institute of Technology (sebelum Januari 2024)
Bachelor of Applied Science (Land Surveying)
Western Australia Institute of Technology (sebelum Januari 2024)
(ix)
Bachelor of Surveying
Curtin University of Technology
(x)
Bachelor of Surveying
University of South Australia (sebelum Januari 2024)
(xi)
Bachelor of Geoinformatics and Surveying
University of South Australia (sebelum Januari 2024)
Bachelor of Applied Science in Surveying
South Australia Institute of Technology (sebelum Januari 2024)
Bachelor of Surveying
University of Tasmania (sebelum November 2016)
Bachelor of Geomatics
University of Tasmania (sebelum November 2021)
Bachelor of Engineering (Honours) Surveying
University of Newcastle (sebelum Oktober 2020)
P.U. (A) 309 31
(c)
Kanada
(i)
B. Sc. in Engineering (Surveying Engineering)
University of New Brunswick (sebelum Januari 2024)
(ii)
B. Sc. in Engineering (Geomatics Engineering)
University of New Brunswick (sebelum Januari 2024)
(d)
New Zealand
(i)
Bachelor of Surveying
University of Otago (sebelum Oktober 1990 dan selepas
Disember 2002 hingga Disember 2023)
(e)
United Kingdom
(i)
B. Sc. Surveying Science (Honours)
University of Newcastle-upon-Tyne (sebelum Januari 2014)
(ii)
B. Sc. Surveying and Mapping Science (Honours)
University of Newcastle-upon-Tyne (sebelum Januari 2019)
Bachelor of Engineering (Hons) in Geospatial Surveying and Mapping
University of Newcastle-upon-Tyne (sebelum Januari 2024)
(iv)
B. Sc. in Land Surveying Sciences
North East London Polytechnic
(v)
B. Sc. Surveying and Mapping Sciences
University of East London
(vi)
B. Sc. in Topographic Science (Senior Honours)
University of Glasgow (sebelum Januari 2024)
P.U. (A) 309 32
(vii)
Associate of the Royal Institute of Chartered Surveyors
(sebelum Januari 1984)
(f)
Hong Kong
(i)
B. Sc (Hons) In Land Surveying and Geoinformatics
Hong Kong Polytechnic University (selepas April 2019)
2.
Kriteria pengiktirafan
Pengiktirafan diiktiraf berdasarkan kriteria berikut:
(a)
tempoh pengajian tidak kurang dari tiga tahun kalendar akademik dan jumlah pengajian tidak kurang 120 jam kredit; dan
(b)
kelulusan ukur tanah atau ukur geomatik hendaklah mengandungi minimum 12 subjek yang kandungannya adalah berkaitan dengan yang berikut:
(i)
ukur satah dan kejuruteraan;
(ii)
ukur geodetik;
(iii)
ukur kadaster;
(iv)
pelarasan ukur;
(v)
sistem koordinat dan unjuran peta;
(vi)
ukur dari udara;
(vii)
ukur hidrografi;
pemetaan dan kartografi; dan
sains maklumat spatial.
”.
P.U. (A) 309 33
Penggantian Jadual Kelapan 36.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Kelapan dengan jadual yang berikut:
“JADUAL KELAPAN
[Subperaturan 16(2) dan 16(4)]
PENYATAAN LATIHAN
Saya mengaku bahawa ini adalah pernyataan benar mengenai latihan seperti yang tersenarai di bawah:
Latihan
Ruj Fail
Jabatan
Ukur dan
Pemetaan
(jika berkaitan)
Jumlah
Lot/
Keluasan
Tempoh
Bekerja
(dalam minggu)
Ruj
Fail
JTB
Perihalan
Kerja
1. Lapangan
Ukur hakmilik
Ukur Geomatik
Ukur lain-lain
JUMLAH TEMPOH MASA
2. Pejabat
Pemprosesan ukur hakmilik
hitungan dan pemplotan
penyuntingan dan semakan
siasatan rekod tanah dan ukur
P.U. (A) 309 34
”.
Pemprosesan ukur kejuruteraan
Pemprosesan ukur topografi
Pengurusan dan pengawasan ukur
Lain-lain
JUMLAH TEMPOH MASA
………………………………….
Orang berartikel
Tarikh: …………………..
Saya, …………………………………………….., dari ……………………………….……………………………..,
(juruukur tanah berlesen) (alamat semasa)
mengesahkan bahawa …………………………………… telah menerima latihan sebagaimana
(orang berartikel)
yang dinyatakan di atas dalam profesion ukur tanah di bawah arahan peribadi dan penyeliaan di lapangan untuk tempoh dari……………………… hingga ……………..……………….
……………………………………………………………
Juruukur tanah berlesen
Pemotongan Jadual Kesembilan 37.
Peraturan-Peraturan ibu dipinda dengan memotong Jadual Kesembilan.
P.U. (A) 309 35
Penggantian Jadual Kesepuluh 38.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Kesepuluh dengan jadual yang berikut:
“JADUAL KESEPULUH
[Subperaturan 22(1)]
PERMOHONAN UNTUK PEPERIKSAAN
Kepada:
Setiausaha,
Lembaga Juruukur Tanah
Saya, ……………………………………….…………… [No. K/P ….……………………………] memohon untuk menduduki:
(i)
Bahagian I peperiksaan dengan bayaran RM 400.00
setiap tugasan - RM__________
(ii)
Bahagian II peperiksaan dengan bayaran RM200.00
setiap kertas - RM__________
(iii)
Bahagian III peperiksaan dengan bayaran RM 400.00
setiap kehadiran - RM__________
Saya bersetuju untuk mematuhi kaedah-kaedah peperiksaan.
………………………………………..
Tandatangan pemohon
Tarikh : …………………………
”.
P.U. (A) 309 36
”.
Penggantian Jadual Kesebelas 39.
Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Kesebelas dengan jadual yang berikut:
“JADUAL KESEBELAS
[Perenggan 22(2)]
PERATURAN-PERATURAN JURUUKUR TANAH BERLESEN 2011
PERAKUAN PERKHIDMATAN DI BAWAH ARTIKEL
Saya, ……………………………………………………………… dengan ini memperakui seperti berikut:
(juruukur tanah berlesen)
…………………………………………………….…….. telah menjalankan tugas di bawah Artikel
(orang berartikel)
dalam amalan ukur tanah untuk tempoh…………………… tahun dan…………………… bulan dari …………… hingga …………………
Dalam tempoh tersebut orang berartikel telah menjalankan tugas untuk di lapangan dan di pejabat untuk ………..….......…… tahun dan …..………......…… bulan, yang
………….…...… tahun dan …….......….. bulan dalam ukur hakmilik dan …….....…..…. tahun dan
…................ bulan dalam ukur geomatik.
