Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
- Enacted
- 2025
- Sections
- 3
Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 is Malaysia P.U. (A), cited as P.U. (A) 54 2025, currently marked in force and first recorded in 2025.
Front matterCover and publication detailsOpenClose
P.U. (A) 54
WARTA KERAJAAN PERSEKUTUAN
FEDERAL GOVERNMENT
GAZETTE
PERINTAH JALAN PERSEKUTUAN (SARAWAK)
(PINDAAN) 2025
FEDERAL ROADS (SARAWAK) (AMENDMENT)
ORDER 2025
DISIARKAN OLEH/
JABATAN PEGUAM NEGARA/
ATTORNEY GENERAL’S CHAMBERS
P.U. (A) 54 2
AKTA JALAN PERSEKUTUAN 1959
PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) 2025
Opening note
Preamble
- PADA menjalankan kuasa yang diberikan oleh seksyen 3 Akta Jalan Persekutuan 1959 [Akta 376], Menteri, setelah berunding dengan Kerajaan Negeri Sarawak, membuat perintah yang berikut: Nama dan permulaan kuat kuasa
Seksyen 2
Perintah Jalan Persekutuan (Sarawak) 1996 [P.U. (A) 551/1996], yang disebut
“Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Pertama di bawah kepala LEBUHRAYA PAN BORNEO, dengan memasukkan selepas butiran (jq)
butiran yang berikut:
“(jr)
(Laluan 1): Jambatan Sungai Buluh-Jambatan Sungai Arip
Bermula di koordinat U 2.561851, T 112.447681 dan berakhir di koordinat U 2.727114, T 112.668613 termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam PETA JAMBATAN SUNGAI BULUH-JAMBATAN SUNGAI ARIP
(jarak sepanjang 38.583 km).”.
Pindaan Jadual Ketiga
Seksyen 3
Perintah ibu dipinda dalam Jadual Ketiga dengan memasukkan selepas
PETA JAMBATAN SUNGAI ARIP-PEKAN TATAU peta yang berikut:
P.U. (A) 54 3
“PETA JAMBATAN SUNGAI BULUH-JAMBATAN SUNGAI ARIP
Dibuat 6 Februari 2025
[KKR.100-1/2/23; PN(PU2)391/JLD.52]
DATO SRI ALEXANDER NANTA LINGGI
Menteri Kerja Raya
[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]
”.
P.U. (A) 54 4
FEDERAL ROADS ACT 1959
FEDERAL ROADS (SARAWAK) (AMENDMENT) ORDER 2025
Opening note
Preamble
- IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959 [Act 376], the Minister, after consultation with the State Government of Sarawak, makes the following order: Citation and commencement 1.
(2)
This Order comes into operation on 10 February 2025.
Amendment of First Schedule 2.
The Federal Roads (Sarawak) Order 1996 [P.U. (A) 551/1996], which is referred to as the “principal Order” in this Order, is amended in the First Schedule under the heading of PAN BORNEO HIGHWAY, by inserting after item (jq)
the following item:
“(jr)
(Route 1): Sungai Buluh Bridge-Sungai Arip Bridge
Starting at coordinates N 2.561851, E 112.447681 and ending at coordinates N 2.727114, E 112.668613 including its link road within the boundaries of right of way as shown on
MAP
OF
SUNGAI
BULUH
BRIDGE-SUNGAI
ARIP
BRIDGE
(a distance of 38.583 km).”.
Amendment of Third Schedule 3.
The principal Order is amended in the Third Schedule by inserting after
MAP OF SUNGAI ARIP BRIDGE-TATAU TOWN the following map:
P.U. (A) 54 5
“MAP OF SUNGAI BULUH BRIDGE-SUNGAI ARIP BRIDGE
Made 6 February 2025
[KKR.100-1/2/23; PN(PU2)391/JLD.52]
DATO SRI ALEXANDER NANTA LINGGI
Minister of Works
[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]
”.
Common questions
- What is Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025?
- Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 is Malaysia P.U. (A), cited as P.U. (A) 54 2025, currently marked in force and first recorded in 2025.
- Is Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 still in force?
- Yes — Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 is currently in force.
- When did Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 take effect?
- Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 was first recorded in 2025.
- How many sections does Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 have?
- Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 contains 3 sections.
- Where can I read the official version of Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025?
- The official text of Perintah Jalan Persekutuan (Sarawak) (Pindaan) 2025 is published at lom.agc.gov.my.
Something wrong on this page?
If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.