PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2014
Sections
18

Quick answer

About this p.u. (a)

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 is Malaysia P.U. (A), cited as P.U. (A) 335 2014, currently marked in force and first recorded in 2014.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

(1)

Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu

(Pindaan Jadual) (No. 2) 2014.

Suggest a correction

(2)

Perintah ini mula berkuat kuasa pada 1 Januari 2015.

Pindaan Jadual

Suggest a correction

Seksyen 2

Open as pageSuggest a correction

Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda dengan menggantikan butiran “Fotovolta suria” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

“Fotovolta suria

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:

Kadar tarif galakan asas

Suggest a correction

(ii)

melebihi 4 kilowatt, dan sehingga dan termasuk 12 kilowatt (individu)

Suggest a correction

(iii)

sehingga dan termasuk 4 kilowatt (bukan individu)

Suggest a correction

(iv)

melebihi 4

kilowatt, dan sehingga dan termasuk 24

kilowatt

(bukan individu)

Suggest a correction

(v)

melebihi 24

kilowatt, dan sehingga dan termasuk 72

kilowatt

(bukan individu)

Suggest a correction

(vi)

melebihi 72

kilowatt, dan sehingga dan termasuk 1

megawatt

(bukan individu)

Suggest a correction

(vii)

melebihi 1

megawatt, dan sehingga dan termasuk 10

megawatt

(bukan individu)

Suggest a correction

(viii)

melebihi 10

megawatt, dan sehingga dan termasuk 30

megawatt

(bukan individu)

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada

Suggest a correction

(a)

di atas:

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

Suggest a correction

(i)

penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan

+ 0.1722

21 tahun 20%

Suggest a correction

(ii)

penggunaan sebagai bahan bangunan

+ 0.1656

21 tahun 20%

P.U. (A) 335 4

Suggest a correction

(iii)

penggunaan modul fotovolta suria yang dibuat atau dipasang secara tempatan

+ 0.05 21 tahun 0%

Suggest a correction

(iv)

penggunaan alat penyongsang suria yang dibuat atau dipasang secara tempatan

+ 0.05 21 tahun 0%”.

Dibuat 4 Disember 2014

[KeTTHA(BP)9/14 Klt. 5; PN(PU2)693/V]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Menteri Tenaga, Teknologi Hijau dan Air

P.U. (A) 335 5

RENEWABLE ENERGY ACT 2011

RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) (NO. 2) ORDER 2014

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the

Renewable

Energy

(Amendment of Schedule) (No. 2) Order 2014.

Suggest a correction

(2)

This Order comes into operation on 1 January 2015.

Amendment of Schedule 2.

The Schedule to the Renewable Energy Act 2011 is amended by substituting for the item “Solar photovoltaic” and other items relating to it the following items:

First

Column

Second Column

Third

Column

Fourth Column

Fifth

Column

Renewable resource

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

“Solar photovoltaic

Suggest a correction

(a)

Renewable energy installation having an installed capacity of:

Basic feed-in tariff

Suggest a correction

(ii)

above 4

kilowatts, and up to and including 12 kilowatts

(individual)

Suggest a correction

(iii)

up to and including 4 kilowatts

(non-individual)

Suggest a correction

(iv)

above 4

kilowatts, and up to and including 24 kilowatts

(non-individual)

Suggest a correction

(v)

above 24

kilowatts, and up to and including 72 kilowatts

(non-individual)

Suggest a correction

(vi)

above 72

kilowatts, and up to and including 1 megawatt

(non-individual)

Suggest a correction

(vii)

above 1 megawatt, and up to and including 10

megawatts

(non-individual)

Suggest a correction

(viii)

above 10 megawatts, and up to and including 30

megawatts

(non-individual)

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a) above:

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

Suggest a correction

(i)

use as installation in building or building structures

+ 0.1722

21 years 20%

Suggest a correction

(iii)

use of locally manufactured or assembled solar photovoltaic modules

+ 0.05 21 years 0%

Suggest a correction

(iv)

use of locally manufactured or assembled solar inverters

+ 0.05 21 years 0%”.

P.U. (A) 335 7

Made 4 December 2014

[KeTTHA(BP)9/14 Klt. 5; PN(PU2)693/V]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Minister of Energy, Green Technology and Water

Suggest a correction

Common questions

What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 is Malaysia P.U. (A), cited as P.U. (A) 335 2014, currently marked in force and first recorded in 2014.
Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 still in force?
Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 is currently in force.
When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 take effect?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 was first recorded in 2014.
How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 have?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 contains 18 sections.
Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014?
The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 is published at lom.agc.gov.my.
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 (No. 335)