Orang berartikel ini berupaya menjalankan ukur hakmilik dan ukur geomatik secara bersendirian.
Bertarikh hari ini …………… haribulan ………………………………., ……….
…..…………………………………………………..
Juruukur tanah berlesen
P.U. (A) 309 37
Jadual baharu Kelima Belas 40.
Peraturan-Peraturan ibu dipinda dengan memasukkan selepas
Jadual Keempat Belas jadual yang berikut:
“JADUAL KELIMA BELAS
[Subperaturan 28A]
PERATURAN-PERATURAN JURUUKUR TANAH 2011
BIDANG AMALAN UNTUK UKUR GEOMATIK
1.
PENGUKURAN DAN PEMETAAN BAWAAN UDARA
Pengukuran dan Pemetaan Bawaan Udara adalah teknik penggambaran dan pengimejan permukaan bumi dengan optik, Light Detection and
Ranging (LiDAR), Radio Detection and Ranging (RADAR) dan sistem elektromagnetik yang dipasang pada pesawat tanpa pemandu (UAV) atau pesawat untuk menghasilkan pelan atau peta.
2.
PENGUKURAN GEODETIK
Ukur geodetik adalah penentuan kedudukan tepat tiga-dimensi pada atau di atas permukaan bumi dan penentuan ketinggian berdasarkan kaedah datum aras laut, dengan mengambil kira geometri bumi dan medan graviti.
Ia digunakan untuk menentukan ukuran yang jitu dan tepat bagi kawalan jaringan, tanda rujukan terlaras, penanda aras ketinggian menggunakan ukuran jitu terestrial, satelit, atau cerapan astronomi.
P.U. (A) 309 38 3.
PENGUKURAN DAN PEMETAAN HIDROGRAFI
3.1
Pengukuran dan Pemetaan Hidrografi adalah pengukuran dan pemetaan perairan darat untuk menghasilkan pelan batimetri perairan darat untuk pelbagai pemakaian seperti yang berikut:
(i)
pengurusan zon pantai;
(ii)
ukur hidrografi bagi kawasan delta dan muara sungai sehingga ke garis air surut;
(iii)
pembangunan kejuruteraan pinggir laut, hartanah, projek dan aktiviti infrastruktur;
(iv)
pengurusan dan pembangunan jeti, pelabuhan dan kemudahan maritim yang berkaitan; dan
(v)
pengurusan dan pembangunan di sepanjang laluan air darat dan perairan darat.
3.2
Bagi pengukuran dan pemetaan hidrografi ini, perairan darat bermaksud reservoir, kolam, tasik, sungai, alur, terusan, saliran, mata air atau perigi, atau mana-mana bahagian laut di atas garis air surut di persisiran pantai, atau mana-mana bahagian badan permukaan air atau bawah permukaan air yang bersifat semula jadi atau buatan. Pengukuran dan pemetaan hidrografi ini tidak termasuk bagi aktiviti pelombongan pasir atau hakisan pinggir laut.
4.
PENGUKURAN DAN PEMETAAN KERJA-KERJA KEJURUTERAAN
4.1
Pengukuran dan Pemetaan untuk Kerja-Kerja Kejuruteraan adalah proses penentuan titik relatif lokasi, rupa bumi, fitur semula jadi dan buatan sedia ada pada permukaan bumi dengan mengukur
P.U. (A) 309 39
jarak mendatar, perbezaan ketinggian dan arah yang diikat dengan titik kawalan datar dan pugak untuk menghasilkan pelan berdasarkan klasifikasi ukur kejuruteraan dan spesifikasi untuk tujuan kejuruteraan.
4.2
Klasifikasi
Pengukuran dan
Pemetaan bagi
Kerja-Kerja
Kejuruteraan adalah seperti yang berikut:
(i)
Ukur Tapak;
(ii)
Keratan rentas dengan Pemeruman untuk Tapak Jabatan;
(iii)
Ukur Jalan dan Landasan Kereta Api;
(iv)
Ukur Talian Paip;
(v)
Ukur Kejuruteraan untuk Saliran dan Pengairan;
(vi)
Ukur Laluan Air; dan
(vii)
Ukur Kejuruteraan untuk Talian Penghantaran.
5.
PENGUKURAN DAN PEMETAAN BAGI PEMODELAN MAKLUMAT
BANGUNAN (BIM)
Pengukuran dan Pemetaan bagi BIM bermaksud untuk menawan dan menghasilkan data geospatial untuk proses berasaskan model 3D pintar yang memberikan kefahaman maklumat dan perkakasan kepada pakar
Seni Bina, Kejuruteraan dan Pembinaan (AEC) untuk merancang, mereka-bentuk, membina, dan menguruskan bangunan dan infrastuktur dengan lebih cekap.
P.U. (A) 309 40
”.
6.
PENGUKURAN DAN PEMETAAN BAGI SISTEM MAKLUMAT GEOGRAFI
(GIS)
Pengukuran dan Pemetaan untuk GIS terdiri daripada kerja berkaitan dengan penawanan data, kemasukan, penukaran, integrasi dan pengurusan data dan maklumat berkenaan dengan lokasi, bentuk, sempadan, dan pemerihalan fitur geografi yang dihasilkan daripada ukur geomatik atau sumber data lain ke dalam format data, struktur, dan pangkalan data yang bersesuaian.
7.
PENGUKURAN DAN PEMETAAN TERESTRIAL
Pengukuran dan Pemetaan Terestrial bermaksud kaedah penawanan data menggunakan teknologi pemetaan statik dan mudah alih yang berasaskan integrasi pelbagai penentududukan, navigasi dan pengutipan data pengimejan yang membentuk sistem pemetaan statik atau mudah alih.
8.
PENGUKURAN DAN PEMETAAN TOPOGRAFI
Pengukuran dan Pemetaan Topografi ialah kaedah penentuan titik lokasi relatif, rupa bumi, fitur semula jadi sedia ada dan buatan manusia pada permukaan bumi dengan mengukur jarak mendatar, perbezaan dalam ketinggian dan arah yang terikat kepada titik kawalan mendatar dan pugak untuk menghasilkan pelan topografi berskala besar.
9.
