Skip to content
In forceUpdated to 31 Dec 2025Read it in Bahasa Malaysia
Contents

Part II · Feed-In Tariff System

4. Eligibility for participation in feed-in tariff system

A person shall be eligible to apply for a feed-in approval allowing the person to participate in the feed-in tariff system if—

(a)

the person proposes to generate renewable energy from a renewable energy installation having an installed capacity of not more than thirty megawatts or such higher installed capacity as may be approved by the Minister; and

(b)

the person meets such other criteria as may be prescribed by the Authority from time to time.

Report

Part III

Connection, Purchase and Distribution of Renewable Energy

Part IV

Feed-In Tariff

Part V

Renewable Energy Fund

Part VI

Information Gathering Powers

Part VII

Enforcement

Part VIII

General

Part IX

Savings and Transitional

Schedules