Skip to content
P.U. (A)In force

Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Enacted
2026
Sections
9

Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 is Malaysia P.U. (A), cited as P.U. (A) 33 2026, currently marked in force and first recorded in 2026.

Front matterCover and publication detailsOpen

P.U. (A) 33

WARTA KERAJAAN PERSEKUTUAN

FEDERAL GOVERNMENT

GAZETTE

PERINTAH HAD LAJU

(LEBUH RAYA LEMBAH KLANG TIMUR)

(PINDAAN) 2026

SPEED LIMIT

(EAST KLANG VALLEY EXPRESSWAY)

(AMENDMENT) ORDER 2026

DISIARKAN OLEH/

JABATAN PEGUAM NEGARA/

ATTORNEY GENERAL’S CHAMBERS

P.U. (A) 33 2

AKTA PENGANGKUTAN JALAN 1987

PERINTAH HAD LAJU (LEBUH RAYA LEMBAH KLANG TIMUR) (PINDAAN) 2026

Opening note

Preamble

  1. PADA menjalankan kuasa yang diberikan oleh subseksyen 69(2) Akta Pengangkutan Jalan 1987 [Akta 333], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

(1)

Perintah ini bolehlah dinamakan Perintah Had Laju (Lebuh Raya

Lembah Klang Timur) (Pindaan) 2026.

(2)

Perintah ini mula berkuat kuasa pada 26 Januari 2026.

Pindaan Jadual Pertama

Perintah Had Laju (Lebuh Raya Lembah Klang Timur) 2025 [P.U. (A) 318/2025], yang disebut “Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Pertama—

(a)

dalam subbutiran (f)(vii), dengan memotong perkataan “dan” di hujung subbutiran itu;

(b)

dalam subbutiran (g)(viii), dengan menggantikan noktah di hujung subbutiran itu dengan koma bernoktah; dan

(c)

dengan memasukkan selepas subbutiran (g)(viii) butiran yang berikut:

(2)

Had laju

(km/j)

“(h) laluan utama di kilometer 0.00 Jalan Spur di koordinat U -53582.172, T 28526.241 Geosentrik

Datum Malaysia (GDM2000) di Persimpangan

Bertingkat Kg. Pasir dan berakhir di kilometer 3.04

Jalan Spur di koordinat U -52240.461, T 30764.039 60

P.U. (A) 33 3

(2)

Had laju

(km/j)

Geosentrik

Datum

Malaysia

(GDM2000)

di

Jalan Ukay Perdana;

413

Geosentrik Datum Malaysia (GDM2000) dan berakhir di koordinat

-53226.479,

T 29966.472 Geosentrik Datum Malaysia

(GDM2000);

505

Geosentrik Datum Malaysia (GDM2000) dan berakhir di koordinat

-53318.483,

T 29162.632 Geosentrik Datum Malaysia

486

Geosentrik Datum Malaysia (GDM2000) dan berakhir di koordinat

-52662.664,

T 30266.364 Geosentrik Datum Malaysia

40

40

40

343

Geosentrik Datum Malaysia (GDM2000) dan berakhir di koordinat

-53573.710,

25

P.U. (A) 33 4

(2)

Had laju

(km/j)

T 28470.608 Geosentrik Datum Malaysia

293

Geosentrik Datum Malaysia (GDM2000) dan berakhir di koordinat

-53566.079,

T 28348.019 Geosentrik Datum Malaysia

(GDM2000).

25”.

Pindaan Jadual Kedua

(a)

dengan menggantikan PETA 1: LEBUH RAYA LEMBAH KLANG TIMUR dengan peta yang berikut:

P.U. (A) 33 5

”; dan

“PETA 1: LEBUH RAYA LEMBAH KLANG TIMUR

P.U. (A) 33 6

(b)

dengan memasukkan selepas PETA 5: PERSIMPANGAN BERTINGKAT

AMPANG peta yang berikut:

“PETA 6: JALAN UKAY PERDANA

P.U. (A) 33 7

”.

