/akn/my/act/pua/2022/306
KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
- Type
- P.U. (A)
- Status
- In force
- Enacted
- 2022
- Sections
- 7
Quick answer
About this p.u. (a)
KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 is Malaysia P.U. (A), cited as P.U. (A) 306 2022, currently marked in force and first recorded in 2022.
Opening note
Preamble
- PADA menjalankan kuasa yang diberikan oleh seksyen 35 Akta Arkitek 1967 [Akta 117], Lembaga Arkitek Malaysia, dengan kelulusan Menteri, membuat kaedah-kaedah yang berikut: Nama dan permulaan kuat kuasa
Seksyen 2
Kaedah-Kaedah Arkitek 1996 [P.U. (A) 379/1996], yang disebut “Kaedah-Kaedah ibu” dalam Kaedah-Kaedah ini, dipinda dalam kaedah 11, dengan menggantikan perkataan “satu ribu” dengan perkataan “lima ribu”.
Seksyen 3
Pindaan kaedah 16
dengan perkataan “31 Disember”.
Seksyen 4
Pindaan kaedah 16A
Kaedah-Kaedah ibu dipinda dengan menggantikan kaedah 16A dengan kaedah yang berikut:
“Fi 16A.
(1)
Fi sebagaimana yang ditetapkan dalam Bahagian Dua Jadual
Pertama yang kena dibayar kepada Lembaga hendaklah dibayar dalam bentuk kiriman wang, draf bank, cek, pemindahan wang secara elektronik atau apa-apa bentuk yang lain sebagaimana yang ditentukan oleh
Lembaga.
P.U. (A) 306 3
(2)
Lembaga boleh, dengan kelulusan Menteri, mengurangkan sebahagian atau keseluruhan fi yang ditetapkan dalam Bahagian Dua
Jadual
Jadual Pertama sebagaimana yang difikirkan perlu oleh Lembaga.”.
Pindaan kaedah 22 5.
Kaedah 22 Kaedah-Kaedah ibu dipinda—
(a)
dengan menggantikan perkataan “secara bertulis pada atau sebelum 31 Januari” di mana-mana jua terdapat dengan perkataan “secara bertulis atau melalui suatu platform elektronik pada atau sebelum 31 Disember”; dan
(b)
dengan memotong perkataan “tahun berikutan” di mana-mana jua terdapat.
Pindaan kaedah 29 6.
Kaedah 29 Kaedah-Kaedah ibu dipinda dengan menggantikan subkaedah (1)
dengan subkaedah yang berikut:
“(1)
Kecuali dengan kelulusan Lembaga yang diberikan terlebih dahulu atas sebab khas, seseorang Arkitek hanya boleh menandatangani suatu perjanjian perkhidmatan perundingan seni bina mengikut—
(a)
Kaedah-Kaedah
Arkitek
(Skala
Fi
Minimum)
2010
[P.U. (A) 53/2010];
(b)
Syarat-syarat
Guna
Khidmat dalam
Bahagian
Satu
Jadual
Jadual Ketiga; dan
(c)
Memorandum Perjanjian dalam:
(i)
Borang A, Bahagian Satu Jadual Keempat; atau
(ii)
Borang B, Bahagian Satu Jadual Keempat.”.
P.U. (A) 306 4
Pindaan kaedah 30A
7.
Kaedah 30A Kaedah-Kaedah ibu dipinda dengan memasukkan selepas subkaedah (2) subkaedah yang berikut:
“(3)
Dalam hal suatu pertubuhan perbadanan yang didaftarkan sebagai pengamal perundingan seni bina yang mempunyai pengarah tunggal, pengarah itu hendaklah merupakan seorang Arkitek.”.
Pindaan Jadual Keempat 8.
