Skip to content

Section 34

Period of Interim Protection Order

of National Heritage Act 2005

ActIn forceProvision 34 of 126
Section 34

(1)

An Interim Protection Order shall continue to be in force—

(a)

for a period of ninety days or for such further period as may be extended by the Commissioner under subsection (2); or

(b)

until—

(i)

the site is designated as a heritage site;

(ii)

the Commissioner makes a decision not to proceed with the proposed designation of the site; or

(iii)

the Commissioner revokes the Interim Protection

Order.

(2)

The Commissioner may at any time extend the period during which an Interim Protection Order continues to remain in force.

(3)

A notice of an extension shall be served in the same manner as the Interim Protection Order is served.