PENGUKURAN DAN PEMETAAN BAWAH TANAH
Pengukuran dan Pemetaan Bawah Tanah bermaksud proses menyediakan dan mengeluarkan pelan bawah permukaan melalui kaedah mengesan, mengimbas, menentu, mengenal pasti dan melabel objek, fitur dan utiliti bawah tanah.
P.U. (A) 309 41
Kecualian 41.
(1)
Mana-mana orang berartikel yang telah lulus Bahagian I peperiksaan di bawah Peraturan-Peraturan ibu sebaik sebelum kuat kuasa Peraturan-Peraturan ini hendaklah diterima sebagai lulus dalam Bahagian II peperiksaan di bawah
Peraturan-Peraturan ini.
(2)
Mana-mana orang berartikel yang telah lulus apa-apa tugas amali dalam
Bahagian II peperiksaan di bawah Peraturan-Peraturan ibu sebaik sebelum kuat kuasa
Peraturan-Peraturan ini boleh diterima oleh Lembaga sebagai lulus Bahagian I bagi tugas amali yang setara di bawah Peraturan-Peraturan ini.
(3)
Mana-mana orang berartikel yang belum menyelesaikan tugas amalinya dalam Bahagian II peperiksaan di bawah Bahagian V Peraturan-Peraturan ibu sebaik sebelum kuat kuasa Peraturan-Peraturan ini, boleh terus diuruskan di bawah
Peraturan-Peraturan ibu dalam tempoh tiga tahun dari tarikh kuat kuasa
Peraturan-Peraturan ini seolah-olah Peraturan-Peraturan ibu tidak dipinda oleh
Peraturan-Peraturan ini.
Dibuat 16 Oktober 2024
[NRES.BTUG.U.(R) 100-1/3/1; PN(PU2)165/VIII]
DATO’ Sr HAZRI BIN HASSAN
Pengerusi
Lembaga Juruukur Tanah
Diluluskan 18 Oktober 2024
NIK NAZMI BIN NIK AHMAD
Menteri Sumber Asli dan
Kelestarian Alam
P.U. (A) 309 42
LICENSED LAND SURVEYORS (AMENDMENT) REGULATIONS 2024
IN exercise of the powers conferred by subsection 21(2)
of the
Licensed Land Surveyors Act 1958 [Act 458], the Board, with the approval of the Minister, makes the following regulations:
Citation and commencement 1.
(1)
These regulations may be cited as the Licensed Land Surveyors
(Amendment) Regulations 2024.
(2)
These Regulations come into operation on 23 October 2024.
Amendment of regulation 2 2.
The
Licensed
Land
Surveyors
Regulations 2011
[P.U.(A)331/2011], which are referred to as the “principal Regulations” in these Regulations are amended in regulation 2—
(a)
in the definition of “Articles”, by inserting after the words “articled person”
the words “other than a Government surveyor”;
(b)
by substituting for the definition “articled person” the following definition:
‘ “articled person” means—
(a)
a person who has entered into Articles with a licensed land surveyor and is registered under paragraph 12(1)(c); or
(b)
a Government surveyor who has submitted a certificate issued by the Director General of Survey and Mapping under regulation 15A to the
Board and is registered under paragraph 12(1)(c);’;
P.U. (A) 309 43
(c)
by substituting for the definition “plan” the following definition:
‘ “plan” means any survey plan or geomatics survey plan;’;
(d)
by substituting for the definition “Director of Survey and Mapping”
the following definition:
‘ “Director of Survey and Mapping” means the officer performing the duties of the head of the Survey and Mapping Department Malaysia at a state, and includes an officer acting on his behalf;’; and
(e)
by deleting the definition of “Secretary”.
Substitution of regulation 3 3.
The principal Regulations are amended by substituting for regulation 3
the following regulations:
“Application for registration 3.
(1)
Every person entitled to be registered under subsection 9(1) of the Act shall apply to the Board in the form as prescribed in the First Schedule together with payment of the fee as prescribed in the Second Schedule.
(2)
Upon receipt of the application for registration under subregulation (1), the Board shall decide on the application within three months from the date of receipt of such application.
(3)
Every applicant shall be notified of the decision of the Board in writing within two months from the date of the decision.
(4)
A Government surveyor whose name has been placed in the Register under subsection 9(2) of the Act shall remain in the Register for a period no longer than six months from the date he ceases to be a Government surveyor.
P.U. (A) 309 44
(5)
Upon expiry of the period as provided in subregulation (4), the Secretary shall remove the name of such Government surveyor from the Register if no application for licence to practice has been made under regulation 4.”.
Amendment of regulation 6 4.
Regulation 6 of the principal Regulations is amended by inserting after subregulation (1) the following subregulation:
“(1A)
Upon request by the Board, a licensed land surveyor shall provide proof of residency in Peninsular Malaysia or Federal Territory of
Labuan of at least six months in a calendar year or any other period to the satisfaction of the Board.”.
Substitution of regulation 8 5.
The principal Regulations are amended by substituting for regulation 8
the following regulation:
“Practice and practice name 8.
(1)
A licensed land surveyor who desires to practise shall make an application in writing to the Board in his practice name as a sole proprietorship, partnership or body corporate with the payment of registration fee as prescribed in the Second Schedule.
(2)
The Board shall register a licensed land surveyor practice as a sole proprietorship, partnership or body corporate, subject to such conditions and restrictions as it may deem fit to impose, where—
(a)
in the case of a sole proprietorship, the sole proprietor is a licensed land surveyor;
(b)
in the case of a partnership, all partners are licensed land surveyor; or
P.U. (A) 309 45
(c)
in the case of a body corporate—
(i)
the board of directors are licensed land surveyor;
(ii)
it has shareholders as may be determined by the
Board;
(iii)
it has a minimum paid-up capital which the amount as determined by the Board; and
(iv)
the affairs of the body corporate shall be under the control and management of a person who is a licensed land surveyor and authorized under a resolution of the board of directors of the body corporate to make all decisions on behalf of the body corporate related to the requirements under this regulation.
(3)
Upon approval of the application made under subregulation (1), the Board shall issue a certificate of registration of practice name as prescribed in the Fifth Schedule and may impose any conditions as it thinks fit.
(4)
The Board may cancel the certificate of registration of practice name issued under subregulation (3) if the licensed land surveyor to whom the certificate of registration of practice name has been issued to has failed to comply with any conditions upon issuance of the certificate of registration of practice name.
(5)
A licensed land surveyor who desires to change his practice name, shall apply in writing for the Board's approval.
