/akn/my/act/pua/2019/313

PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2019
Sections
5

Quick answer

About this p.u. (a)

PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 is Malaysia P.U. (A), cited as P.U. (A) 313 2019, currently marked in force and first recorded in 2019.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh subseksyen 69(2) Akta Pengangkutan Jalan 1987 [Akta 333], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Open as pageSuggest a correction
(1)

Pemanduan suatu kenderaan motor dengan kelajuan yang melebihi enam puluh kilometer sejam (60km/j) di atas jalan yang dinyatakan dalam

Jadual

Suggest a correction

Jadual Pertama dilarang.

(2)

Jalan dengan had laju yang dinyatakan dalam subperenggan (1) ditunjukkan dalam peta dalam Jadual Kedua.

3

Jadual

Suggest a correction

JADUAL PERTAMA

[Subperenggan 2(1)]

Bahagian jalan yang dikenali sebagai Persimpangan Bertingkat Bandar

Pulai Jaya yang merupakan sebahagian daripada Jambatan dan Lebuh Raya

Laluan Kedua Malaysia-Singapura, Lebuh Raya Laluan Pontian dan Lebuh

Raya Perling yang bermula dari—

(a)

kilometer 26.075 di koordinat U 173547.017, T 622725.578 Grid

Bentuk Benar Serong di Tepi (RSO) Geosentrik (GDM 2000) dan berakhir di Had Sempadan Penyengaraan (HSP) di koordinat

U 174405.145, T 622962.374 Grid RSO Geosentrik (GDM 2000);

(b)

Had Sempadan Penyenggaraan (HSP) di koordinat U 174439.606,

T 622967.824 Grid RSO Geosentrik (GDM 2000) dan berakhir di kilometer 28.275 di koordinat U 175543.479, T 623662.860 Grid RSO

Geosentrik (GDM 2000);

(c)

kilometer 28.000 di koordinat U 175308.337, T 623526.531 Grid RSO

Geosentrik (GDM 2000) dan berakhir di

Had Sempadan

Penyenggaraan (HSP) di koordinat U 174436.662, T 623104.846

Grid RSO Geosentrik (GDM 2000); dan

(d)

Had Sempadan Penyenggaraan (HSP) di koordinat U 174403.699,

T 623104.418 Grid RSO Geosentrik (GDM 2000) dan berakhir di kilometer 26.025 di koordinat U 173492.548, T 622732.304 Grid

RSO Geosentrik (GDM 2000).

4

Jadual

Suggest a correction

JADUAL KEDUA

[Subperenggan 2(2)]

PETA PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA

PETUNJUK :

JALAN

YANG

DIWARTAKAN

SEBAGAI

JALAN PERSEKUTUAN

JAMBATAN DAN LEBUH RAYA LALUAN

KEDUA MALAYSIA-SINGAPURA

HAD SEMPADAN PENYENGGARAAN

LEBUH RAYA UTARA-SELATAN

JALAN SUSUR

CATATAN :

TIDAK MENGIKUT SKALA

KOORDINAT RSO GEOSENTRIK (GDM2000)

SENAI SELATAN

PLAZA TOL

SENAI UTARA

PULAI

LEBUH RAYA

LALUAN PONTIAN

BANDAR PULAI

JAYA

SENAI UTARA

U. 174439.606

T. 622967.824

U. 174405.145

T. 622962.374

U. 174436.662

T. 623104.846

U. 174403.699

T. 623104.418

KM 28.275

U. 175543.479

T. 623662.860

KM 26.075

U. 173547.017

T. 622725.578

KM 26.025

U. 173492.548

T. 622732.304

KM 28.000

U. 175308.337

T. 623526.531

5

Dibuat 8 November 2019

[KKR.PUU.110-1/7/1 Jld.19; PN(PU2)460/CV]

BARU BIAN

Menteri Kerja Raya

6

ROAD TRANSPORT ACT 1987

SPEED LIMIT (BANDAR PULAI JAYA INTERCHANGE) ORDER 2019

IN exercise of the powers conferred by subsection 69(2)

of the

Road Transport Act 1987 [Act 333], the Minister makes the following order:

Citation and commencement

1. (1) This order may be cited as the Speed Limit (Bandar Pulai Jaya Interchange)

Order 2019.

