Seksyen 1
Perintah ini bolehlah dinamakan
Perintah
Tenaga
Boleh
Baharu
(Pindaan Jadual) 2022.
/akn/my/act/pua/2022/131
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2022 is Malaysia P.U. (A), cited as P.U. (A) 131 2022, currently marked in force and first recorded in 2022.
Opening note
Perintah ini bolehlah dinamakan
Perintah
Tenaga
Boleh
Baharu
(Pindaan Jadual) 2022.
Pindaan Jadual
berhubung dengan sumber boleh baharu biogas, dalam ruang kedua, dalam butiran (a), dengan menggantikan perkataan “5 megawatt” dengan perkataan “30 megawatt”;
berhubung dengan sumber boleh baharu biojisim, dengan menggantikan butiran (a) dan butir-butir yang berhubungan dengannya dengan butiran dan butir-butir yang berikut:
Ruang
Pertama
Ruang Kedua
Ruang Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan (dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
Biojisim
“(a) Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang sehingga dan termasuk 30 megawatt
Kadar tarif galakan asas
2350-0.2900 21 tahun 0%”
P.U. (A) 131 3
, dalam ruang ketiga, dengan menggantikan perkataan “0.2288-0.2599” dengan perkataan
“0.2249-0.2599”; dan
, dalam ruang ketiga, dengan menggantikan perkataan “0.2749-0.2900” dengan perkataan
“0.2650-0.2900”.
Dibuat 21 April 2022
[KETSA/PUU 100-1/3 Jld.9; PN(PU2)693/VII]
DATUK SERI TAKIYUDDIN BIN HAJI HASSAN
Menteri Tenaga dan Sumber Asli
P.U. (A) 131 4
; and
RENEWABLE ENERGY ACT 2011
RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2022
Opening note
in relation to renewable resource of biogas, in the second column, in item (a), by substituting for the words “5 megawatts” the words
“30 megawatts”;
in relation to renewable resource of biomass, by substituting for item (a) and the particulars relating to it the following item and particulars:
First
Column
Second Column
Third
Column
Fourth Column
Fifth
Column
Renewable resource
Description of qualifying renewable energy installation
Feed-in tariff rate (in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
Biomass
“(a) Renewable energy installation having an installed capacity of up to and including 30 megawatts
Basic feed-in tariff rate
2350-0.2900 21 years 0%”
P.U. (A) 131 5
in relation to item (a), in the third column, by substituting for the words
“0.2288-0.2599” the words “0.2249-0.2599”; and
in relation to item (b), in the third column, by substituting for the words
“0.2749-0.2900” the words “0.2650-0.2900”.
Made 21 April 2022
[KETSA/PUU 100-1/3 Jld.9; PN(PU2)693/VII]
DATUK SERI TAKIYUDDIN BIN HAJI HASSAN
Minister of Energy and Natural Resources