/akn/my/act/pua/2026/32

PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2026
Sections
5

Quick answer

About this p.u. (a)

PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 is Malaysia P.U. (A), cited as P.U. (A) 32 2026, currently marked in force and first recorded in 2026.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 3 Akta Jalan Persekutuan 1959 [Akta 376], Menteri, setelah berunding dengan Kerajaan Negeri Selangor, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 1

Open as pageSuggest a correction

(1)

Perintah ini bolehlah dinamakan

Perintah Jalan Persekutuan

(Lebuh Raya Lembah Klang Timur) 2026.

Suggest a correction

(2)

Perintah ini mula berkuat kuasa pada 26 Januari 2026.

Perisytiharan jalan sebagai jalan Persekutuan

Suggest a correction

Seksyen 2

Open as pageSuggest a correction

(1)

Bahagian jalan yang dikenali sebagai Lebuh Raya Lembah Klang Timur yang bermula dari—

(a)

kilometer 0.00 di koordinat U -73360.788, T 34660.310 Geosentrik

Datum Malaysia (GDM2000) dan berakhir di kilometer 16.78

di koordinat U -58391.875, T 33186.605 Geosentrik Datum

Malaysia

(GDM2000), termasuk

Persimpangan

Bertingkat

Sungai Long, Plaza Tol Sungai Long, Persimpangan Bertingkat

Bandar Mahkota Cheras, Plaza Tol Bandar Mahkota Cheras,

Persimpangan Bertingkat Hulu Langat, Plaza Tol Hulu Langat,

Persimpangan Bertingkat Ampang, Plaza Tol Ampang dan jalan sambungannya, iaitu suatu jarak sepanjang 16.78 kilometer; dan

Suggest a correction

(b)

kilometer 0.00 Jalan Spur di koordinat U -53582.172, T 28526.241

Geosentrik Datum Malaysia (GDM2000) dan berakhir di kilometer 3.04 Jalan Spur di koordinat U -52240.461, T 30764.039 Geosentrik

Datum Malaysia (GDM2000) termasuk Jalan Ukay Perdana,

Persimpangan Bertingkat Kg. Pasir dan jalan sambungannya, iaitu suatu jarak sepanjang 3.04 kilometer,

P.U. (A) 32 3

diisytiharkan sebagai jalan Persekutuan.

Suggest a correction
Suggest a correction

(2)

Jalan yang diisytiharkan sebagai jalan

Persekutuan di bawah subperenggan (1) ditunjukkan dalam peta dalam Jadual.

Pembatalan

Suggest a correction

Seksyen 3

Perintah Jalan Persekutuan (Lebuh Raya Lembah Klang Timur) 2025

Open as pageSuggest a correction

[P.U. (A) 317/2025] dibatalkan.

P.U. (A) 32 4

Jadual

Suggest a correction

JADUAL

[Subperenggan 2(2)]

PETA LEBUH RAYA LEMBAH KLANG TIMUR

P.U. (A) 32 5

Dibuat 21 Januari 2026

[KKR.110-1/6/23; PN(PU2)391/JLD.55]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]

P.U. (A) 32 6

FEDERAL ROADS ACT 1959

FEDERAL ROADS (EAST KLANG VALLEY EXPRESSWAY) ORDER 2026

IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959

[Act 376], the Minister, after consultation with the State Government of Selangor, makes the following order:

Citation and commencement 1.

(1)

This order may be cited as the Federal Roads (East Klang Valley

Expressway) Order 2026.

(2)

This Order comes into operation on 26 January 2026.

Declaration of road to be Federal road 2.

(1)

The part of the road known as the East Klang Valley Expressway commencing from—

(a)

kilometre 0.00 at coordinates N -73360.788, E 34660.310

of the Geocentric Datum of Malaysia (GDM2000) and ending at kilometre 16.78 at coordinates N -58391.875, E 33186.605

of the Geocentric Datum of Malaysia (GDM2000), including the

Sungai

Long

Interchange,

Sungai

Long

Toll

Plaza,

Bandar Mahkota Cheras Interchange, Bandar Mahkota Cheras

Toll Plaza, Hulu Langat Interchange, Hulu Langat Toll Plaza,

Ampang Interchange, Ampang Toll Plaza and its link roads, being a distance of 16.78 kilometre; and

(b)

kilometre 0.00 Spur Road at coordinates N -53582.172,

E 28526.241 of the Geocentric Datum of Malaysia (GDM2000)

and ending at kilometre 3.04 Spur Road at coordinates

N -52240.461, E 30764.039 of the Geocentric Datum of Malaysia

(GDM2000) including the Ukay Perdana Road, Kg. Pasir Interchange and its link road, being a distance of 3.04 kilometre,

P.U. (A) 32 7

is declared to be a Federal road.

(2)

The road declared to be a Federal road under subparagraph (1) is shown on the map in the Schedule.

Revocation 3.

The

Federal

Roads

(East

Klang

Valley

Expressway)

Order 2025

[P.U. (A) 317/2025] is revoked.

P.U. (A) 32 8

Jadual

Suggest a correction

[Subparagraph 2(2)]

MAP OF EAST KLANG VALLEY EXPRESSWAY

P.U. (A) 32 9

Made 21 January 2026

[KKR.110-1/6/23; PN(PU2)391/JLD.55]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]

Common questions

What is PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026?
PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 is Malaysia P.U. (A), cited as P.U. (A) 32 2026, currently marked in force and first recorded in 2026.
Is PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 still in force?
Yes — PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 is currently in force.
When did PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 take effect?
PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 was first recorded in 2026.
How many sections does PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 have?
PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 contains 3 sections.
Where can I read the official version of PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026?
The official text of PERINTAH JALAN PERSEKUTUAN (LEBUH RAYA LEMBAH KLANG TIMUR) 2026 is published at lom.agc.gov.my.