Jadual
Jadual Keempat kepada Kaedah-Kaedah ibu dipinda dalam Bahagian Satu—
(a)
dengan menggantikan kepala Jadual Keempat dengan kepala yang berikut:
“JADUAL KEEMPAT
BAHAGIAN SATU
BORANG A
[Subperenggan 29(1)(c)(i)]”; dan
(b)
dengan memasukkan selepas Borang A borang yang berikut:
“BORANG B
[Subperenggan 29(1)(c)(ii)]
MEMORANDUM PERJANJIAN ANTARA KLIEN DENGAN ARKITEK UNTUK
PERKHIDMATAN PERUNDINGAN SENI BINA DAN LEMBAGA SEBAGAI PEMEGANG
TARUH BAGI FI
MEMORANDUM PERJANJIAN yang dibuat pada ___________ haribulan _____________20 _____
ANTARA __________________________________________________________________________________________
(kemudian daripada ini disebut sebagai “Klien”) pada satu pihak,
P.U. (A) 306 5
DENGAN __________________________________________________________________________________________
yang menjalankan amalan sebagai
Arkitek di
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
di bawah gaya (nama *pemilikan tunggal/perkongsian/pertubuhan perbadanan)
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
(kemudian daripada ini disebut sebagai “Arkitek”) pada pihak yang satu lagi.
BAHAWASANYA Klien berhasrat untuk melantik Arkitek untuk memberikan perkhidmatan perundingan seni bina
(perihalkan skop perkhidmatan)
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
untuk projek yang diperihalkan di sini (nyatakan tajuk projek dan lokasi)
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
(kemudian daripada ini disebut “Projek”).
MAKA DENGAN INI dipersetujui seperti yang berikut:
1.
Klien dengan ini melantik Arkitek untuk memberikan perkhidmatan perundingan seni bina untuk
Projek itu tertakluk kepada dan mengikut
Syarat-Syarat Guna Khidmat Arkitek sebagaimana yang ditetapkan dalam
Kaedah-Kaedah Arkitek 1996 dan Arkitek dengan ini menerima pelantikan itu bagi maksud memberikan perkhidmatan perundingan seni bina bagi Klien itu, tertakluk kepada dan mengikut Syarat-Syarat Guna Khidmat Arkitek.
2.
Memorandum Perjanjian ini, Syarat-Syarat Guna Khidmat Arkitek dan
Kaedah-Kaedah Arkitek (Skala Fi Minimum) 2010 hendaklah membentuk
Perjanjian antara Klien dengan Arkitek.
3.
Pihak-pihak dengan ini bersetuju bahawa semua fi yang perlu dibayar oleh Klien mengikut perjanjian hendaklah didepositkan sebagaimana dan apabila telah sampai tempohnya dan perlu dibayar, dengan Lembaga sebagai pemegang taruh selaras dengan Perjanjian ini.
P.U. (A) 306 6
4.
Arkitek hendaklah mengemukakan kepada Lembaga Borang Pelantikan
Pemegang Taruh yang telah lengkap, sebagaimana yang ditentukan oleh Lembaga dari semasa ke semasa, yang membenarkan Lembaga bertindak sebagai pemegang taruh untuk mentadbir fi Arkitek bagi pihak Klien dan juga Arkitek.
5.
Arkitek hendaklah mendapatkan pengesahan bertulis Klien bagi penyiapan dan penerimaan kerja setelah selesai setiap fasa kerja yang digariskan dalam Borang
Pelantikan Pemegang Taruh. Apabila menerima pengesahan itu, Arkitek hendaklah mengemukakan tuntutannya kepada Klien yang akan membuat bayaran kepada Lembaga dalam tempoh yang dinyatakan dalam Borang
Pelantikan Pemegang Taruh.
6.
Semasa kerja-kerja itu dijalankan, Arkitek hendaklah memaklumkan kepada
Lembaga mengenai apa-apa perubahan kepada kuantum keseluruhan fi Arkitek.
PADA MENYAKSIKAN HAL DI ATAS kedua-dua pihak dengan ini telah menurunkan tandatangan masing-masing pada hari dan tahun yang terdahulu disebut.
DITANDATANGANI OLEH:
___________________________________
Untuk dan bagi pihak
KLIEN
_______________________________
(Tandatangan Klien)
Nama:
________________________
(Saksi)
_______________________________
(Tandatangan Saksi)
Alamat: ________________________
________________________
________________________
P.U. (A) 306 7
DITANDATANGANI OLEH:
_____________________________________________________________________________________________________
*potong yang tidak berkenaan”.