P.U. (A) 309 46
(6)
Upon the Board’s approval on the proposed change in practice name, fee as prescribed in the Second Schedule shall be paid within one month from the date of notification by the Board.
(7)
A licensed land surveyor may own equity in more than one practice name.
(8)
Notwithstanding subregulation (7), a licensed land surveyor shall practice under one practice name only.
(9)
A licensed land surveyor shall, within one month of the occurrence of any change of its sole proprietorship, or the composition of its partners, members of the board of directors or shareholders, furnish to the Board a report in writing giving full particulars of the change and obtain the Board's approval on the latest composition or type of licensed land surveyor practice.”.
Amendment of regulation 9 6.
Regulation 9 of the principal Regulations is amended in the shoulder note, by substituting for the word “firm’s” the words “practice name”.
Amendment of regulation 10 7.
Regulation 10 of the principal Regulations is amended by substituting for subregulation (1) the following subregulation:
“(1)
Where a licensed land surveyor practising as a partnership or body corporate maintains a branch office—
(a)
such branch office shall operate in the practice name referred to in subregulation 8(3); and
(b)
such branch office shall continuously manned by a licensed land surveyor.”.
P.U. (A) 309 47
Amendment of regulation 11 8.
The principal Regulations are amended in regulation 11 by substituting for the words “regulation 4” the words “regulation 5”.
Amendment of regulation 12 9.
Subregulation 12(1) is amended—
(a)
in paragraph (b), by deleting the word “and” at the end of that paragraph;
(b)
by substituting for paragraph (c) the following paragraph:
“(c)
articled person; and”; and
(c)
by inserting after paragraph (c) the following paragraph:
“(d)
assistant who is a geomatics technologist or geomatics technician.”.
Substitution of Part III
10.
The principal Regulations are amended by substituting for Part III the following part:
“PART III
ARTICLES AND ARTICLED PERSON
Period and condition of Articles 13.
(1)
An Articles shall be for a period of two years and shall be in the form as prescribed in the Sixth Schedule.
(2)
Before a person enters into an Articles, he shall produce the evidence that he has obtained—
(a)
any qualification as set out in the Seventh Schedule; or
P.U. (A) 309 48
(b)
any qualification related to geomatics survey, as the
Minister may approve, upon recommendation of the Board.
(3)
A person who holds the qualification as approved by the Minister under paragraph 2(b) shall pass any examination as determined by the Board before he enters into an Articles.
(4)
No licensed land surveyor shall take any articled person under an
Articles unless he has been licensed by the Board for more than five years.
Articles to be submitted to Secretary 14.
A licensed land surveyor shall, within three months from the date of execution of the Articles, submit the Articles to the Secretary together with the educational certificate, birth certificate, proof of citizenship of the articled person and the fee for registration of Articles as prescribed in the Second Schedule.
Registration and annulment of Articles 15.
(1)
The Secretary, subject to the direction of the Board, shall as soon as possible after the receipt of any Articles under regulation 14, register such Articles in the Register kept in accordance with regulation 12.
(2)
The Board shall direct the Secretary to refuse the registration of any Articles if—
(a)
the requirements under regulation 14 are not complied with; or
(b)
the licensed land surveyor has ten articled persons.
(3)
Any party may annul the Articles by giving a notice in writing to the other party within the period of at least fourteen days and at the same time that party shall inform the Board in respect of such annulment.
P.U. (A) 309 49
(4)
The Board may remove the name of the articled person from the Register—
(a)
upon annulment made under subregulation (3); or
(b)
upon his registration under section 9 of the Act.
(5)
The Board may annul the registration of any Articles, if such registration has been obtained by means of fraud, false representation or concealment of any material fact, or if such registration was affected by reason of mistake or error.
Registration of Government surveyor as articled person 15A.
A Government surveyor who has served in the field of land survey or geomatics survey for at least two years may make an application to the Board to be registered as an articled person provided that his application for registration under subsection 9(1) of the Act has been supported by a certificate from the
Director General of Survey and Mapping that such Government surveyor is fit and proper to be registered with the Board.”.
Substitution of regulation 16 11.
The principal Regulations are amended by substituting for regulations 16
the following regulations:
“Training for articled person 16.
(1)
Every articled person shall serve training as follows:
(a)
twelve (12) months in title survey; and
(b)
twelve (12) months in geomatics survey.
P.U. (A) 309 50
(2)
The licensed land surveyor who had entered into an Articles shall submit to the Secretary a statement in the form as prescribed in the Eighth Schedule for the period ending thirty-first December of each year not later than thirty days after the end of such period.
(3)
When the Board is of the opinion that an articled person has not received sufficient training, the Board may require such person to obtain additional training.
(4)
The Board may accept experience in title survey and geomatics survey gained by an articled person who has experience as a Government surveyor or a lecturer at any university or institution recognised by the Board provided that such experience is certified by a statement of training in the form as prescribed in the Eighth Schedule issued by the Director General of Survey and Mapping.
(5)
Upon consideration of subregulation (4), the Board may determine the period of training for an articled person who has experience as a Government surveyor or a lecturer at any university or institutions recognised by the Board.”.
Substitution of regulation 17 12.
The principal Regulations are amended by substituting for regulation 17
the following regulation:
“Professional development course 17.
The Board shall cause to conduct and certify any professional development course in relation to title survey and geomatics survey for licensed land surveyors and his assistant, if necessary.”.
Deletion of regulation 18 13.
The principal Regulations are amended by deleting regulation 18.
P.U. (A) 309 51
Substitution of regulation 19 14.
The principal Regulations are amended by substituting for regulations 19
the following regulations:
“Examinations 19.
(1)
The examinations shall consist of—
(a)
Part I – submission of practical task or attending courses;
(b)
Part II – written examination in cadastral and geomatics survey; and
(c)
Part III – oral examination.
(2)
Notwithstanding perenggan (1)(a), the Board may determine the extent of the examination in Part I of the examination based on the qualification and experience gained by a person.
(3)
The Board shall determine the syllabus for Parts I, II and III of the examination in its guidelines.”.
Substitution of regulation 20 15.
The principal Regulations are amended by substituting for regulation 20
the following regulation:
“Eligibility 20.
(1)
An articled person shall be eligible to sit for Parts I, II and III of the examination as provided under regulation 19.
(2)
An articled person may submit practical tasks or attend courses for the purposes of Part I of the examination in accordance with the guidelines under subregulation 19(3).
