Skip to content
In forceUpdated to 1 Jan 2013Read it in Bahasa Malaysia

Part I · Preliminary

1. Short title, commencement and application

Feedback & support
(1)

This Act may be cited as the Gas Supply Act 1993 and shall come into force on such date as the Minister may, by notification in the Gazette, appoint.

(2)

This Act shall apply throughout Malaysia; however the

Minister may by order suspend the operation of the whole or any of the provisions of this Act in any State.

(3)

This Act shall apply to the supply of gas to consumers through pipelines—

8 Laws of Malaysia ACT 501

(a)

downstream of the last flange of the city gate station; or

(b)

from the filling connection of a storage tank or cylinder specifically used for reticulation or delivery of gas to any apparatus in any premises.

(4)

In subsection (3)—

“city gate station” means a station with gas measurement and pressure-regulating facilities where gas is received directly from the gas transmission pipelines and subsequently delivered through the gas pipeline distribution system for the supply of gas to the consumer;

“transmission pipelines” means pipelines transporting gas from the outlet of the gas processing plant or receiving terminal to the inlet of the city gate station.

Report

Part II

Establishment

Part III

Functions and Duties of Commission

Part IV

Powers of Entry, Investigation and Prosecution

Part V

Licence

Part VI

Part VII

Inquiry

Part VIII

Offences and Penalties

Part IX

General

Part X

Power to Make Regulations

Part XI

Miscellaneous

Schedules