Seksyen 1
(1)
Perintah ini bolehlah dinamakan Perintah Jalan Persekutuan (Sabah)
(Pindaan) 2025.
/akn/my/act/pua/2025/96
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH JALAN PERSEKUTUAN (SABAH) (PINDAAN) 2025 is Malaysia P.U. (A), cited as P.U. (A) 96 2025, currently marked in force and first recorded in 2025.
Opening note
Perintah ini bolehlah dinamakan Perintah Jalan Persekutuan (Sabah)
(Pindaan) 2025.
Perintah Jalan Persekutuan (Sabah) 1996 [P.U. (A) 366/1996], yang disebut
“Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Pertama dengan memasukkan selepas butiran (h) butiran yang berikut:
“(i)
(Laluan 1): Persimpangan Jalan Papar Spur-Donggongon
Bermula di koordinat U 5.699067, T 115.937600 dan berakhir di koordinat U 5.714048, T 116.011166 termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam
PETA 3: PERSIMPANGAN JALAN PAPAR SPUR-DONGGONGON.
Jarak sepanjang 11.388 kilometer.
(Laluan 1): Jalan Pintasan Lahad Datu
Bermula di koordinat U 5.009677, T 118.253538 dan berakhir di koordinat U 5.058925, T 118.277857 termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam
PETA 4: JALAN PINTASAN LAHAD DATU.
3
Jarak sepanjang 10.818 kilometer.”.
Pindaan Jadual Ketiga
Perintah ibu dipinda dalam Jadual Ketiga dengan memasukkan selepas
PETA 2: JALAN KOTA KINABALU-KENINGAU-TENOM peta yang berikut:
“PETA 3: PERSIMPANGAN JALAN PAPAR SPUR-DONGGONGON
4
”.
PETA 4: JALAN PINTASAN LAHAD DATU
Bertarikh 24 Mac 2025
[KKR.100-1/2/23; PN(PU2)391/JLD.52]
DATO SRI ALEXANDER NANTA LINGGI
Menteri Kerja Raya
[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]
5
FEDERAL ROADS ACT 1959
FEDERAL ROADS (SABAH) (AMENDMENT) ORDER 2025
Opening note
This Order comes into operation on 26 March 2025.
Amendment of First Schedule 2.
The Federal Roads (Sabah) Order 1996 [P.U. (A) 366/1996] which is referred to as the “principal Order” in this Order, is amended in the First Schedule by Inserting after item (h) the following items:
“(i)
(Route 1): Junction of Papar Spur-Donggongon Road
Starting at coordinates N 5.699067, E 115.937600 and ending at coordinates N 5.714048, E 116.011166 including its link road within the boundaries of right of way as shown on MAP 3: JUNCTION OF PAPAR
SPUR-DONGGONGON ROAD.
A distance of 11.388 kilometres.
(Route 1): Lahad Datu Bypass
Starting at coordinates N 5.009677, E 118.253538 and ending at coordinates N 5.058925, E 118.277857 including its link road within the boundaries of right of way as shown on MAP 4: LAHAD DATU BYPASS.
6
A distance of 10.818 kilometres.”.
Amendment of Third Schedule 3.
The principal Order is amended in the Third Schedule by inserting after
MAP 2: KOTA KINABALU-KENINGAU-TENOM ROAD the following maps:
“MAP 3: JUNCTION OF PAPAR SPUR-DONGGONGON ROAD
7
”.
MAP 4: LAHAD DATU BYPASS
Dated 24 March 2025
[KKR.100-1/2/23; PN(PU2)391/JLD.52]
DATO SRI ALEXANDER NANTA LINGGI
Minister of Works