P.U. (A) 309 52
(3)
Prior to submission of the practical tasks or attend courses under Part I of the examination, the Board may require the articled person to produce evidence that—
(a)
he has complied with the requirements of the Board during the period of his Articles; or
(b)
he has obtained experience as may be required by the
Board.
(4)
No person shall be eligible for Part II of the examination unless he is—
(a)
an articled person who has completed at least two years of his Articles;
(b)
a Government surveyor who has been registered as an articled person; or
(c)
an articled person who is employed as a lecturer with at least five years of experience at any higher educational institution established under the Universities and
University Colleges Act 1971 [Act 30], Universiti
Teknologi MARA Act 1976 [Act 173], or any institution recognised by the Board.
(5)
An articled person shall be eligible to sit for Part III of the examination after one month of being credited with a pass for Parts I and II of the examination.”.
P.U. (A) 309 53
Amendment of regulation 21 16.
Subregulation 21(5) of the principal Regulations is amended—
(a)
by substituting for the words “in at least two national daily newspapers”
the words “in any electronic medium”; and
(b)
by substituting for the words “Part I” the words “Part II”.
Substitution of regulation 22 17.
The principal Regulations are amended by substituting for regulations 22
the following regulations:
“Application for examination 22.
(1)
An articled person desirous of sitting for Parts I, II and III of the examination shall make an application in the form as prescribed in the Tenth Schedule to the Secretary together with the examination fee as prescribed in the Second Schedule.
(2)
An articled person desirous of sitting for Part II of the examination shall submit a certificate of service in the form as prescribed in the Eleventh Schedule from the licensed land surveyor with whom he served under Articles or a letter of recommendation issued by the Director General of
Survey and Mapping.”.
Amendment of regulation 23 18.
Subregulation 23(1) of the principal Regulations is amended by substituting for the words “Part I” the words “Part II”.
P.U. (A) 309 54
New Part VA
19.
The principal Regulations are amended by inserting after regulation 24
the following part:
“PART VA
ASSISTANT
Assistant 24A. (1)
A licensed land surveyor may employ any assistant to undertake title survey or geomatics survey and such assistant may include—
(a)
a geomatics technologist—
(i)
if he obtained a first degree in geomatics survey, land surveying or any other qualifications related to geomatics survey from any of the institution or universities recognised by the Board; or
(ii)
if he obtained a first degree in any field and holds competency certification in the field of title survey or geomatics survey as recognised by the Board;
(b)
a geomatics technician—
(i)
if he obtained a certificate, diploma in geomatics survey, land surveying or any other qualifications related to geomatics survey from any of the institution or universities recognised by the Board; or
(ii)
if he obtained a certificate, diploma in any field and competency certification in the field of title survey or geomatics survey recognised by the Board.
P.U. (A) 309 55
Name of assistant to be submitted to Secretary 24B.
(1)
A licensed land surveyor shall, within three months from the date of employing an assistant who is a geomatics technologist and a geomatics technician, submit the name of such assistant to the Secretary together with any identification document as required by the Board.
(2)
The Board may require licensed land surveyor to submit to the Secretary a full confidential report containing any particulars in relation to the assistant employed by a licensed land surveyor.
(3)
The licensed land surveyor shall notify the Board when such assistant ceases to be employed by him.”.
Amendment of Part VI
20.
Part VI of the principal Regulations is amended in the heading, by substituting for the words “CONDUCT OF TITLE SURVEYS” the words “TITLE SURVEY AND
GEOMATICS SURVEY”.
Amendment of regulation 25 21.
The principal Regulations are amended in regulation 25—
(a)
by renumbering the existing regulation as subregulation (1);
(b)
in subregulation (1) as renumbered—
(i)
by substituting for the words “and guidelines” the words “guidelines and specifications for title survey and geomatics survey”;
(ii)
by substituting for the words “Director General of Survey” the words “Director General of Survey and Mapping or the Board”; and
P.U. (A) 309 56
(c)
by inserting after subregulation (1) as renumbered the following subregulation:
“(2)
Every title survey and geomatics survey shall be conducted under the immediate personal direction or supervision of licensed land surveyor and in accordance with these regulations.”.
New regulation 25A
22.
The principal Regulations are amended by inserting after regulation 25
the following regulation:
“Conduct of title survey 25A.
A licensed land surveyor shall undertake title survey for the purpose of deposition of title survey plan with the Survey and Mapping Department.”.
Amendment of regulation 26 23.
Regulation 26 of the principal Regulations is amended—
(a)
by substituting for subregulation (1) the following subregulation:
“(1)
In the case of title survey, a licensed land surveyor shall cause a deposit of survey fee in full with the Board as prescribed in the Thirteenth Schedule prior to the commencement of any title survey.”;
(b)
by inserting after subregulation (1) the following subregulation:
“(1A) In the case of geomatics survey, a licensed land surveyor may cause a deposit of survey fee in full with the Board prior to the commencement of any geomatics survey.”;
(c)
in subregulation (6), by substituting for the words “Director of Survey”
the words “Director of Survey and Mapping”;
P.U. (A) 309 57
(d)
in subregulation (7), by substituting for the word “subparagraph (6)”
the words “subregulation (6) and any refund in relation to subregulation (1A),”; and
(e)
by inserting after subregulation (8) the following subregulation:
“(9)
In the event of any correction of errors undertaken by the
Survey and Mapping Department under subsection 16(3) of the Act, the
Board may reimburse such cost with the deposited survey fee for the title survey work.”.
Amendment of regulation 27 24.
Subregulation 27(2) of the principal Regulations is amended by substituting for the words “Department of Survey” the words “Survey and Mapping Department”.
New regulation 28A
25.
The principal Regulations are amended by inserting after regulation 28
the following regulation:
“Practice and conduct of geomatic survey 28A.
(1)
A licensed land surveyor shall carry out geomatic survey in the area of practice as prescribed in the Fifteenth Schedule for the purpose of—
(a)
the submission of any geomatic survey plan as required by any authority of the Federal Government or the State
Government, or the local authority;
(b)
the preparation of any geomatic survey plan in carrying out works for public purpose as determined by the
Federal Government, the State Government or the local authority; and
P.U. (A) 309 58
(c)
the preparation of any geomatic survey plan as required by—
(i)
any department of the Federal Government or the State Government;
(ii)
any agency or statutory body of the Federal
Government or the State Government;
(iii)
any local authority;
(iv)
any of the Federal Government or the State
Government link company; or
(v)
any company appointed by the
Federal
Government, the State Government or the local authority.