Kecualian dan peralihan 9.
Bagi maksud tahun kewangan yang sedang berkuat kuasa sebaik sebelum tarikh permulaan kuat kuasa Kaedah-Kaedah ini, tempoh antara permulaan tahun kewangan tersebut sehingga berakhirnya tahun kewangan itu pada 31 Disember tahun yang sama hendaklah disifatkan sebagai tahun kewangan yang lengkap.
Dibuat 26 September 2022
[KKR.PUU.110-1/2/2 Jld.3; PN(PU2)45/VI]
DATIN Ar. YONG RAZIDAH BINTI RASHID
Yang Dipertua
Lembaga Arkitek Malaysia
Diluluskan 29 September 2022
DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF
Menteri Kanan Kerja Raya
___________________________________
Untuk dan bagi pihak
ARKITEK
_______________________________
(Tandatangan Arkitek)
Nama:
________________________
(Saksi)
_______________________________
(Tandatangan Saksi)
Alamat: ________________________
________________________
________________________
P.U. (A) 306 8
ARCHITECTS ACT 1967
ARCHITECTS (AMENDMENT) RULES 2022
IN exercise of the powers conferred by section 35 of the Architects Act 1967 [Act 117], the Board of Achitects Malaysia, with the approval of the Minister, makes the following rules:
Citation and commencement 1.
(1)
This rules may be cited as the Architects (Amendment) Rules 2022.
(2)
This Rules comes into operation on 1 October 2022.
Amendment of rule 11 2.
The Architects Rules 1996 [P.U. (A) 379/1996], which is referred to as the
“principal Rules” in these Rules, are amended in rule 11, by substituting for the words
“one thousand” the words “five thousand”.
Amendment of rule 16 3.
Rule 16 of the principal Rules is amended by substituting for the words “30 day of June” the words “31 December”.
Amendment of rule 16A
4.
The principal Rules is amended by substituting for rule 16A the following rule:
“Fees 16A. (1)
The fees as prescribed in
Part
Two of the
First Schedule made payable to the Board shall be paid in the form of money order, bank draft, cheque, an electronic fund transfer or any other form as determined by the Board.
(2)
The Board may, with the approval of the Minister, reduce partly or wholly any fees prescribed in
Part
Two of the
First Schedule as the Board deems necessary.”.
P.U. (A) 306 9
Amendment of rule 22 5.
Rule 22 of the principal Rules is amended—
(a)
by substituting for the words “in writing on or before 31 January” wherever appearing the words “in writing or through an electronic platform on or before 31 December”; and
(b)
by deleting the words “following the year” wherever appearing.
Amendment of rule 29 6.
Rule 29 of the principal Rules is amended by substituting for subrule (1)
the following subrule:
“(1)
Except with the prior approval of the Board given for special reasons, an Architect shall only enter into an agreement for architectural consultancy services according to—
(a)
the Architects (Scale of Minimum Fees) Rules 2010
[P.U. (A) 53/2010];
(b)
the Conditions of Engagement in Part One of the
Third Schedule; and
(c)
the Memorandum of Agreement in:
(i)
Form A, Part One of the Fourth Schedule; or
(ii)
Form B, Part One of the Fourth Schedule.”.
P.U. (A) 306 10
Amendment of rule 30A
7.
Rule 30A of the principal Rules is amended by inserting after subrule (2)
the following subrule:
“(3)
In the case of a body corporate registered as an architectural consultancy practice having a single director, the director shall be an Architect.”.
Amendment of Fourth Schedule 8.
