Skip to content
P.U. (A)In force

Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Enacted
2019
Sections
5

Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 is Malaysia P.U. (A), cited as P.U. (A) 355 2019, currently marked in force and first recorded in 2019.

Front matterCover and publication detailsOpen

P.U. (A) 355

WARTA KERAJAAN PERSEKUTUAN

FEDERAL GOVERNMENT

GAZETTE

PERINTAH TENAGA BOLEH BAHARU

(PINDAAN JADUAL) (NO. 3) 2019

RENEWABLE ENERGY

(AMENDMENT OF SCHEDULE) (NO. 3) ORDER 2019

DISIARKAN OLEH/

JABATAN PEGUAM NEGARA/

ATTORNEY GENERAL’S CHAMBERS

P.U. (A) 355 2

AKTA TENAGA BOLEH BAHARU 2011

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 3) 2019

Opening note

Preamble

  1. PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda—

(a)

berhubung dengan sumber boleh baharu “Biojisim”, dalam Ruang Keempat, dengan menggantikan perkataan “16 tahun” di mana-mana jua terdapat dengan perkataan “21 tahun”; dan

(b)

berhubung dengan sumber boleh baharu “Hidrokuasa kecil”, dengan menggantikan butiran (a), (b) dan (c) dan butir-butir yang berhubungan dengannya dengan butiran dan butir-butir yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

Kadar tarif galakan asas

P.U. (A) 355 3

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

Hidrokuasa kecil

“(a) Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 30

megawatt dengan turus bersih lebih daripada 10

meter

2300 - 0.2599 21 tahun 0%

(b)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 30

megawatt dengan turus bersih sehingga dan termasuk 10 meter

Seksyen 0

2900 21 tahun 0%”.

Dibuat 17 Disember 2019

[MESTECC.700-1/2/5; PN(PU2)693/VI]

YEO BEE YIN

Menteri Tenaga, Sains, Teknologi, Alam Sekitar dan Perubahan Iklim

P.U. (A) 355 4

RENEWABLE ENERGY ACT 2011

RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) (NO. 3) ORDER 2019

Opening note

Preamble

  1. IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the

Renewable

Energy

(Amendment of Schedule) (No. 3) Order 2019.

(2)

This Order comes into operation on 23 December 2019.

Amendment of Schedule 2.

The Schedule to the Renewable Energy Act 2011 is amended—

(a)

in relation to the renewable resource “Biomass”, in the Fourth Column, by substituting for the words “16 years” wherever appearing the words “21 years”; and

(b)

in relation to the renewable resource “Small hydropower”, by substituting for items (a), (b) and (c) and the particulars relating to them the following items and particulars:

First

Column

Second Column

Third

Column

Fourth Column

Fifth

Column

Renewable resource

Description of qualifying renewable energy installation

Feed in tariff rate (in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

Basic feed-in tariff

Small hydropower

“(a) Renewable energy 0.2300 -0.2599 21 years 0%

P.U. (A) 355 5

First

Column

Second Column

Third

Column

Fourth Column

Fifth

Column

Renewable resource

Description of qualifying renewable energy installation

Feed in tariff rate (in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate installation having an installed capacity of up to and including 30

megawatts with net head of more than 10 meters

(b)

Renewable energy installation having an installed capacity of up to and including 30 megawatts with net head of up to and including 10

meters

Seksyen 0

2900 21 years 0%”.

Made 17 December 2019

[MESTECC.700–1/2/5; PN(PU2)693/VI]

YEO BEE YIN

Minister of Energy, Science, Technology, Environment and Climate Change

Common questions

What is Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019?
Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 is Malaysia P.U. (A), cited as P.U. (A) 355 2019, currently marked in force and first recorded in 2019.
Is Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 still in force?
Yes — Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 is currently in force.
When did Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 take effect?
Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 was first recorded in 2019.
How many sections does Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 have?
Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 contains 5 sections.
Where can I read the official version of Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019?
The official text of Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 3) 2019 is published at lom.agc.gov.my.

Something wrong on this page?

If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.