PETA 7: PERSIMPANGAN BERTINGKAT KG. PASIR

Dibuat 21 Januari 2026

[KKR.110-1/6/23; PN(PU2)460/JLD.141]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

P.U. (A) 33 8

ROAD TRANSPORT ACT 1987

SPEED LIMIT (EAST KLANG VALLEY EXPRESSWAY) (AMENDMENT) ORDER 2026

Opening note

Preamble

  1. IN exercise of the powers conferred by subsection 69(2) of the Road Transport Act 1987 [Act 333], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Speed Limit (East Klang Valley

Expressway) (Amendment) Order 2026.

(2)

This Order comes into operation on 26 January 2026.

Amendment of First Schedule 2.

The

Speed

Limit

(East

Klang

Valley

Expressway)

Order 2025

[P.U. (A) 318/2025], which is referred to as the “principal Order” in this Order, is amended in the First Schedule—

(a)

in subitem (f)(vii), by deleting the word “and” at the end of the subitem;

(b)

in subitem (g)(viii), by substituting for the full stop at the end of the subitem a semicolon; and

(c)

by inserting after subitem (g)(viii) the following items:

(2)

Speed limit

(km/h)

“(h) the main route at kilometre 0.00 Spur Road at coordinates

N

-53582.172,

E

241

Geocentric Datum of Malaysia (GDM2000) at

Kg. Pasir Interchange and ending at kilometre 3.04

Spur

Road at coordinates

N

-52240.461,

60

P.U. (A) 33 9

(2)

Speed limit

(km/h)

E 30764.039 Geocentric Datum of Malaysia

(GDM2000) at the Ukay Perdana Road;

(i)

coordinates N -53591.045, E 28785.413

Geocentric Datum of Malaysia (GDM2000)

and ending at coordinates N -53226.479,

E 29966.472 Geocentric Datum of Malaysia

(GDM2000);

(ii)

coordinates N -53285.900, E 29940.505

Geocentric Datum of Malaysia (GDM2000)

and ending at coordinates N -53318.483,

E 29162.632 Geocentric Datum of Malaysia

(iii)

coordinates N -52358.012, E 30392.486

Geocentric Datum of Malaysia (GDM2000)

and ending at coordinates N -52662.664,

E 30266.364 Geocentric Datum of Malaysia

40

40

40

(i)

coordinates N -53594.625, E 28649.343

Geocentric Datum of Malaysia (GDM2000)

and ending at coordinates N -53573.710,

25

P.U. (A) 33 10

(2)

Speed limit

(km/h)

E 28470.608 Geocentric Datum of Malaysia

(ii)

coordinates N -53817.753, E 28398.293

Geocentric Datum of Malaysia (GDM2000)

and ending at coordinates N -53566.079,

E 28348.019 Geocentric Datum of Malaysia

(GDM2000).

25”.

Amendment of Second Schedule 3.

The principal Order is amended in the Second Schedule—

(a)

by substituting for MAP 1: EAST KLANG VALLEY EXPRESSWAY the following map:

P.U. (A) 33 11

”; and

“MAP 1: EAST KLANG VALLEY EXPRESSWAY

P.U. (A) 33 12

(b)

by inserting after MAP 5: AMPANG INTERCHANGE the following maps:

“MAP 6: UKAY PERDANA ROAD

P.U. (A) 33 13

”.

MAP 7: KG. PASIR INTERCHANGE

Made 21 January 2026

[KKR.110-1/6/23; PN(PU2)460/JLD.141]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

Common questions

What is Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026?
Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 is Malaysia P.U. (A), cited as P.U. (A) 33 2026, currently marked in force and first recorded in 2026.
Is Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 still in force?
Yes — Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 is currently in force.
When did Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 take effect?
Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 was first recorded in 2026.
How many sections does Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 have?
Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 contains 9 sections.
Where can I read the official version of Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026?
The official text of Perintah Had Laju (Lebuh Raya Lembah Klang Timur) (Pindaan) 2026 is published at lom.agc.gov.my.

Something wrong on this page?

If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.