Electricity Supply Act 1990 · Updated to 1 Nov 2023 · Part VI · Supply by Licensee
27. Power to recover expenses
Feedback & supportWhere any supply line or electrical plant or equipment is provided by a licensee pursuant to subsection 24(1), the licensee may require any expenses reasonably incurred as determined by the Commission to be defrayed by the person requiring the supply of electricity to such extent as is reasonable having regard to the circumstances.
supply line
“supply line” means a conductor or conductors or other means of conveying, transmitting or distributing electricity, together with any casing, coating, covering, tube, pipe, insulator or post enclosing, surrounding or supporting the same or any part thereof, or any building or equipment connected therewith for the purpose of transforming, conveying, transmitting or distributing electricity;
The expenses reasonably incurred in providing any supply line or electrical plant or equipment under subsection (1) include the capitalized value of any expenses likely to be so incurred in maintaining it, if such expenses cannot be recovered by the licensee as part of the tariffs levied by him for the supply.
equipment
“equipment” includes any item for such purposes as generation, conversion, transmission, distribution or utilization of electrical energy or communications such as machines, transformers, apparatus, measuring instruments, protective devices, wiring materials, accessories, electrical product, consumer electrical equipment and appliances;