(2)
Any geomatic survey under subregulation (1) shall use the survey-accurate techniques which is a process in determining—
(a)
the form, contour, position, area, height, depth or any other particulars of—
(i)
the earth’s surface, whether of land or water; or
(ii)
any natural or artificial features on, below or above any part of the earth’s surface; or
(b)
the position or the boundary of any part of the earth’s surface, or of any natural or artificial features referred to in subparagraph (2)(a)(ii), and includes the act or process of making or obtaining any plan therefrom using
P.U. (A) 309 59
standards and specifications as determined by the
Director General of Survey and Mapping.”.
Amendment of regulation 29 26.
Subregulation 29(1) of the principal Regulations is amended in paragraph (e)
by inserting after the words “not be dishonest or fraudulent in” the words
“making representation or”.
Substitution of regulation 32 27.
The principal Regulations are amended by substituting for regulations 32 the following regulations:
“Complaint
32. (1)
Any person may make a complaint in writing to the Board about the professional misconduct of a licensed land surveyor and such complaint shall be lodged with the Board.
(2)
The complaint made under subregulation (1) shall contain the following particulars:
(a)
the full name, identification card number or passport number and address of the complainant;
(b)
the facts of the complaint;
(c)
copies of any supporting documents in relation to the complaint;
(d)
the signature of the complainant; and
(e)
the name and address of the complainant’s counsel, if any.
P.U. (A) 309 60
(3)
Upon receipt of the complaint, the Secretary shall—
(a)
stamp the date of its receipt on the document of complaint; and
(b)
ascertain that the requirements of subregulation (2)
in respect of the complaint have been complied with.”.
Amendment of regulation 33 28.
Regulation 33 of the principal Regulations is amended by substituting for paragraph (a) the following paragraph:
“(a)
that the complaint is not made in accordance with the requirements under subregulation 32(2); or”.
Amendment of regulation 34 29.
Subregulation 34(2) of the principal Regulations is amended in paragraph (b)
by substituting for the words “Director of Survey” the words “Director of Survey and Mapping”.
Amendment of regulation 36 30.
Subregulation 36(2) of the principal Regulations is amended in paragraph (c)
by substituting for the words “Director of Survey” the words “Director of Survey and Mapping”.
P.U. (A) 309 61
Substitution of Second Schedule 31.
The principal Regulations are amended by substituting for the Second Schedule the following schedule:
“SECOND SCHEDULE
[Regulations 3 and 14, subregulations 4(1), 6(1), 7(2), 8(1), 8(6), 22(1), 23(3), 23(5)
and paragraph 21(1)(b)]
FEES
RM PROVISION
1. (i) Registration 250 3
Licence to practice 500 4(1)
Renewal of licence to practice 500 6(1)
Restoration of name to the Register 500 7(2)
2. Registration and change of practice name 1,000 8(1),8(6)
3. Registration of Articles 100 14
4. Examination fees payable to examiners— 21(1)(b)
Setting an examination paper 800 per paper
Marking a written examination paper 100 per answer script
Marking of practical tasks submission 400 per task
5. Examination fees payable to invigilator 400 per day 21(1)(b)
6. Examination fees 22(1)
Part I (Submission of practical tasks 400 per submission or attending courses)
Part II (Written examination) 200 per paper
P.U. (A) 309 62
”.
Part III (Oral examination) 400 per appearance
7. Review of an examination results— 23 (3)
Part I (Submission of practical tasks 800 per task or attending courses)
Part II (Written examination) 400 per paper
8. Reappearance for Part III
400 per appearance 23(5)
(Oral examination)
9. Certified copy of an entry in a Register 10 12(2)
Substitution of Third Schedule 32.
The principal Regulations are amended by substituting for the Third Schedule the following schedule:
“THIRD SCHEDULE
[Subregulations 4(1) and 6(1)]
FORM B
APPLICATION FOR LICENCE/RENEWAL OF LICENCE TO PRACTICE*
The Secretary
Land Surveyors Board
I, …………………………………………..……………, (NRIC No.: ……..………………...…………………)
apply for a licence/renewal of a licence* to practice for the year ……………... and declare that—
P.U. (A) 309 63
(a)
I am a Malaysian citizen/person approved by the Minister* residing in
Peninsular Malaysia;
(b)
I am physically and mentally capable of performing my professional duty and function effectively;
(c)
I have not been convicted in Malaysia or elsewhere of a criminal offence or an offence involving fraud or dishonesty;
(d)
I am not an undischarged bankrupt or a receiving order in bankruptcy is in force against me; and
(e)
I am not authorised to practice another profession.
My personal particulars are as follows:
Registration no.: …………………………………………………………………….…………………………
Type of practice (choose one): sole proprietorship or partnership or body corporate
Practice name: …………………………………......................................
Address: …………..…………………………………………………………………...…………………….……
Telephone no.: .……………………………………………………………………..…………………………..
Facsimile no.: ….………………………………………………………………..……………………………….
E-mail: …………….……………………………………………………………………………………………….
Residential Address: ….…………………………………………………...…………………………………
The above declaration is made in accordance with the
Statutory Declarations Act 1960 [Act 13].
Please find enclose herewith the fee of RM500.
00.
P.U. (A) 309 64
”.
………………………………..
Signature of applicant
Date: ……………………..
Before me,
………………………………..
Commissioner for Oaths
Date: ……………………..
*delete where not applicable
Substitution of Fourth Schedule 33.
The principal Regulations are amended by substituting for the Fourth Schedule the following schedule:
“FOURTH SCHEDULE
[Subsection 10(1) and regulation 5]
LICENCE TO PRACTICE
This is to certify that ………………………………………..………………………………………………………,
NRIC number ………………………………… having been registered under the Licensed Land
Surveyors Act 1958 [Act 458], is licensed to practice from ………….…………………
to 31 December ………………..…………
Dated this ……………. day of …………………………., ……………
P.U. (A) 309 65
”.
(SEAL OF THE BOARD)
………………………………...
Secretary of the Board
Substitution of Fifth Schedule 34.
The principal Regulations is amended by substituting for the Fifth Schedule the following schedule:
“FIFTH SCHEDULE
[Subregulation 8(3)]
CERTIFICATE OF REGISTRATION OF PRACTICE NAME
Certificate No. ……………………
This is to certify that—
Name/Names: ........................................................................................................................................
Address: ....................................................................................................................................................
........................................................................................................................................................................
Telephone no.: .........................................................................................
