/akn/my/act/pua/2015/82

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2015
Sections
2

Quick answer

About this p.u. (a)

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 is Malaysia P.U. (A), cited as P.U. (A) 82 2015, currently marked in force and first recorded in 2015.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Open as pageSuggest a correction

Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda dengan menggantikan butiran “Geoterma” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan (dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

“Geoterma

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 30

megawatt 0.45 21 tahun 0%”.

P.U. (A) 82 3

Dibuat 29 April 2015

[KeTTHA: (S)100-1/1/5; PN(PU2)693/VII]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Menteri Tenaga, Teknologi Hijau dan Air

P.U. (A) 82 4

RENEWABLE ENERGY ACT 2011

RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2015

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Renewable Energy

(Amendment of Schedule) Order 2015.

Suggest a correction

(2)

This Order comes into operation on 6 May 2015.

Amendment of Schedule 2.

The Schedule to the Renewable Energy Act 2011 is amended by substituting for the item “Geothermal” and other items relating to it the following items:

First

Column

Second Column

Third

Column

Fourth Column

Fifth Column

Renewable resource

Description of qualifying renewable energy installation

Feed-in tariff rate (in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

“Geothermal

Renewable energy installation having an installed capacity of up to and including 30

megawatts 0.45 21 years 0%”.

Made 29 May 2015

[KeTTHA: (S)100-1/1/5; PN(PU2)693/VII]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Minister of Energy, Green Technology and Water

Suggest a correction

Common questions

What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 is Malaysia P.U. (A), cited as P.U. (A) 82 2015, currently marked in force and first recorded in 2015.
Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 still in force?
Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 is currently in force.
When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 take effect?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 was first recorded in 2015.
How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 have?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 contains 2 sections.
Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015?
The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2015 is published at lom.agc.gov.my.