/akn/my/act/pua/2025/33

PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2025
Sections
4

Quick answer

About this p.u. (a)

PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 is Malaysia P.U. (A), cited as P.U. (A) 33 2025, currently marked in force and first recorded in 2025.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 3 Akta Jalan Persekutuan 1959 [Akta 376], Menteri, setelah berunding dengan Kerajaan Negeri Terengganu, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Perintah Jalan Persekutuan (Malaysia Barat) 1989 [P.U. (A) 401/1989]

Open as pageSuggest a correction

dipinda dalam Jadual Pertama di bawah kepala Negeri Terengganu Darul Iman—

(a)

dengan menggantikan butiran 1 dengan butiran yang berikut:

“1.

(Laluan 3): Jalan Chukai-Pasir Puteh

Bermula dari sempadan negeri Pahang-Terengganu di koordinat

U

Suggest a correction

Seksyen 103

Open as pageSuggest a correction

429669

dan berakhir di koordinat

U 5.747654, T 102.434056 termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam PETA 13: JALAN CHUKAI-PASIR PUTEH

(jarak sepanjang 263.512 km).”;

(c)

dengan menggantikan butiran 16 dengan butiran yang berikut:

“16. (Laluan 174): Jalan Sultan Mahmud-Jalan Sultan Zainal Abidin

P.U. (A) 33 3

Bermula dari persimpangan dengan Laluan 3, Jalan Chukai-Kuala Terengganu di koordinat U 5.318774, T 103.153457 dan berakhir di koordinat U 5.337422, T 103.137801 termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam

PETA

22:

JALAN SULTAN MAHMUD-JALAN SULTAN ZAINAL ABIDIN

(jarak sepanjang 3.444 km).”;

Suggest a correction

(d)

dengan menggantikan PETA 13: JALAN KUANTAN-KUALA TERENGGANU,

NEGERI TERENGGANU DARUL IMAN dengan peta yang berikut:

P.U. (A) 33 4

“PETA 13: JALAN CHUKAI-PASIR PUTEH

Suggest a correction

(e)

dengan memasukkan selepas PETA 21: JALAN AJIL–KUALA BERANG peta yang berikut:

”; dan

P.U. (A) 33 5

“PETA 22: JALAN SULTAN MAHMUD-JALAN SULTAN ZAINAL ABIDIN

Dibuat 23 Januari 2025

[KKR.100-1/2/21; PN(PU2)391/JLD.51]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]

”.

P.U. (A) 33 6

FEDERAL ROADS ACT 1959

FEDERAL ROADS (WEST MALAYSIA) (AMENDMENT) ORDER 2025

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959 [Act 376], the Minister, after consultation with the State Government of Terengganu, makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Federal Roads (West Malaysia)

(Amendment) Order 2025.

Suggest a correction

(2)

This Order comes into operation on 27 January 2025.

Amendment of First Schedule 2.

The Federal Roads (West Malaysia) Order 1989 [P.U. (A) 401/1989]

is amended in the First Schedule under the heading of Negeri Terengganu Darul Iman—

(a)

by substituting for item 1 the following item:

“1.

(Route 3): Chukai-Pasir Puteh Road

Starting from Pahang-Terengganu state boundary at coordinates

N 4.183961, E 103.429669 and ending at coordinates N 5.747654,

E 102.434056 including its link road within the boundaries of right of way as shown on MAP 13: CHUKAI-PASIR PUTEH ROAD

(a distance of 263.512 km).”;

Suggest a correction

(c)

by substituting for item 16 the following item:

“16. (Route 174): Sultan Mahmud Road-Sultan Zainal Abidin Road

P.U. (A) 33 7

Starting from the junction of Route 3, Chukai-Kuala Terengganu

Road at coordinates N 5.318774, E 103.153457 and ending at coordinates N 5.337422, E 103.137801 including its link road within the boundaries of right of way as shown on MAP 22:

SULTAN MAHMUD ROAD-SULTAN ZAINAL ABIDIN ROAD

(a distance of 3.444 km).”;

Suggest a correction

(d)

by substituting for MAP 13: KUANTAN-KUALA TERENGGANU ROAD,

NEGERI TERENGGANU DARUL IMAN the following map:

P.U. (A) 33 8

“MAP 13: CHUKAI-PASIR PUTEH ROAD

Suggest a correction

(e)

by inserting after MAP 21: AJIL–KUALA BERANG ROAD the following map:

”; and

P.U. (A) 33 9

“MAP 22: SULTAN MAHMUD ROAD-SULTAN ZAINAL ABIDIN ROAD

”.

Made 23 January 2025

[KKR.100-1/2/21; PN(PU2)391/JLD.51]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]

Suggest a correction
Suggest a correction

Common questions

What is PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025?
PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 is Malaysia P.U. (A), cited as P.U. (A) 33 2025, currently marked in force and first recorded in 2025.
Is PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 still in force?
Yes — PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 is currently in force.
When did PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 take effect?
PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 was first recorded in 2025.
How many sections does PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 have?
PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 contains 4 sections.
Where can I read the official version of PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025?
The official text of PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 is published at lom.agc.gov.my.
PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) 2025 (No. 33)