The Fourth Schedule to the principal Rules is amended in Part One—
(a)
by substituting for the heading of the Fourth Schedule with the following heading:
“FOURTH SCHEDULE
PART ONE
FORM A
[Subparagraph 29(1)(c)(i)]”; and
(b)
by inserting after FORM A the following form:
“FORM B
[Subparagraph 29(1)(c)(ii)]
MEMORANDUM OF AGREEMENT BETWEEN THE CLIENT AND THE ARCHITECT FOR
ARCHITECTURAL CONSULTANCY SERVICES AND THE BOARD AS THE STAKEHOLDER
FOR THE FEES
MEMORANDUM OF AGREEMENT made this ____________ day of ____________________ 20 _____
BETWEEN ________________________________________________________________________________________
(hereinafter called “the Client”) of the one part,
P.U. (A) 306 11
AND _______________________________________________________________________________________________
practising Architect(s) at ________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
under the style of (name of *sole proprietorship/partnership/body corporate)
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
(hereinafter called “the Architect”) of the other part.
WHEREAS the Client is desirous of appointing the Architect to provide architectural consultancy services
(describe the scope of works)
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
for the project described herein (indicate the project title and location)
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
(hereinafter called “the Project”).
NOW IT IS HEREBY agreed as follows:
1.
The Client hereby appoints the Architect to provide architectural consultancy services for the Project subject to and in accordance with the Conditions of
Engagement of an Architect as prescribed in the Architects Rules 1996 and the
Architect hereby accepts the appointment for the purpose of providing architectural consultancy services for the Client, subject to and in accordance with the Conditions of Engagement for an Architect.
2.
This Memorandum of Agreement, the Conditions of Engagement of an Architect and the Architects (Scale of Minimum Fees) Rules 2010 shall constitute the
Agreement between the Client and the Architect.
3.
The parties hereby agree that all the fees payable by the Client in accordance with this Agreement shall be deposited as and when they become due and payable, with the Board as a stakeholder in accordance with this Agreement.
P.U. (A) 306 12
4.
The Architect shall submit to the Board the duly executed Stakeholder
Appointment Form, as to be determined by the Board from time to time, authorizing the Board to administer the Architect’s fees on behalf of the Client and
Architect.
5.
The Architect shall obtain the Client’s written confirmation of the completion and acceptance of works upon completion of each phase of works outlined in the
Stakeholder Appointment Form. Upon receiving such confirmation, the Architect shall submit his claim to the Client who shall make payment to the Board within the period stipulated in the Stakeholder Appointment Form.
6.
During the course of the works, the Architect shall notify the Board of any changes to the overall quantum of the Architect’s fees.
IN WITNESS WHEREOF the parties have hereinto set their hands on the day and year first above written.
SIGNED BY:
___________________________________
For and on behalf of the
CLIENT
_______________________________
(Signature of Client)
Name:
________________________
(Witness)
_______________________________
(Signature of Witness)
Address: ________________________
________________________
________________________
P.U. (A) 306 13
SIGNED BY:
_____________________________________________________________________________________________________
*delete whichever is not applicable”.
Savings and transitional 9.
For the purposes of financial year for the time being in force immediately before the date of coming into operation of this Rules, the period from the beginning of the financial year until its end on 31 December of the same year shall be deemed as a complete financial year.
Made 26 September 2022
[KKR.PUU.110-1/2/2 Jld.3; PN(PU2)45/VI]
DATIN Ar. YONG RAZIDAH BINTI RASHID
President
Board of Architect Malaysia
Approved 29 September 2022
DATO’ SRI HAJI FADILLAH BIN HAJI YUSOF
Senior Minister of Works
___________________________________
For and on behalf of the
ARCHITECT
_______________________________
(Signature of Architect)
Name:
________________________
(Witness)
_______________________________
( Signature of Witness )
Address: ________________________
________________________
________________________
Common questions
- What is KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022?
- KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 is Malaysia P.U. (A), cited as P.U. (A) 306 2022, currently marked in force and first recorded in 2022.
- Is KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 still in force?
- Yes — KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 is currently in force.
- When did KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 take effect?
- KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 was first recorded in 2022.
- How many sections does KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 have?
- KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 contains 4 sections.
- Where can I read the official version of KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022?
- The official text of KAEDAH-KAEDAH ARKITEK (PINDAAN) 2022 is published at lom.agc.gov.my.