PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 is Malaysia P.U. (A), cited as P.U. (A) 70 2014, currently marked in force and first recorded in 2014.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

(1)

Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu

(Pindaan Jadual) 2014.

Suggest a correction

(2)

Perintah ini mula berkuat kuasa pada 15 Mac 2014.

Pindaan Jadual

Suggest a correction

Seksyen 2

Open as pageSuggest a correction

Jadual kepada Akta Tenaga Boleh Baharu 2011 [Akta 725] dipinda dengan menggantikan butiran “Fotovolta suria” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

“Fotovolta suria

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:

Kadar tarif galakan asas

Suggest a correction

(ii)

melebihi 4 kilowatt, dan sehingga dan termasuk 12 kilowatt (individu)

Suggest a correction

(iii)

sehingga dan termasuk 4

kilowatt

(bukan individu)

Suggest a correction

(iv)

melebihi 4 kilowatt, dan sehingga dan termasuk 24

kilowatt

(bukan individu)

Suggest a correction

(v)

melebihi 24

kilowatt, dan sehingga dan termasuk 72

kilowatt

(bukan individu)

Suggest a correction

(vi)

melebihi 72

kilowatt, dan sehingga dan termasuk 1 megawatt

(bukan individu)

Suggest a correction

(vii)

melebihi 1

megawatt, dan sehingga dan termasuk 10 megawatt

(bukan individu)

Suggest a correction

(viii)

melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt

(bukan individu)

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada (a) di atas:

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

Suggest a correction

(i)

penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan

+ 0.2153 21 tahun 10%

Suggest a correction

(ii)

penggunaan sebagai bahan bangunan

+ 0.2070 21 tahun 10%

Suggest a correction

(iii)

penggunaan modul fotovolta suria yang dibuat atau dipasang secara tempatan

+ 0.05 21 tahun 0%

Suggest a correction

(iv)

penggunaan alat penyongsang suria yang dibuat atau dipasang secara tempatan

+ 0.05 21 tahun 0%”.

Dibuat 7 Mac 2014

[KeTTHA (BP)9/14 Klt 5; PN(PU2)693/V]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Menteri Tenaga, Teknologi Hijau dan Air

5

RENEWABLE ENERGY ACT 2011

RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2014

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Renewable Energy (Amendment of

Schedule) Order 2014.

Suggest a correction

(2)

This Order comes into operation on 15 March 2014.

Amendment of Schedule 2.

The Schedule to the Renewable Energy Act 2011 [Act 725] is amended by substituting for the item “Solar photovoltaic” and other items relating to it the following items:

First

Column

Second Column

Third

Column

Fourth Column

Fifth

Column

Renewable resource

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

“Solar photovoltaic

Suggest a correction

(a)

Renewable energy installation having an installed capacity of:

Basic feed-in tariff

Suggest a correction

(ii)

above 4

kilowatts, and up to and including 12 kilowatts

(individual)

Suggest a correction

(iii)

up to and including 4

kilowatts

(non-individual)

Suggest a correction

(iv)

above 4 kilowatts, and up to and including 24

kilowatts

(non-individual)

Suggest a correction

(v)

above 24

kilowatts, and up to and including 72

kilowatts

(non-individual)

Suggest a correction

(vi)

above 72

kilowatts, and up to and including 1

megawatt

(non-individual)

Suggest a correction

(vii)

above 1 megawatt, and up to and including 10

megawatts

(non-individual)

Suggest a correction

(viii)

above 10 megawatts, and up to and including 30

megawatts

(non-individual)

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a)

above:

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

Suggest a correction

(i)

use as installation in building or building structures

+ 0.2153 21 years 10%

Suggest a correction

(ii)

use as building materials

+ 0.2070 21 years 10%

Suggest a correction

(iii)

use of locally manufactured or assembled solar photovoltaic modules

+ 0.05 21 years 0%

Suggest a correction

(iv)

use of locally manufactured or assembled solar inverters

+ 0.05 21 years 0%”.

Made 7 March 2014

[KeTTHA (BP)9/14 Klt 5; PN(PU2)693/V]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Minister of Energy, Green Technology and Water

Suggest a correction

Common questions

What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 is Malaysia P.U. (A), cited as P.U. (A) 70 2014, currently marked in force and first recorded in 2014.
Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 still in force?
Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 is currently in force.
When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 take effect?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 was first recorded in 2014.
How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 have?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 contains 18 sections.
Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014?
The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 is published at lom.agc.gov.my.