/akn/my/act/pua/2019/220

PERINTAH SES KAYU (PINDAAN) 2019

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2019
Sections
4

Quick answer

About this p.u. (a)

PERINTAH SES KAYU (PINDAAN) 2019 is Malaysia P.U. (A), cited as P.U. (A) 220 2019, currently marked in force and first recorded in 2019.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 20 Akta Lembaga Perindustrian Kayu Malaysia (Pemerbadanan) 1973 [Akta 105], Menteri selepas berunding dengan Menteri Kewangan dan Lembaga, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Jadual kepada Perintah Ses Kayu 2000 [P.U. (A) 56/2000] dipinda ̶

Open as pageSuggest a correction

(a)

dengan memasukkan selepas butiran (h) dan butir-butir yang berhubungan dengannya butiran dan butir-butir yang berikut:

Suggest a correction

(2)

Kadar

“hh

Venir daripada batang kelapa sawit bagi semua ketebalan

RM5.00 semeter padu atau sebahagian daripadanya”;

(b)

dalam butiran (i), dengan menggantikan perkataan “Venir (tebal 2 mm dan kurang)” yang terdapat di bawah ruang (1) dengan perkataan “Venir selain batang kelapa sawit (tebal 2 mm dan kurang)”; dan

Suggest a correction

(c)

dalam butiran (j), dengan menggantikan perkataan “Venir (melebihi tebal 2 mm)” yang terdapat di bawah ruang (1) dengan perkataan “Venir selain batang kelapa sawit (melebihi tebal 2 mm)”.

P.U. (A) 220 3

Dibuat 24 Julai 2019

[MPI (S).458(03)16/1; PN(PU2)129/X]

TERESA KOK SUH SIM

Menteri Industri Utama

P.U. (A) 220 4

MALAYSIAN TIMBER INDUSTRY BOARD (INCORPORATION) ACT 1973

TIMBER CESS (AMENDMENT) ORDER 2019

Suggest a correction
Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 20 of the Malaysian Timber Industry Board (Incorporation) Act 1973 [Act 105], the Minister after consulting the Minister of Finance and the Board, makes the following order: Citation and commencement

Seksyen 1

Suggest a correction

(1)

This order may be cited as the Timber Cess (Amendment) Order 2019.

Suggest a correction

(2)

This Order shall come into operation in Peninsular Malaysia on 6 August 2019.

Amendment of Schedule

Suggest a correction

Seksyen 2

Suggest a correction

The Schedule to the Timber Cess Order 2000 [P.U. (A) 56/2000] is amended—

(a)

by inserting after the item “(h)” and the particulars relating to it the following item and particulars:

Suggest a correction

(2)

Rates

“(hh) Veneer of oil palm trunk for all thickness

RM5.00

per cubic metre or part thereof ”;

(b)

in item (i), by sustituting for the words “Veneer (2 mm thick and less)”

appearing under column (1) the words “Veneer other than of oil palm trunk

(2 mm thick and less)”; and

Suggest a correction

(c)

in item (j), by substituting for the words “Veneer (more than 2 mm thick)”

appearing under column (1) the words “Veneer other than of oil palm trunk

(exceeding 2 mm thick)”.

P.U. (A) 220 5

Made 24 July 2019

[MPI (S).458(03)16/1; PN(PU2)129/X]

TERESA KOK SUH SIM

Minister of Primary Industries

Suggest a correction
Suggest a correction

Common questions

What is PERINTAH SES KAYU (PINDAAN) 2019?
PERINTAH SES KAYU (PINDAAN) 2019 is Malaysia P.U. (A), cited as P.U. (A) 220 2019, currently marked in force and first recorded in 2019.
Is PERINTAH SES KAYU (PINDAAN) 2019 still in force?
Yes — PERINTAH SES KAYU (PINDAAN) 2019 is currently in force.
When did PERINTAH SES KAYU (PINDAAN) 2019 take effect?
PERINTAH SES KAYU (PINDAAN) 2019 was first recorded in 2019.
How many sections does PERINTAH SES KAYU (PINDAAN) 2019 have?
PERINTAH SES KAYU (PINDAAN) 2019 contains 4 sections.
Where can I read the official version of PERINTAH SES KAYU (PINDAAN) 2019?
The official text of PERINTAH SES KAYU (PINDAAN) 2019 is published at lom.agc.gov.my.