(2)

This Order comes into operation on 11 November 2019.

Prohibition 2.

(1)

The driving of a motor vehicle at a speed exceeding sixty kilometres per hour (60km/h) on the road specified in the First Schedule is prohibited.

(2)

The road with speed limit as specified in subparagraph (1) is shown on the map in the Second Schedule.

7

FIRST SCHEDULE

[Subparagraph 2(1)]

The part of the road known as the Bandar Pulai Jaya Interchange which is part of the Malaysia-Singapore Second Crossing Bridge and Expressway, Pontian Link

Expressway and Perling Expressway commencing from—

(a)

kilometre 26.075 at coordinates N 173547.017, E 622725.578 of the

Rectified Skew Orthomorphic (RSO) Geocentric (GDM 2000) Grid and ending at the Limit of Maintenance Responsibility (LMR) at coordinates

N 174405.145, E 622962.374 of the RSO Geocentric (GDM 2000) Grid;

(b)

the Limit of Maintenance Responsibility (LMR) at coordinates

N 174439.606, E 622967.824 of the RSO Geocentric (GDM 2000) Grid and ending at kilometre 28.275 at coordinates N 175543.479,

E 623662.860 of the RSO Geocentric (GDM 2000) Grid;

(c)

kilometre 28.000 at coordinates N 175308.337, E 623526.531 of the

RSO Geocentric (GDM 2000) Grid and ending at the Limit of

Maintenance Responsibility (LMR) at coordinates N 174436.662,

E 623104.846 of the RSO Geocentric (GDM 2000) Grid; and

(d)

the Limit of Maintenance Responsibility (LMR) at coordinates

N 174403.699, E 623104.418 of the RSO Geocentric (GDM 2000) Grid and ending at kilometre 26.025 at coordinates N 173492.548,

E 622732.304 of the RSO Geocentric (GDM 2000) Grid.

8

SECOND SCHEDULE

[Subparagraph 2(2)]

MAP OF BANDAR PULAI JAYA INTERCHANGE

N. 174439.606

E. 622967.824

N. 174405.145

E. 622962.374

N. 174436.662

E. 623104.846

N. 174403.699

E. 623104.418

KM 28.275

N. 175543.479

E. 623662.860

KM 26.075

N. 173547.017

E. 622725.578

KM 26.025

N. 173492.548

E. 622732.304

KM 28.000

N. 175308.337

E. 623526.531

SENAI NORTH

SENAI SOUTH

SENAI NORTH

TOLL PLAZA

PULAI

PONTIAN LINK

EXPRESSWAY

BANDAR

PULAI JAYA

LEGEND :

ROAD TO BE GAZETTED AS FEDERAL ROAD

MALAYSIA-SINGAPORE SECOND CROSSING

BRIDGE AND EXPRESSWAY

LIMIT OF MAINTENANCE RESPONSIBILITY

NORTH-SOUTH EXPRESSWAY

SLIP ROAD

NOTE :

NOT TO SCALE

RSO GEOCENTRIC (GDM2000) COORDINATE

N

9

Made 8 November 2019

[KKR.PUU.110-1/7/1 Jld.19; PN(PU2)460/CV]

BARU BIAN

Minister of Works

Common questions

What is PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019?
PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 is Malaysia P.U. (A), cited as P.U. (A) 313 2019, currently marked in force and first recorded in 2019.
Is PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 still in force?
Yes — PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 is currently in force.
When did PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 take effect?
PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 was first recorded in 2019.
How many schedules does PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 have?
PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 contains 3 schedules.
Where can I read the official version of PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019?
The official text of PERINTAH HAD LAJU (PERSIMPANGAN BERTINGKAT BANDAR PULAI JAYA) 2019 is published at lom.agc.gov.my.