Facsimile no.: .............................................................................................
E-mail: ..........................................................................................................
having applied for the registration of practice name and having paid the prescribed fee is authorised to practice in the name stated below:
Practice name: ...........................................................................................
Type of practice: sole proprietorship or partnership or body corporate
This certificate shall be returned to the Board if the mode of practice is changed.
P.U. (A) 309 66
”.
Dated this …………….. day of …………………………….., ………….
( SEAL OF THE BOARD )
...................................................................
Secretary of the Board
*delete where appropriate
Substitution of Seventh Schedule 35.
The principal Regulations are amended by substituting for the Seventh Schedule the following schedule:
“SEVENTH SCHEDULE
[Subregulations 22(2) and paragraph 13(2)(a)]
RECOGNITION OF QUALIFICATIONS
1.
Recognised qualifications
(a)
Malaysia
(i)
Bachelor of Survey (Land)
Universiti Teknologi Malaysia
(ii)
Bachelor of Engineering (Geomatics)
Universiti Teknologi Malaysia
P.U. (A) 309 67
(iii)
Bachelor of Geomatics Engineering
Universiti Teknologi Malaysia
(iv)
Advanced Diploma in Land Surveying
Universiti Teknologi MARA (UiTM)
(v)
Bachelor of Science in Geomatic
Universiti Teknologi MARA (UiTM)
(vi)
Bachelor of Surveying Science and Geomatics (Honours)
Universiti Teknologi MARA (UiTM)
Pass in the Final or Direct Final Examination Institution of
Surveyors, Malaysia (before January 2007)
Bachelor of Science (Hons) Geomatic and Land Surveying
Universiti Geomatika Malaysia (after 13 July 2022)
(b)
Australia
(i)
Bachelor of Surveying
University of Queensland (before January 2024)
(ii)
Bachelor of Surveying
University of New South Wales
(iii)
Bachelor of Surveying
University of Melbourne
(iv)
Bachelor of Geomatics
University of Melbourne
P.U. (A) 309 68
(v)
Bachelor of Geomatics/Bachelor of Science (Computer Science)
University of Melbourne
(vi)
Bachelor of Geomatics/Bachelor of Science (Environmental Science)
University of Melbourne
(vii)
Bachelor of Applied Science (Land Surveying)
Royal Melbourne Institute of Technology (before January 2024)
Bachelor of Applied Science (Land Surveying)
Western Australia Institute of Technology (before January 2024)
(ix)
Bachelor of Surveying
Curtin University of Technology
(x)
Bachelor of Surveying
University of South Australia (before January 2024)
(xi)
Bachelor of Geoinformatics and Surveying
University of South Australia (before January 2024)
(xii)
Bachelor of Applied Science in Surveying
South Australia Institute of Technology (before January 2024)
Bachelor of Surveying
University of Tasmania (before November 2016)
Bachelor of Geomatics
University of Tasmania (before November 2021)
(xv)
Bachelor of Engineering (Honours) Surveying
University of Newcastle (before October 2020)
P.U. (A) 309 69
(c)
Canada
(i)
B. Sc. in Engineering (Surveying Engineering)
University of New Brunswick (before January 2024)
(ii)
B. Sc. in Engineering (Geomatics Engineering)
University of New Brunswick (before January 2024)
(d)
New Zealand
(i)
Bachelor of Surveying
University of Otago (before October 1990 and after
December 2002 until December 2023)
(e)
United Kingdom
(i)
B. Sc. Surveying Science (Honours)
University of Newcastle-upon-Tyne (before January 2014)
(ii)
B. Sc. Surveying and Mapping Science (Honours)
University of Newcastle-upon-Tyne (before January 2019)
(iii)
Bachelor of Engineering (Hons) in Geospatial Surveying and Mapping
University of Newcastle-upon-Tyne (before January 2024)
(iv)
B. Sc. in Land Surveying Sciences
North East London Polytechnic
(v)
B. Sc. Surveying and Mapping Sciences
University of East London
P.U. (A) 309 70
(vi)
B. Sc. in Topographic Science (Senior Honours)
University of Glasgow (before January 2024)
(vii)
Associate of the Royal Institute of Chartered Surveyors
(before January 1984)
(f)
Hong Kong
(i)
B. Sc (Hons) In Land Surveying and Geoinformatics
Hong Kong Polytechnic University (after April 2019)
2.
Criteria for recognition
The qualifications were recognized based on the following criteria:
(a)
duration of study not less than three academic years and a total of at least 120 credit hours; and
(b)
the land surveying or geomatics surveying qualification contains a minimum of 12 subjects, the contents of which relate to the following:
(i)
plane and engineering survey;
(ii)
geodetic survey;
(iii)
cadastral survey;
(iv)
survey adjustments;
(v)
coordinate system and map projection;
(vi)
airborne survey;
(vii)
hydrographic survey;
mapping and cartography; and
P.U. (A) 309 71
”.
(ix)
spatial information sciences.
Substitution of Eighth Schedule 36.
The principal Regulations are amended by substituting for the Eighth Schedule the following schedule:
“EIGHTH SCHEDULE
[Subregulations 16(2) and 16(4)]
STATEMENT OF TRAINING
I declare that this is the correct statement of my training as set out below:
Training
Survey and
Mapping
Dept.
File Ref.
(if applicable)
No. of
Lots/
area
Period
Engaged
(in weeks)
LLS
File
Ref.
Job
Description
1. Field
Title surveys
Geomatic Survey
Other surveys
TOTAL PERIOD
2. Office
Title survey processing
computation and plotting
editing and
P.U. (A) 309 72
”.
checking
examination of land and survey records
Engineering surveys processing
Topographical surveys processing
Management and supervision of surveys
Others
TOTAL PERIOD
………………………………….
Articled person
Date : …………………..
I, ……………………………………………….., of ………………………………………….……………………………..,
(licensed land surveyor) (current address)
confirm that …………………………………………….…….., has received training as stated above in
(articled person)
the profession of land surveying under my immediate personal direction and field supervision for the period from ……………………… to …………………….
………………………………………………………
Licensed land surveyor
P.U. (A) 309 73
”.
Deletion of Ninth Schedule 37.
The principal Regulations are amended by deleting the Ninth Schedule.
Substitution of Tenth Schedule 38.
