Skip to content
In forceUpdated to 1 Aug 2020Read it in Bahasa Malaysia

Part III · Voluntary Patrolling Scheme

16. Operation of Voluntary Patrolling Scheme

Feedback & support
(1)

The Director General shall require the Voluntary Patrolling

Scheme to be commenced by the Rukun Tetangga Area Committee within thirty days from the date of the approval under section 15 or within such longer period as may be determined by the Director

General.

(2)

If the operation of the Voluntary Patrolling Scheme is not commenced within the period specified under subsection (1), the approval under section 15 shall lapse.

(3)

The Rukun Tetangga Area Committee shall be responsible for the Voluntary Patrolling Scheme in the Area.

Rukun Tetangga 13

Report