Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 is Malaysia P.U. (A), cited as P.U. (A) 82 2015, currently marked in force and first recorded in 2015.
Front matterCover and publication detailsOpenClose
P.U. (A) 82
WARTA KERAJAAN PERSEKUTUAN
FEDERAL GOVERNMENT
GAZETTE
PERINTAH TENAGA BOLEH BAHARU
(PINDAAN JADUAL) 2015
RENEWABLE ENERGY
(AMENDMENT OF SCHEDULE) ORDER 2015
DISIARKAN OLEH/
JABATAN PEGUAM NEGARA/
ATTORNEY GENERAL’S CHAMBERS
P.U. (A) 82 2
AKTA TENAGA BOLEH BAHARU 2011
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015
Opening note
Preamble
- PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa
Seksyen 2
Pindaan Jadual
Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda dengan menggantikan butiran “Geoterma” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:
Ruang
Pertama
Ruang Kedua
Ruang Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan (dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
“Geoterma
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 30
megawatt 0.45 21 tahun 0%”.
P.U. (A) 82 3
Dibuat 29 April 2015
[KeTTHA: (S)100-1/1/5; PN(PU2)693/VII]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Menteri Tenaga, Teknologi Hijau dan Air
P.U. (A) 82 4
RENEWABLE ENERGY ACT 2011
RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2015
Opening note
Preamble
- IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.
(2)
This Order comes into operation on 6 May 2015.
Amendment of Schedule 2.
The Schedule to the Renewable Energy Act 2011 is amended by substituting for the item “Geothermal” and other items relating to it the following items:
First
Column
Second Column
Third
Column
Fourth Column
Fifth Column
Renewable resource
Description of qualifying renewable energy installation
Feed-in tariff rate (in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
“Geothermal
Renewable energy installation having an installed capacity of up to and including 30
megawatts 0.45 21 years 0%”.
Made 29 May 2015
[KeTTHA: (S)100-1/1/5; PN(PU2)693/VII]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Minister of Energy, Green Technology and Water
Common questions
- What is Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015?
- Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 is Malaysia P.U. (A), cited as P.U. (A) 82 2015, currently marked in force and first recorded in 2015.
- Is Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 still in force?
- Yes — Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 is currently in force.
- When did Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 take effect?
- Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 was first recorded in 2015.
- How many sections does Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 have?
- Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 contains 2 sections.
- Where can I read the official version of Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015?
- The official text of Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2015 is published at lom.agc.gov.my.
Something wrong on this page?
If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.