The principal Regulations is amended by substituting for the Tenth Schedule the following schedule:
“TENTH SCHEDULE
[Subregulations 22(1)]
APPLICATION FOR EXAMINATIONS
To: Secretary,
Land Surveyors Board
I, ………………………………………… [NRIC number ….……………………………] apply to sit for:
(i)
Part I of the examination with payment of RM 400.00
per task-RM__________
(ii)
Part II of the examination with payment of RM200.00
per paper - RM__________
(iii)
Part III of the examination with payment of RM400.00
per appearance - RM__________
I agree to abide by the rules of the examination.
………………………………………..
Signature of applicant
Date: …………………………
P.U. (A) 309 74
”.
Substitution of Eleventh Schedule 39.
The principal Regulations is amended by substituting for the Eleventh Schedule the following schedule:
“ELEVENTH SCHEDULE
[Paragraph 22(2)]
CERTIFICATE OF SERVICE UNDER ARTICLES
I, …………………………………………………………..……………… hereby certify as follows:
(licensed land surveyor)
…………………………………………………………………………….. has served under Articles in
(articled person)
the practice of land surveying for a period of ……………… years and ………….…… months from ……………… to …………………
During the said period the articled person has served in the field and office for a period of………………….. years and ………………… months, of which ….…………..… years and …………………… months in title survey and ………………years and …………………. months in geomatics survey.
The articled person is able to effect title survey and geomatics survey independently.
Dated this …………… day of ………………………………., ……….
…..……………………………………………..
Licensed land surveyor
P.U. (A) 309 75
New Fifteenth Schedule 40.
The principal Regulations are amended by inserting after the Fourteenth Schedule the following schedule:
“FIFTEENTH SCHEDULE
[Subregulations 28A]
THE AREA OF PRACTICE FOR GEOMATICS SURVEY
1.
AIRBORNE SURVEY AND MAPPING
Airborne Survey and Mapping means techniques of photographing and imaging of the Earth’s surface with opticals, Light Detection and Ranging
(LiDAR), Radio Detection and Ranging (RADAR) and electromagnetic systems mounted on unmanned aerial vehicle (UAV) or aircraft to produce plan or map.
2.
GEODETIC SURVEY
Geodetic survey means the determination of precise three-dimensional positions on or above the earth surface and the determination of elevation based on the mean sea level datum, taking into account the geometry of the earth and its gravity field. It is used to establish precise and accurate survey control networks, coordinated reference marks, elevation benchmarks using precise terrestrial surveys, satellites, or astronomical observation.
P.U. (A) 309 76 3.
HYDROGRAPHIC SURVEY AND MAPPING
3.1
Hydrographic Survey and Mapping means the survey and mapping of the inland waters to produce inland waters bathymetry plan for various applications as follows:
(i)
the management of coastal zones;
(ii)
the hydrographic survey of deltaic regions and river mouths up to the low water line;
(iii)
the development of coastal engineering, property, infrastructure projects and activities;
(iv)
the management and development of jetties, ports and associated maritime facilities; and
(v)
the management and development along inland waterways and inland water body.
3.2
For this particular hydrographic survey and mapping, inland waters mean any reservoir, pond, lake, river, stream, canal, drain, spring or well, or any part of the sea above the low water line along the coast, or any other body of natural or artificial surface or subsurface water. This hydrographic survey and mapping do not include sand mining and coastal erosion activities.
4.
SURVEY AND MAPPING FOR ENGINEERING WORKS
4.1
Survey and Mapping for Engineering Works means the process of determining the relative locations of points, terrain, existing natural and man-made features on the earth's surface by measuring horizontal distances, differences in elevation and directions and
P.U. (A) 309 77
tied to the horizontal and vertical control points to produce plan according to classification of engineering survey and specifications for engineering purposes.
4.2
Classification of Survey and mapping for Engineering Works are as follows:
(i)
Site Survey;
(ii)
Cross-Sectioning with Sounding for Bridge Sites;
(iii)
Road and Railway Survey;
(iv)
Pipeline Survey;
(v)
Engineering Survey for Drainage and Irrigation;
(vi)
Waterways Survey; and
(vii)
Engineering Survey for Transmission Line.
5.
SURVEY AND MAPPING FOR BUILDING INFORMATION MODELING
(BIM)
Survey and Mapping for BIM means to capture and provide geospatial data for an intelligent 3D model-based process that gives Architecture,
Engineering, and Construction (AEC) professionals the insight and tools to more efficiently plan, design, construct, and manage buildings and infrastructure.
P.U. (A) 309 78
”.
6.
SURVEY AND MAPPING FOR GEOGRAPHIC INFORMATION SYSTEM
(GIS)
Survey and Mapping for GIS comprises of work related to data capture, entry, conversion, integration and management of data and information pertaining to the locations, shapes, boundaries, and description of geographic features derived from geomatics survey or other data sources into appropriate data format, structure, and database.
7.
TERRESTRIAL SURVEY AND MAPPING
Terrestrial Survey and Mapping means a land-based static and mobile mapping technology based on the integration of various positioning, navigation and imaging data collection sensors constituting of static or mobile mapping system.
8.
TOPOGRAPHIC SURVEY AND MAPPING
Topographic Survey and Mapping means determination of the relative locations of points, terrain, existing natural and man-made features on the earth's surface by measuring horizontal distances, differences in elevation and directions and tied to the horizontal and vertical control points to produce large scale topographic plan.
9.
UNDERGROUND SURVEY AND MAPPING
Underground Survey and Mapping means the process of preparing and producing subsurface plans by detecting, scanning, locating, identifying and labelling underground objects, features and utilities.
P.U. (A) 309 79
Saving 41.
(1)
Any articled person who has passed Part I of the examination under the principal Regulations immediately before the coming into operation of these Regulations shall be accepted as a pass in Part II of the examination under these Regulations.
(2)
Any articled person who has passed any practical task in Part II of the examination under the principal Regulations before the coming into operation of these
Regulations may be accepted by the Board as a pass for Part I for an equivalent practical task under these Regulations.
(3)
Any articled person who has not completed his practical task in Part II of the examinations under Part V of the principal Regulations immediately before the coming into operation of these Regulations, may be dealt with under the principal
Regulations within the period of three years from the coming into operation of these
Regulations as if the principal Regulations have not been amended by these Regulations.
Made 16 October 2024
[NRES.BTUG.U.(R) 100-1/3/; PN(PU2)165/VIII]
DATO’ Sr HAZRI BIN HASSAN
Chairman
Land Surveyors Board
Approved 18 October 2024
NIK NAZMI BIN NIK AHMAD
Minister of Natural Resources and
Environmental Sustainability